State of Conservation
1827
Reports
317
Properties concerned
113
States Parties with SOC reports
Property Category:Culturalclose
States Parties: | China |
Year: | 2002 |
Document Source: | WHC-02/CONF.202/17 |
Threats*: | Management systems/ management plan |
States Parties: | China |
Year: | 2001 |
Document Source: | WHC-01/CONF.208/10,WHC-2001/CONF.205/5 |
Threats*: | Management systems/ management plan |
States Parties: | China |
Year: | 2000 |
Document Source: | WHC-2000/CONF.202/5,WHC-2000/CONF.204/10 |
Threats*: | Management systems/ management plan |
States Parties: | China |
Year: | 1999 |
Document Source: | WHC-99/CONF.204/5,WHC-99/CONF.209/14 |
Threats*: | Management systems/ management plan |
States Parties: | China |
Year: | 1998 |
Document Source: | WHC-98/CONF.203/8Rev. |
Threats*: | Management systems/ management plan |
States Parties: | China |
Year: | 1996 |
Document Source: | WHC-96/CONF.201/7B |
Threats*: | Management systems/ management plan |
States Parties: | Suriname |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Suriname |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Suriname |
Year: | 2018 |
Document Source: | WHC/18/42.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Suriname |
Year: | 2016 |
Document Source: | WHC/16/40.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Suriname |
Year: | 2014 |
Document Source: | WHC-14/38.COM/7B |
Threats*: | Management systems/ management plan |
Other Threats: | Need to implement urgent measurements in Inner City to address decay and erosion of the attributes of the property. |
States Parties: | Saudi Arabia |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B |
Threats*: | Management systems/ management plan |
Other Threats: | High rate of decay of the historic houses |
States Parties: | Saudi Arabia |
Year: | 2021 |
Document Source: | WHC/21/44.COM/7B |
Threats*: | Management systems/ management plan |
Other Threats: | High rate of decay of the historic houses |
States Parties: | Saudi Arabia |
Year: | 2018 |
Document Source: | WHC/18/42.COM/7B |
Threats*: | Management systems/ management plan |
Other Threats: | High rate of decay of the historic houses |
States Parties: | Saudi Arabia |
Year: | 2016 |
Document Source: | WHC/16/40.COM/7B |
Threats*: | Management systems/ management plan |
Other Threats: | High rate of decay of the historic houses |
States Parties: | Democratic People's Republic of Korea |
Year: | 2019 |
Document Source: | WHC/19/43.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Democratic People's Republic of Korea |
Year: | 2017 |
Document Source: | WHC/17/41.COM/7B.Add |
Threats*: | Management systems/ management plan |
States Parties: | Democratic People's Republic of Korea |
Year: | 2015 |
Document Source: | WHC-15/39.COM/7B.Add |
Threats*: | Management systems/ management plan |
States Parties: | Bangladesh |
Year: | 1995 |
Document Source: | WHC-95/CONF.201/4 |
Threats*: | Management systems/ management plan |
States Parties: | Uruguay |
Year: | 2012 |
Document Source: | WHC-12/36.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Uruguay |
Year: | 2011 |
Document Source: | WHC-11/35.COM/7B.Add |
Threats*: | Management systems/ management plan |
States Parties: | Uruguay |
Year: | 2009 |
Document Source: | WHC-09/33.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Uruguay |
Year: | 2008 |
Document Source: | WHC-08/32.COM/7B.Add2 |
Threats*: | Management systems/ management plan |
States Parties: | Uruguay |
Year: | 2005 |
Document Source: | WHC-05/29.COM/7B.Rev |
Threats*: | Management systems/ management plan |
States Parties: | Uruguay |
Year: | 2004 |
Document Source: | WHC-04/28.COM/15B |
Threats*: | Management systems/ management plan |
States Parties: | Uruguay |
Year: | 2003 |
Document Source: | WHC.03/27.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Chile |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Chile |
Year: | 2021 |
Document Source: | WHC/21/44.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Chile |
Year: | 2019 |
Document Source: | WHC/19/43.COM/7B,WHC/19/43.COM/INF.7.Rev.4 |
Threats*: | Management systems/ management plan |
Other Threats: | Fire |
States Parties: | Chile |
Year: | 2017 |
Document Source: | WHC/17/41.COM/7B |
Threats*: | Management systems/ management plan |
Other Threats: | Fire |
States Parties: | Chile |
Year: | 2015 |
Document Source: | WHC-15/39.COM/7B.Add |
Threats*: | Management systems/ management plan |
Other Threats: | Fire |
States Parties: | Chile |
Year: | 2014 |
Document Source: | WHC-14/38.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Chile |
Year: | 2013 |
Document Source: | WHC-13/37.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Côte d'Ivoire |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B.Add |
Threats*: | Management systems/ management plan |
States Parties: | Côte d'Ivoire |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Côte d'Ivoire |
Year: | 2017 |
Document Source: | WHC/17/41.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Côte d'Ivoire |
Year: | 2015 |
Document Source: | WHC-15/39.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Côte d'Ivoire |
