State of Conservation
411
Reports
200
Properties concerned
88
States Parties with SOC reports
Property Category:Culturalclose
Date Start:
2021close
States Parties: | Mauritius |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B.Add |
Threats*: | Commercial development Ground transport infrastructure Management systems/ management plan |
States Parties: | Mauritius |
Year: | 2021 |
Document Source: | WHC/21/44.COM/7B |
Threats*: | Commercial development Ground transport infrastructure Management systems/ management plan |
States Parties: | Egypt |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7A |
Threats*: | Housing Management activities Management systems/ management plan Water (rain/water table) |
Other Threats: | Lack of engagement with local communities and other stakeholders |
Danger List: | Yes |
States Parties: | Egypt |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7A |
Threats*: | Housing Management activities Management systems/ management plan Water (rain/water table) |
Other Threats: | Encroachments within the property and inappropriate recent constructions; Lack of engagement with local communities and other stakeholders |
Danger List: | Yes |
States Parties: | Egypt |
Year: | 2021 |
Document Source: | WHC/21/44.COM/7A |
Threats*: | Housing Management activities Management systems/ management plan Water (rain/water table) |
Other Threats: | Encroachments within the property and inappropriate recent constructions; Lack of engagement with local communities and other stakeholders |
Danger List: | Yes |
States Parties: | Ethiopia |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7B.Add.2 |
Threats*: | Civil unrest Housing Interpretative and visitation facilities Management systems/ management plan Water (rain/water table) |
Other Threats: | Structural instability of Stele 3 and Mausoleum Urban encroachment and inappropriate new developments |
States Parties: | Ethiopia |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7A.Add.2 |
Threats*: | Civil unrest Housing Interpretative and visitation facilities Management systems/ management plan Water (rain/water table) |
Other Threats: | Structural instability of Stele 3 Impact of the recent conflict on cultural heritage in the Tigray region |
States Parties: | Ethiopia |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B |
Threats*: | Housing Interpretative and visitation facilities Management systems/ management plan Water (rain/water table) |
Other Threats: | Structural instability of Stele 3 |
States Parties: | China |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B.Add.2 |
Threats*: | Impacts of tourism / visitor / recreation Management activities Management systems/ management plan |
Other Threats: | Lack of clarity regarding components and buffer zone of the property |
States Parties: | China |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B.Add |
Threats*: | Impacts of tourism / visitor / recreation Management activities Management systems/ management plan |
States Parties: | Syrian Arab Republic |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7A |
Threats*: | Changes in traditional ways of life and knowledge system Earthquake Housing Legal framework Management systems/ management plan War |
Danger List: | Yes |
States Parties: | Syrian Arab Republic |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7A.Add |
Threats*: | Changes in traditional ways of life and knowledge system Housing Legal framework Management systems/ management plan War |
Danger List: | Yes |
States Parties: | Syrian Arab Republic |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7A.Add |
Threats*: | Changes in traditional ways of life and knowledge system Housing Legal framework Management systems/ management plan War |
Danger List: | Yes |
States Parties: | Syrian Arab Republic |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7A |
Threats*: | Housing Illegal activities War |
Danger List: | Yes |
States Parties: | Syrian Arab Republic |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7A.Add |
Threats*: | Housing Illegal activities War |
Danger List: | Yes |
States Parties: | Syrian Arab Republic |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7A |
Threats*: | Housing Illegal activities War |
Danger List: | Yes |
States Parties: | Syrian Arab Republic |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7A |
Threats*: | Changes in traditional ways of life and knowledge system Housing Management activities Management systems/ management plan Society's valuing of heritage War |
Other Threats: | fire |
Danger List: | Yes |
States Parties: | Syrian Arab Republic |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7A.Add |
Threats*: | Changes in traditional ways of life and knowledge system Housing Management activities Management systems/ management plan Society's valuing of heritage War |
Other Threats: | fire |
Danger List: | Yes |
States Parties: | Syrian Arab Republic |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7A |