Year: | 2013 |
Document Source: | WHC-13/37.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Brazil |
Year: | 2004 |
Document Source: | WHC-04/28.COM/15B |
Threats*: | Management systems/ management plan |
States Parties: | Brazil |
Year: | 2003 |
Document Source: | WHC.03/27.COM/7B |
Threats*: | Management systems/ management plan |
Other Threats: | Fire |
States Parties: | Brazil |
Year: | 1993 |
Document Source: | WHC-93/CONF.002/14 |
Threats*: | Management systems/ management plan |
States Parties: | Brazil |
Year: | 1990 |
Document Source: | CC-90/CONF.004/3 |
Threats*: | Management systems/ management plan |
States Parties: | Yemen |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7A.Add |
Threats*: | Management systems/ management plan |
Other Threats: | Serious degradation of the city’s heritage (many houses and the ancient souq are in an alarming state of deterioration) |
Danger List: | Yes |
States Parties: | Yemen |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7A.Add |
Threats*: | Management systems/ management plan |
Danger List: | Yes |
States Parties: | Yemen |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7A.Add |
Threats*: | Management systems/ management plan |
Danger List: | Yes |
States Parties: | Yemen |
Year: | 2019 |
Document Source: | WHC/19/43.COM/7A.add.2 |
Threats*: | Management systems/ management plan |
Danger List: | Yes |
States Parties: | Yemen |
Year: | 2018 |
Document Source: | WHC/18/42.COM/7A.Add |
Threats*: | Management systems/ management plan |
Danger List: | Yes |
States Parties: | Yemen |
Year: | 2017 |
Document Source: | WHC/17/41.COM/7A.Add,WHC/17/41.COM/INF.7 Rev |
Threats*: | Management systems/ management plan |
Danger List: | Yes |
States Parties: | Yemen |
Year: | 2016 |
Document Source: | WHC/16/40.COM/7A.Add |
Threats*: | Management systems/ management plan |
Danger List: | Yes |
States Parties: | Yemen |
Year: | 2015 |
Document Source: | WHC-15/39.COM/7A,WHC-15/39.COM/INF.7,WHC-15/39.COM/INF.7Rev |
Threats*: | Management systems/ management plan |
Danger List: | Yes |
States Parties: | Yemen |
Year: | 2014 |
Document Source: | WHC-14/38.COM/7A |
Threats*: | Management systems/ management plan |
Danger List: | Yes |
States Parties: | Yemen |
Year: | 2013 |
Document Source: | WHC-13/37.COM/7A |
Threats*: | Management systems/ management plan |
Danger List: | Yes |
States Parties: | Yemen |
Year: | 2012 |
Document Source: | WHC-12/36.COM/7A.Add |
Threats*: | Management systems/ management plan |
Danger List: | Yes |
States Parties: | Yemen |
Year: | 2011 |
Document Source: | WHC-11/35.COM/7A |
Threats*: | Management systems/ management plan |
Other Threats: | Serious degradation of the city’s heritage (many houses and the ancient souq are in an alarming deterioration state) |
Danger List: | Yes |
States Parties: | Yemen |
Year: | 2010 |
Document Source: | WHC-10/34.COM/7A.Add |
Threats*: | Management systems/ management plan |
Other Threats: | Serious degradation of the city’s heritage (many houses and the ancient souq are in an alarming deterioration state) |
Danger List: | Yes |
States Parties: | Yemen |
Year: | 2009 |
Document Source: | WHC-09/33.COM/7A |
Threats*: | Management systems/ management plan |
Other Threats: | Serious degradation of the city’s heritage (many houses and the ancient souq are in an alarming deterioration state) |
Danger List: | Yes |
States Parties: | Yemen |
Year: | 2005 |
Document Source: | WHC-05/29.COM/7A |
Threats*: | Management systems/ management plan |
Other Threats: | Deterioration of the traditional urban fabric |
Danger List: | Yes |
States Parties: | Yemen |
Year: | 2004 |
Document Source: | WHC-04/28.COM/15A.Rev |
Threats*: | Management systems/ management plan |
Other Threats: | Deteriorated state of some of the monuments |
Danger List: | Yes |
States Parties: | Yemen |
Year: | 2003 |
Document Source: | WHC.03/27.COM/7A |
Threats*: | Management systems/ management plan |
Other Threats: | Lack of conservation measures |
Danger List: | Yes |
States Parties: | Yemen |
Year: | 2002 |
Document Source: | WHC-02/CONF.202/18 |
Threats*: | Management systems/ management plan |
Other Threats: | Lack of conservation measures |
Danger List: | Yes |
States Parties: | Yemen |
Year: | 2001 |
Document Source: | WHC-01/CONF.208/09,WHC-01/CONF.208/9,WHC-2001/CONF.205/4 |
Threats*: | Management systems/ management plan |
Other Threats: | Lack of conservation measures |
Danger List: | Yes |
States Parties: | Peru |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Peru |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Peru |
Year: | 2018 |
Document Source: | WHC/18/42.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Peru |
Year: | 2016 |
Document Source: | WHC/16/40.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Peru |
Year: | 2014 |
Document Source: | WHC-14/38.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Peru |
Year: | 2013 |
Document Source: | WHC-13/37.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Peru |
Year: | 2012 |
Document Source: | WHC-12/36.COM/7B.Add |
Threats*: | Management systems/ management plan |
States Parties: | Peru |
Year: | 2011 |
Document Source: | WHC-11/35.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Peru |
Year: | 2010 |
Document Source: | WHC-10/34.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Russian Federation |
Year: | 2016 |
Document Source: | WHC/16/40.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Russian Federation |
Year: | 2014 |
Document Source: | WHC-14/38.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Russian Federation |
Year: | 2013 |
Document Source: | WHC-13/37.COM/7B.Add |
Threats*: | Management systems/ management plan |
States Parties: | Pakistan |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7B |
Threats*: | Management systems/ management plan |
Other Threats: | Stability of the foundations (earth mechanics) of the Jam Nizamuddin tomb |
States Parties: | Pakistan |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B.Add |
Threats*: | Management systems/ management plan |
Other Threats: | Stability of the foundations (earth mechanics) of the Jam Nizamuddin tomb |
States Parties: | Pakistan |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B |
Threats*: | Management systems/ management plan |
Other Threats: | Stability of the foundations (earth mechanics) of the Jam Nizamuddin tomb |
States Parties: | Pakistan |
Year: | 2019 |
Document Source: | WHC/19/43.COM/7B,WHC/19/43.COM/INF.7.Rev.4 |
Threats*: | Management systems/ management plan |
Other Threats: | Stability of the foundations (earth mechanics) of the Jam Nizamuddin tomb |
States Parties: | Pakistan |
Year: | 2017 |
Document Source: | WHC/17/41.COM/7B |
Threats*: | Management systems/ management plan |
Other Threats: | Stability of the foundations (earth mechanics) of the Jam Nizamuddin tomb |
States Parties: | Pakistan |
Year: | 2016 |
Document Source: | WHC/16/40.COM/7B.Add |
Threats*: | Management systems/ management plan |
Other Threats: | Stability of the foundations (earth mechanics) of the Jam Nizamuddin tomb |
States Parties: | Pakistan |
Year: | 2015 |
Document Source: | WHC-15/39.COM/7B.Add |
Threats*: | Management systems/ management plan |
Other Threats: | Stability of the foundations (earth mechanics) of the Jam Nizamuddin tomb |
States Parties: | Pakistan |
Year: | 2013 |
Document Source: | WHC-13/37.COM/7B |
Threats*: | Management systems/ management plan |
Other Threats: | Stability of the foundations (earth mechanics) of the Jam Nizamuddin tomb |
States Parties: | Pakistan |
Year: | 2012 |
Document Source: | WHC-12/36.COM/7B.Add |
Threats*: | Management systems/ management plan |
Other Threats: | Stability of the foundations (earth mechanics) of the Jam Nizamuddin tomb |
States Parties: | Pakistan |
Year: | 2011 |
Document Source: | WHC-11/35.COM/7B |
Threats*: | Management systems/ management plan |
Other Threats: | b) Stability of the foundations (earth mechanics) of the Jam Nizamuddin tomb; |
States Parties: | Pakistan |
Year: | 2009 |
Document Source: | WHC-09/33.COM/7B |
Threats*: | Management systems/ management plan |
Other Threats: | a) Significant decay of the property caused by local climatic conditions and alluvial erosionb) Stability of the foundations (earth mechanics) of the Jam Nizamuddin tombd) Lack of monitoring |
States Parties: | Georgia |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B.Add.2 |
Threats*: | Management systems/ management plan |
States Parties: | Georgia |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B.Add |
Threats*: | Management systems/ management plan |
States Parties: | Georgia |
Year: | 2018 |
Document Source: | WHC/18/42.COM/7B.Add |
Threats*: | Management systems/ management plan |
States Parties: | Georgia |
Year: | 2017 |
Document Source: | WHC/17/41.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Georgia |
Year: | 2016 |
Document Source: | WHC/16/40.COM/7A |
Threats*: | Management systems/ management plan |
Danger List: | Yes |
States Parties: | Georgia |
Year: | 2015 |
Document Source: | WHC-15/39.COM/7A |
Threats*: | Management systems/ management plan |
Danger List: | Yes |
States Parties: | Georgia |
Year: | 2012 |
Document Source: | WHC-12/36.COM/7A.Add |
Threats*: | Management systems/ management plan |
Danger List: | Yes |
States Parties: | Georgia |
Year: | 2011 |
Document Source: | WHC-11/35.COM/7A |
Threats*: | Management systems/ management plan |
Danger List: | Yes |
States Parties: | Georgia |
Year: | 2010 |
Document Source: | WHC-10/34.COM/7A.Add |
Threats*: | Management systems/ management plan |
Danger List: | Yes |
States Parties: | Georgia |
Year: | 2009 |
Document Source: | WHC-09/33.COM/7B |
Threats*: | Management systems/ management plan |
Other Threats: | f) Loss of authenticity |
States Parties: | Georgia |
Year: | 2008 |
Document Source: | WHC-08/32.COM/7B.Add |
Threats*: | Management systems/ management plan |
States Parties: | Georgia |
Year: | 2007 |
Document Source: | WHC-07/31.COM/7B.Add |
Threats*: | Management systems/ management plan |
Other Threats: | Loss of authenticity in recent works carried out by the Church |
States Parties: | Georgia |
Year: | 2005 |
Document Source: | WHC-05/29.COM/7B.Rev |
Threats*: | Management systems/ management plan |