Threats*: | Changes in traditional ways of life and knowledge system Housing Management activities Management systems/ management plan Society's valuing of heritage War |
Other Threats: | fire |
Danger List: | Yes |
States Parties: | Bulgaria |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B.Add.2 |
Threats*: | Housing Impacts of tourism / visitor / recreation Management systems/ management plan Marine transport infrastructure |
States Parties: | Bulgaria |
Year: | 2021 |
Document Source: | WHC/21/44.COM/7B |
Threats*: | Housing Impacts of tourism / visitor / recreation Management systems/ management plan Marine transport infrastructure |
States Parties: | Egypt |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B |
Threats*: | Changes in traditional ways of life and knowledge system Deliberate destruction of heritage Flooding Housing Human resources Impacts of tourism / visitor / recreation Management activities Management systems/ management plan Water (rain/water table) |
Other Threats: | Natural decay and structural problems Major infrastructure and development projects Uncontrolled urban development |
States Parties: | Egypt |
Year: | 2021 |
Document Source: | WHC/21/44.COM/7B.Add |
Threats*: | Changes in traditional ways of life and knowledge system Deliberate destruction of heritage Flooding Housing Human resources Impacts of tourism / visitor / recreation Management activities Management systems/ management plan Water (rain/water table) |
Other Threats: | Natural decay and structural problems Major infrastructure and development projects Uncontrolled urban development |
States Parties: | Syrian Arab Republic |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7A |
Threats*: | Deliberate destruction of heritage Earthquake Financial resources Housing Human resources Illegal activities Land conversion Legal framework Management systems/ management plan Military training Quarrying War |
Danger List: | Yes |
States Parties: | Syrian Arab Republic |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7A.Add |
Threats*: | Deliberate destruction of heritage Financial resources Housing Human resources Illegal activities Land conversion Legal framework Management systems/ management plan Military training Quarrying War |
Danger List: | Yes |
States Parties: | Syrian Arab Republic |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7A |
Threats*: | Financial resources Housing Human resources Identity, social cohesion, changes in local population and community Illegal activities Land conversion Legal framework Management systems/ management plan Quarrying War |
Danger List: | Yes |
States Parties: | Cambodia |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7B.Add |
Threats*: | Housing Management systems/ management plan |
States Parties: | Cambodia |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B.Add.2 |
Threats*: | Housing Management systems/ management plan |
States Parties: | Cambodia |
Year: | 2021 |
Document Source: | WHC/21/44.COM/7B.Add |
Threats*: | Housing Management systems/ management plan |
Other Threats: | • Uncontrolled urban expansion; • Lack of clarity regarding property rights and building codes; • Poor law enforcement; |
States Parties: | Türkiye |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B.Add |
Threats*: | Management systems/ management plan |
States Parties: | Türkiye |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | Italy |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7B |
Threats*: | Housing Impacts of tourism / visitor / recreation Management systems/ management plan |
States Parties: | Italy |
Year: | 2021 |
Document Source: | WHC/21/44.COM/7B |
Threats*: | Financial resources Housing Human resources Impacts of tourism / visitor / recreation Management systems/ management plan Solid waste Water (rain/water table) |
Other Threats: | New buffer zone necessary |
States Parties: | Pakistan |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7B.Add.2 |
Threats*: | Flooding Management systems/ management plan |
Other Threats: | deterioration of structures |
States Parties: | Pakistan |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B |
Threats*: | Management systems/ management plan |
Other Threats: | deterioration of structures |
States Parties: | Tunisia |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B |
Threats*: | Housing Legal framework Management systems/ management plan |
States Parties: | Tunisia |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B |
Threats*: | Housing Legal framework Management systems/ management plan |
States Parties: | Libya |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7A |
Threats*: | Crop production Deliberate destruction of heritage Fire (widlfires) Governance Housing Interpretative and visitation facilities Livestock farming / grazing of domesticated animals Management activities Management systems/ management plan Surface water pollution War |
Danger List: | Yes |
States Parties: | Libya |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7A.Add |
Threats*: | Crop production Deliberate destruction of heritage Fire (widlfires) Governance Housing Interpretative and visitation facilities Livestock farming / grazing of domesticated animals Management activities Management systems/ management plan Surface water pollution War |
Danger List: | Yes |
States Parties: | Libya |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7A |
Threats*: | Crop production Deliberate destruction of heritage Fire (widlfires) Governance Housing Interpretative and visitation facilities Livestock farming / grazing of domesticated animals Management activities Management systems/ management plan Surface water pollution War |
Danger List: | Yes |
States Parties: | Libya |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7A |
Threats*: | Desertification Illegal activities Localised utilities Relative humidity War |
Other Threats: | Deterioration of the stone masonry; Sand covering certain areas of the property; Graffiti and fires; Alarming state of conservation of the Hunting Baths; Tidal flooding and continuous sea encroachment on the circus area |
Danger List: | Yes |
States Parties: | Libya |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7A.Add |
Threats*: | Desertification Illegal activities War |
Other Threats: | Deterioration of the stone masonry; Sand covering certain areas of the property; Graffiti and fires |
Danger List: | Yes |
States Parties: | Libya |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7A |
Threats*: | Desertification Illegal activities War |
Other Threats: | Deterioration of the stone masonry; Sand covering certain areas of the property; Graffiti and fires |
Danger List: | Yes |
States Parties: | India |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B |
Threats*: | Impacts of tourism / visitor / recreation Management systems/ management plan |
Other Threats: | Lack of appropriate documentation to establish the authenticity of the property |
States Parties: | Panama |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B |
Threats*: | Financial resources Ground transport infrastructure Housing Human resources Identity, social cohesion, changes in local population and community Legal framework |
Other Threats: | Severe deterioration of historic buildings ; Demolition of urban ensembles and buildings |
States Parties: | Panama |
Year: | 2021 |
Document Source: | WHC/21/44.COM/7B |
Threats*: | Financial resources Ground transport infrastructure Housing Human resources Identity, social cohesion, changes in local population and community Legal framework |
Other Threats: | Severe deterioration of historic buildings ; Demolition of urban ensembles and buildings |
States Parties: | Libya |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7A |
Threats*: | Housing Invasive/alien terrestrial species Land conversion Management systems/ management plan Relative humidity War |
Other Threats: | Excessive vegetation growth; Impact of humidity and seawater salt on stone masonry |
Danger List: | Yes |
States Parties: | Libya |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7A |
Threats*: | Housing Invasive/alien terrestrial species Land conversion Relative humidity War |
Other Threats: | Excessive vegetation growth; Impact of humidity and seawater salt on stone masonry |
Danger List: | Yes |
States Parties: | Libya |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7A |
Threats*: | Housing Invasive/alien terrestrial species Land conversion Relative humidity War |
Other Threats: | Excessive vegetation growth; Impact of humidity and seawater salt on stone masonry |
Danger List: | Yes |
States Parties: | Sudan |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7B |
Threats*: | Desertification Erosion and siltation/ deposition Flooding Impacts of tourism / visitor / recreation Land conversion Management systems/ management plan Mining |
States Parties: | Türkiye |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7B.Add |
Threats*: | Management systems/ management plan |
Other Threats: | Design of the proposed new roof shelter |
States Parties: | Türkiye |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B.Add |
Threats*: | Management systems/ management plan |
Other Threats: | Design of the proposed new roof shelter |
States Parties: | Iraq |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7A |
Threats*: | Deliberate destruction of heritage Flooding Management activities Management systems/ management plan War Water infrastructure |
Other Threats: | Fragile mud brick structures |
Danger List: | Yes |
States Parties: | Iraq |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7A |
Threats*: | Deliberate destruction of heritage Flooding Management activities Management systems/ management plan War Water infrastructure |
Other Threats: | Fragile mud brick structures |
Danger List: | Yes |
States Parties: | Iraq |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7A.Add |
Threats*: | Deliberate destruction of heritage Flooding Management activities Management systems/ management plan War Water infrastructure |
Other Threats: | Fragile mud brick structures |
Danger List: | Yes |
States Parties: | Eritrea |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B |