States Parties: | Georgia |
Year: | 2004 |
Document Source: | WHC-04/28.COM/15B |
Threats*: | Management systems/ management plan |
States Parties: | Georgia |
Year: | 1999 |
Document Source: | WHC-99/CONF.209/14 |
Threats*: | Management systems/ management plan |
Other Threats: | Critical conditions of particularly two archaeological sites |
States Parties: | Chile |
Year: | 2021 |
Document Source: | WHC/21/44.COM/7B.Add |
Threats*: | Management systems/ management plan |
Other Threats: | Extremely fragile nature of the industrial buildings; Lack of maintenance over the past 40 years. |
States Parties: | Chile |
Year: | 2019 |
Document Source: | WHC/19/43.COM/7A,WHC/19/43.COM/INF.7.Rev.4 |
Threats*: | Management systems/ management plan |
Other Threats: | Extremely fragile nature of the industrial buildings that were constructed using local materials such as timber for frames, corrugated iron sheets for roofs and some walls, in addition to stucco and lightweight construction; Lack of maintenance over the past 40 years; Corrosion of metal cladding and dismantlement of some of the structural elements. A few buildings such as the Leaching House are liable to structural collapse if no support is given |
Danger List: | Yes |
States Parties: | Chile |
Year: | 2018 |
Document Source: | WHC/18/42.COM/7A |
Threats*: | Management systems/ management plan |
Other Threats: | Extremely fragile nature of the industrial buildings that were constructed using local materials such as timber for frames, corrugated iron sheets for roofs and some walls, in addition to stucco and lightweight construction; Lack of maintenance over the past 40 years; Corrosion of metal cladding and dismantlement of some of the structural elements. A few buildings such as the Leaching House are liable to structural collapse if no support is given |
Danger List: | Yes |
States Parties: | Chile |
Year: | 2017 |
Document Source: | WHC/17/41.COM/7A |
Threats*: | Management systems/ management plan |
Other Threats: | Extremely fragile nature of the industrial buildings that were constructed using local materials such as timber for frames, corrugated iron sheets for roofs and some walls, in addition to stucco and lightweight construction; Lack of maintenance over the past 40 years; Corrosion of metal cladding and dismantlement of some of the structural elements. A few buildings such as the Leaching House are liable to structural collapse if no support is given |
Danger List: | Yes |
States Parties: | Chile |
Year: | 2016 |
Document Source: | WHC/16/40.COM/7A |
Threats*: | Management systems/ management plan |
Other Threats: | Extremely fragile nature of the industrial buildings that were constructed using local materials such as timber for frames, corrugated iron sheets for roofs and some walls, in addition to stucco and lightweight construction; Lack of maintenance over the past 40 years; Corrosion of metal cladding and dismantlement of some of the structural elements. A few buildings such as the Leaching House are liable to structural collapse if no support is given; Very little conservation work carried out |
Danger List: | Yes |
States Parties: | Chile |
Year: | 2015 |
Document Source: | WHC-15/39.COM/7A |
Threats*: | Management systems/ management plan |
Other Threats: | Extremely fragile nature of the industrial buildings that were constructed using local materials such as timber for frames, corrugated iron sheets for roofs and some walls, in addition to stucco and lightweight construction; Lack of maintenance over the past 40 years; Corrosion of metal cladding and dismantlement of some of the structural elements. A few buildings such as the Leaching House are liable to structural collapse if no support is given; Very little conservation work carried out |
Danger List: | Yes |
States Parties: | Chile |
Year: | 2014 |
Document Source: | WHC-14/38.COM/7A |
Threats*: | Management systems/ management plan |
Other Threats: | a) Extremely fragile nature of the industrial buildings that were constructed using local materials such as timber for frames, corrugated iron sheets for roofs and some walls, in addition to stucco and lightweight construction; b) Lack of maintenance over the past 40 years; c) Corrosion of metal cladding and dismantlement of some of the structural elements. A few buildings such as the Leaching House are liable to structural collapse if no support is given; d) Very little conservation work carried out |
Danger List: | Yes |
States Parties: | Chile |
Year: | 2013 |
Document Source: | WHC-13/37.COM/7A.Add |
Threats*: | Management systems/ management plan |
Other Threats: | a) Extremely fragile nature of the industrial buildings that were constructed using local materials such as timber for frames, corrugated iron sheets for roofs and some walls, in addition to stucco and lightweight construction; b) Lack of maintenance over the past 40 years; c) Corrosion of metal cladding and dismantlement of some of the structural elements. A few buildings such as the Leaching House are liable to structural collapse if no support is given; d) Very little conservation work carried out |
Danger List: | Yes |
States Parties: | Chile |
Year: | 2012 |
Document Source: | WHC-12/36.COM/7A |
Threats*: | Management systems/ management plan |
Other Threats: | a) Extremely fragile nature of the industrial buildings that were constructed using local materials such as timber for frames, corrugated iron sheets for roofs and some walls, in addition to stucco and lightweight construction; b) Lack of maintenance over the past 40 years; c) Corrosion of metal cladding and dismantlement of some of the structural elements. A few buildings such as the Leaching House are liable to structural collapse if no support is given; d) Very little conservation work carried out |
Danger List: | Yes |
States Parties: | Chile |
Year: | 2011 |
Document Source: | WHC-11/35.COM/7A |
Threats*: | Management systems/ management plan |
Other Threats: | Extremely fragile nature of the industrial buildings that were constructed using local materials such as timber for frames, corrugated iron sheets for roofs and some walls, in addition to stucco and lightweight construction ; Lack of maintenance over the past 40 years ; Corrosion of metal cladding and dismantlement of some of the structural elements. A few buildings such as the Leaching House are liable to structural collapse if no support is given ; Very little conservation work carried out |
Danger List: | Yes |
States Parties: | Chile |
Year: | 2010 |
Document Source: | WHC-10/34.COM/7A.Add |
Threats*: | Management systems/ management plan |
Other Threats: | Extremely fragile nature of the industrial buildings that were constructed using local materials such as timber for frames, corrugated iron sheets for roofs and some walls, in addition to stucco and lightweight construction ; Lack of maintenance over the past 40 years ; Corrosion of metal cladding and dismantlement of some of the structural elements. A few buildings, such as the Leaching house, are liable to structural collapse if no support is given ; Very little conservation work carried out |
Danger List: | Yes |
States Parties: | Chile |
Year: | 2009 |
Document Source: | WHC-09/33.COM/7A |
Threats*: | Management systems/ management plan |
Other Threats: | Extremely fragile nature of the industrial buildings that were constructed using local materials such as timber for frames, corrugated iron sheets for roofs and some walls, in addition to stucco and lightweight construction ; Lack of maintenance over the past 40 years ; Corrosion of metal cladding and dismantlement of some of the structural elements. A few buildings, such as the Leaching house, are liable to structural collapse if no support is given ; Very little conservation work carried out |
Danger List: | Yes |
States Parties: | Chile |
Year: | 2008 |
Document Source: | WHC-08/32.COM/7A.Add |
Threats*: | Management systems/ management plan |
Other Threats: | Extremely fragile nature of the buildings that were constructed using local materials such as timber for frames, corrugated iron sheets for roofs and some walls, in addition to stucco and lightweight construction; Lack of maintenance over the past 40 years ; Corrosion of metal cladding and dismantlement of some of the structural elements. A few buildings, such as the Leaching house, are liable to structural collapse if no support is given ; Very little conservation work carried out |
Danger List: | Yes |
States Parties: | Chile |
Year: | 2007 |
Document Source: | WHC-07/31.COM/7A |
Threats*: | Management systems/ management plan |
Other Threats: | Extremely fragile nature of the buildings that were constructed using local materials such as timber for frames, corrugated iron sheets for roofs and some walls, and stucco and lightweight construction that functioned with regular maintenance; Lack of maintenance over the past 40 years ; Metal cladding corroded and some of the structural elements dismantled. A few buildings, such as the Leaching house, are liable to structural collapse if no support is given ; Very little conservation work carried ou |
Danger List: | Yes |
States Parties: | China |
Year: | 2007 |
Document Source: | WHC-07/31.COM/7B.Add |
Threats*: | Management systems/ management plan |
States Parties: | China |
Year: | 2006 |
Document Source: | WHC-06/30.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | China |
Year: | 2005 |
Document Source: | WHC-05/29.COM/7B.Rev |
Threats*: | Management systems/ management plan |
States Parties: | China |
Year: | 2004 |
Document Source: | WHC-04/28.COM/15B |
Threats*: | Management systems/ management plan |
States Parties: | Senegal |
Year: | 2006 |
Document Source: | WHC-06/30.COM/7B |
Threats*: | Management systems/ management plan |
Other Threats: | a) Building threatened to collapseb) Construction of the replica of the Goree Memoria |
States Parties: | Senegal |
Year: | 2005 |
Document Source: | WHC-05/29.COM/7B.Rev |
Threats*: | Management systems/ management plan |
Other Threats: | a) Threatened state of the buildings; b) Construction of the replica of the Goree Memoria |
States Parties: | Senegal |
Year: | 2004 |
Document Source: | WHC-04/28.COM/15B |
Threats*: | Management systems/ management plan |
Other Threats: | a) Important historic buildings in a state of serious dilapidation; b) Replica of the Gorée-Almadies Memorial |
States Parties: | Senegal |
Year: | 2003 |
Document Source: | WHC.03/27.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Mozambique |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7B.Add.2 |
Threats*: | Management systems/ management plan |
Other Threats: | Growing number of collapsed or seriously dilapidated buildings |
States Parties: | Mozambique |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B |
Threats*: | Management systems/ management plan |
Other Threats: | Growing number of collapsed or seriously dilapidated buildings |
States Parties: | Mozambique |
Year: | 2018 |
Document Source: | WHC/18/42.COM/7B.Add |
Threats*: | Management systems/ management plan |
Other Threats: | Growing number of collapsed or seriously dilapidated buildings |
States Parties: | Mozambique |
Year: | 2016 |
Document Source: | WHC/16/40.COM/7B |
Threats*: | Management systems/ management plan |
Other Threats: | Growing number of collapsed or seriously dilapidated buildings |
States Parties: | Mozambique |
Year: | 2014 |
Document Source: | WHC-14/38.COM/7B |
Threats*: | Management systems/ management plan |
Other Threats: | Growing number of collapsed or seriously dilapidated buildings |
States Parties: | Mozambique |
Year: | 2012 |
Document Source: | WHC-12/36.COM/7B.Add |
Threats*: | Management systems/ management plan |
Other Threats: | Growing number of collapsed or seriously dilapidated buildings |
States Parties: | Mozambique |
Year: | 2010 |
Document Source: | WHC-10/34.COM/7B.Add.2 |
Threats*: | Management systems/ management plan |
Other Threats: | b) Growing number of collapsed or seriously dilapidated buildings; |
States Parties: | Mozambique |
Year: | 2009 |
Document Source: | WHC-09/33.COM/7B.Add |
Threats*: | Management systems/ management plan |
Other Threats: | Growing number of collapsed or seriously dilapidated buildings; |
States Parties: | Mozambique |
Year: | 2008 |
Document Source: | WHC-08/32.COM/7B |
Threats*: | Management systems/ management plan |
Other Threats: | a) Delay in implementing rehabilitation of the San Sebastian Fortressb) Buildings threatened with collapse |
States Parties: | Mozambique |
Year: | 2007 |
Document Source: | WHC-07/31.COM/7B.Add |
Threats*: | Management systems/ management plan |
Other Threats: | Buildings threatened with collapse |
States Parties: | Mozambique |
Year: | 2006 |
Document Source: | WHC-06/30.COM/7B |
Threats*: | Management systems/ management plan |
Other Threats: | Buildings threatened with collapse |
States Parties: | Mozambique |
Year: | 2000 |
Document Source: | WHC-2000/CONF.204/10 |
Threats*: | Management systems/ management plan |
Other Threats: | Precarious state of conservation of the stone |
States Parties: | Mozambique |
Year: | 1999 |
Document Source: | WHC-99/CONF.209/14 |
Threats*: | Management systems/ management plan |
Other Threats: | Precarious state of conservation of the stone |
States Parties: | Mozambique |
Year: | 1998 |
Document Source: | WHC-98/CONF.203/8Rev. |
Threats*: | Management systems/ management plan |
Other Threats: | Precarious state of conservation of the stone |
States Parties: | Mozambique |
Year: | 1997 |
Document Source: | WHC-97/CONF.208/4B,WHC-97/CONF.208/8B |
Threats*: | Management systems/ management plan |
Other Threats: | Precarious state of conservation of the stone |
States Parties: | Mozambique |
Year: | 1995 |
Document Source: | WHC-95/CONF.203/5,WHC-95/CONF.203/5 Add.1 |
Threats*: | Management systems/ management plan |
Other Threats: | Precarious state of conservation of the stone |
States Parties: | Mozambique |
Year: | 1994 |
Document Source: | WHC.94/CONF.003/16 |
Threats*: | Management systems/ management plan |
Other Threats: | Precarious state of conservation of the stone |
States Parties: | Mozambique |
Year: | 1993 |
Document Source: | WHC-93/CONF.002/14 |
Threats*: | Management systems/ management plan |
States Parties: | Senegal |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B.Add |
Threats*: | Management systems/ management plan |
Other Threats: | Extremely poor state of conservation of numerous derelict buildings endangering occupants |
States Parties: | Senegal |
Year: | 2021 |
Document Source: | WHC/21/44.COM/7B |
Threats*: | Management systems/ management plan |
Other Threats: | Extremely poor state of conservation of numerous derelict buildings endangering occupants |
States Parties: | Senegal |
Year: | 2019 |
Document Source: | WHC/19/43.COM/7B |
Threats*: | Management systems/ management plan |
Other Threats: | Extremely poor state of conservation of numerous derelict buildings endangering occupants |
States Parties: | Senegal |
Year: | 2017 |
Document Source: | WHC/17/41.COM/7B.Add2,WHC/17/41.COM/INF.7 Rev |
Threats*: | Management systems/ management plan |
Other Threats: | Extremely poor state of conservation of numerous derelict buildings endangering occupants |
States Parties: | Senegal |
Year: | 2016 |
Document Source: | WHC/16/40.COM/7B.Add |
Threats*: | Management systems/ management plan |
Other Threats: | Extremely poor state of conservation of numerous derelict buildings endangering occupants |
States Parties: | Senegal |
Year: | 2014 |
Document Source: | WHC-14/38.COM/7B.Add |
Threats*: | Management systems/ management plan |
States Parties: | Senegal |
Year: | 2013 |
Document Source: | WHC-13/37.COM/7B |
Threats*: | Management systems/ management plan |
Other Threats: | Extremely poor state of conservation of numerous derelict buildings endangering occupants |
States Parties: | Senegal |
Year: | 2011 |
Document Source: | WHC-11/35.COM/7B |
Threats*: | Management systems/ management plan |
Other Threats: | Extremely poor state of conservation of numerous derelict buildings endangering occupants |
States Parties: | Senegal |
Year: | 2010 |
Document Source: | WHC-10/34.COM/7B |
Threats*: | Management systems/ management plan |
Other Threats: | f) Extremely poor state of conservation of numerous derelict buildings endangering occupants; |
States Parties: | Senegal |
Year: | 2009 |
Document Source: | WHC-09/33.COM/7B.Add |
Threats*: | Management systems/ management plan |
Other Threats: | Extremely poor state of conservation of numerous derelict buildings endangering occupants; |
States Parties: | Senegal |
Year: | 2008 |
Document Source: | WHC-08/32.COM/7B |
Threats*: | Management systems/ management plan |
Other Threats: | Extremely poor state of conservation of numerous derelict buildings endangering occupants |
States Parties: | Senegal |
Year: | 2006 |
Document Source: | WHC-06/30.COM/7B.Add |
Threats*: | Management systems/ management plan |
Other Threats: | a) Hazardous condition of the buildingsb) Integrity of the propert |
States Parties: | Senegal |
Year: | 2005 |
Document Source: | WHC-05/29.COM/7B.Rev |
Threats*: | Management systems/ management plan |
Other Threats: | Buildings threatened with collapse |
States Parties: | India |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Paraguay |
Year: | 2003 |
Document Source: | WHC.03/27.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Argentina Brazil |
Year: | 2004 |
Document Source: | WHC-04/28.COM/15B |
Threats*: | Management systems/ management plan |
Other Threats: | Lack of capacity in Conservation of stone techniques |
States Parties: | Argentina Brazil |
Year: | 2003 |
Document Source: | WHC.03/27.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Argentina Brazil |
Year: | 1999 |
Document Source: | WHC-99/CONF.204/5,WHC-99/CONF.209/14 |
Threats*: | Management systems/ management plan |
Other Threats: | Aggressive natural environment |
States Parties: | Argentina Brazil |
Year: | 1993 |
Document Source: | WHC-93/CONF.002/14 |
Threats*: | Management systems/ management plan |
Other Threats: | Aggressive natural environment |
States Parties: | El Salvador |
Year: | 2003 |
Document Source: | WHC.03/27.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | El Salvador |
Year: | 1999 |
Document Source: | WHC-99/CONF.204/5 |
Threats*: | Management systems/ management plan |
States Parties: | El Salvador |
Year: | 1998 |
Document Source: | WHC-98/CONF.203/8Rev. |
Threats*: | Management systems/ management plan |
States Parties: | El Salvador |
Year: | 1997 |
Document Source: | WHC-97/CONF.208/4B,WHC-97/CONF.208/8B |
Threats*: | Management systems/ management plan |
States Parties: | India |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | India |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Algeria |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Algeria |
Year: | 2021 |
Document Source: | WHC/21/44.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Algeria |
Year: | 2019 |
Document Source: | WHC/19/43.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Algeria |
Year: | 2017 |
Document Source: | WHC/17/41.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Algeria |
Year: | 2015 |
Document Source: | WHC-15/39.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Algeria |
Year: | 2013 |
Document Source: | WHC-13/37.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Algeria |
Year: | 2011 |
Document Source: | WHC-11/35.COM/7B.Add |
Threats*: | Management systems/ management plan |
States Parties: | Algeria |
Year: | 2009 |
Document Source: | WHC-09/33.COM/7B |
Threats*: | Management systems/ management plan |
Other Threats: | b) Lack of maintenance of dwelling places; |
States Parties: | Algeria |
Year: | 2007 |
Document Source: | WHC-07/31.COM/7B |
Threats*: | Management systems/ management plan |
Other Threats: | Poor upkeep of the dwelling places |
States Parties: | Algeria |
Year: | 2005 |
Document Source: | WHC-05/29.COM/7B.Rev |
Threats*: | Management systems/ management plan |
Other Threats: | a) Lack of maintenance of housing; b) Collapse of houses (three dead and others injured in May 2002) |
States Parties: | Algeria |
Year: | 2004 |
Document Source: | WHC-04/28.COM/15B |
Threats*: | Management systems/ management plan |
Other Threats: | a) Natural erosion, b) Dilapidation, c) Lack of maintenance |
States Parties: | Algeria |
Year: | 2003 |
Document Source: | WHC.03/27.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Algeria |
Year: | 2001 |
Document Source: | WHC-01/CONF.208/10 |
Threats*: | Management systems/ management plan |
States Parties: | Algeria |
Year: | 1996 |
Document Source: | WHC-96/CONF.201/7B |
Threats*: | Management systems/ management plan |
States Parties: | Algeria |
Year: | 1995 |
Document Source: | WHC-95/CONF.203/5,WHC-95/CONF.203/5 Add.1 |
Threats*: | Management systems/ management plan |
States Parties: | Algeria |
Year: | 1994 |
Document Source: | WHC.94/CONF.003/16 |
Threats*: | Management systems/ management plan |
States Parties: | Algeria |
Year: | 1993 |
Document Source: | WHC-93/CONF.002/14 |
Threats*: | Management systems/ management plan |
States Parties: | Nepal |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Nepal |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Nepal |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B.Add |
Threats*: | Management systems/ management plan |
States Parties: | Nepal |
Year: | 2019 |
Document Source: | WHC/19/43.COM/7B,WHC/19/43.COM/INF.7.Rev.4 |
Threats*: | Management systems/ management plan |
States Parties: | Nepal |
Year: | 2018 |
Document Source: | WHC/18/42.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Nepal |
Year: | 2017 |
Document Source: | WHC/17/41.COM/7B.Add2,WHC/17/41.COM/INF.7 Rev |
Threats*: | Management systems/ management plan |
States Parties: | Nepal |
Year: | 2016 |
Document Source: | WHC/16/40.COM/7B.Add |
Threats*: | Management systems/ management plan |
States Parties: | Nepal |
Year: | 2015 |
Document Source: | WHC-15/39.COM/7B.Add,WHC-15/39.COM/INF.7,WHC-15/39.COM/INF.7Rev |
Threats*: | Management systems/ management plan |
States Parties: | Nepal |
Year: | 2013 |
Document Source: | WHC-13/37.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Nepal |
Year: | 2012 |
Document Source: | WHC-12/36.COM/7B.Add |
Threats*: | Management systems/ management plan |
States Parties: | Nepal |
Year: | 2011 |
Document Source: | WHC-11/35.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Nepal |
Year: | 2008 |
Document Source: | WHC-08/32.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Nepal |
Year: | 2007 |
Document Source: | WHC-07/31.COM/7A.Add |
Threats*: | Management systems/ management plan |
Danger List: | Yes |
States Parties: | Nepal |
Year: | 2006 |
Document Source: | WHC-06/30.COM/7A |
Threats*: | Management systems/ management plan |
Other Threats: | loss of traditional urban fabric |
Danger List: | Yes |
States Parties: | Nepal |
Year: | 2005 |
Document Source: | WHC-05/29.COM/7A |
Threats*: | Management systems/ management plan |
Danger List: | Yes |
States Parties: | Nepal |
Year: | 2004 |
Document Source: | WHC-04/28.COM/15A.Rev |
Threats*: | Management systems/ management plan |
Other Threats: | Fire |
Danger List: | Yes |
States Parties: | Nepal |
Year: | 2003 |
Document Source: | WHC.03/27.COM/7B,WHC.03/27.COM/INF.7C |
Threats*: | Management systems/ management plan |
Other Threats: | Need for restoration/consolidation works |
States Parties: | Nepal |
Year: | 2001 |
Document Source: | WHC-01/CONF.208/10 |
Threats*: | Management systems/ management plan |
Other Threats: | Need for restoration/consolidation works |
States Parties: | Nepal |
Year: | 2000 |
Document Source: | WHC-2000/CONF.202/5,WHC-2000/CONF.203/INF.4,WHC-2000/CONF.204/10,WHC-2000/CONF.204/INF.21,WHC-2000/CONF.204/INF.22 |
Threats*: | Management systems/ management plan |
Other Threats: | Need for restoration/consolidation works |
States Parties
Afghanistan Albania Algeria Andorra Argentina Austria Azerbaijan Bahrain Bangladesh Barbados Belarus Belgium Benin Bolivia (Plurinational State of) Bosnia and Herzegovina Brazil Bulgaria Cambodia Canada Chile China Colombia Costa Rica Côte d'Ivoire Croatia Cuba Czechia Democratic People's Republic of Korea Dominican Republic Ecuador Egypt El Salvador Eritrea Estonia Ethiopia Fiji France Georgia Germany Ghana Guatemala Haiti Honduras Hungary India Indonesia Iran (Islamic Republic of) Iraq Ireland Italy Japan Jordan Kazakhstan Kenya Kyrgyzstan Lao People's Democratic Republic Lebanon Libya Lithuania Madagascar Malaysia Mali Malta Mauritania Mauritius Mexico Micronesia (Federated States of) Mongolia Montenegro Morocco Mozambique Myanmar Nepal Netherlands (Kingdom of the) Niger Norway Oman Pakistan Panama Paraguay Peru Philippines Poland Portugal Republic of Korea Romania Russian Federation Saudi Arabia Senegal Serbia South Africa Spain Sri Lanka State of Palestine Sudan Suriname Switzerland Syrian Arab Republic Thailand Togo Tunisia Türkiye Turkmenistan Uganda Ukraine United Kingdom of Great Britain and Northern Ireland United Republic of Tanzania Uruguay Uzbekistan Venezuela (Bolivarian Republic of) Viet Nam Yemen Zimbabwe
* :
The threats indicated are listed in alphabetical order; their order does not constitute a classification according to the importance of their impact on the property.
Furthermore, they are presented irrespective of the type of threat faced by the property, i.e. with specific and proven imminent danger (“ascertained danger”) or with threats which could have deleterious effects on the property’s Outstanding Universal Value (“potential danger”).
** : All mission reports are not always available electronically.