Threats*: | Financial resources Human resources Management systems/ management plan |
States Parties: | Eritrea |
Year: | 2021 |
Document Source: | WHC/21/44.COM/7B.Add |
Threats*: | Financial resources Human resources Management systems/ management plan |
States Parties: | Poland |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B |
Threats*: | Ground transport infrastructure Management systems/ management plan |
Other Threats: | Slow process of consultation with local communities |
States Parties: | Poland |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B.Add |
Threats*: | Ground transport infrastructure Management systems/ management plan |
Other Threats: | Slow process of consultation with local communities |
States Parties: | Iraq |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B |
Threats*: | Interpretative and visitation facilities Management systems/ management plan |
States Parties: | Iraq |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B |
Threats*: | Interpretative and visitation facilities Management systems/ management plan |
States Parties: | Myanmar |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7B.Add.3 |
Threats*: | Housing Major visitor accommodation and associated infrastructure |
Other Threats: |
|
States Parties: | Jordan |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B.Add.2 |
Threats*: | Management systems/ management plan |
Other Threats: | Buildings and Development (lack of design and construction guidelines) Preservation of important vistas and sightlines of the property |
States Parties: | Jordan |
Year: | 2021 |
Document Source: | WHC/21/44.COM/7B.Add |
Threats*: | Management systems/ management plan |
Other Threats: | Buildings and Development (lack of design and construction guidelines) Preservation of important vistas and sightlines of the property |
States Parties: | Philippines |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B.Add |
Threats*: | Ground transport infrastructure |
States Parties: | Philippines |
Year: | 2021 |
Document Source: | WHC/21/44.COM/7B |
Threats*: | Ground transport infrastructure |
States Parties: | State of Palestine |
Year: | 2021 |
Document Source: | WHC/21/44.COM/7B.Add.2 |
Threats*: | Housing Impacts of tourism / visitor / recreation Management activities Water (rain/water table) |
Other Threats: | Degradation of the architectural complex of the Church of the Nativity |
States Parties: | Indonesia |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B.Add |
Threats*: | Impacts of tourism / visitor / recreation |
States Parties: | Indonesia |
Year: | 2021 |
Document Source: | WHC/21/44.COM/7B |
States Parties: | Brazil |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B |
Threats*: | Housing Management systems/ management plan |
States Parties: | Brazil |
Year: | 2021 |
Document Source: | WHC/21/44.COM/7B |
Threats*: | Housing Management systems/ management plan |
States Parties: | Hungary |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7B |
Threats*: | Deliberate destruction of heritage Effects arising from use of transportation infrastructure Housing Identity, social cohesion, changes in local population and community Legal framework Management systems/ management plan |
Other Threats: | Lack of conservation of residential housing in the area inscribed as World Heritage; Inappropriate use of public areas and street amenities |
States Parties: | Hungary |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7B.Add |
Threats*: | Deliberate destruction of heritage Effects arising from use of transportation infrastructure Housing Identity, social cohesion, changes in local population and community Legal framework Management systems/ management plan |
Other Threats: | Lack of conservation of residential housing in the area inscribed as World Heritage |
States Parties: | Hungary |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B.Add |
Threats*: | Deliberate destruction of heritage Effects arising from use of transportation infrastructure Housing Identity, social cohesion, changes in local population and community Legal framework Management systems/ management plan |
Other Threats: | Lack of conservation of residential housing in the area inscribed as World Heritage |
States Parties: | Albania |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7B |
Threats*: | Housing Illegal activities Impacts of tourism / visitor / recreation Management systems/ management plan |
States Parties: | Lebanon |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B |
Threats*: | Erosion and siltation/ deposition Housing Management systems/ management plan |
States Parties: | Lebanon |
Year: | 2021 |
Document Source: | WHC/21/44.COM/7B |
Threats*: | Erosion and siltation/ deposition Housing Management systems/ management plan |
States Parties: | Poland |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7B |
Threats*: | Ground transport infrastructure Housing Management activities |
Other Threats: | Lack of overall development plan for the property and its buffer zone |
States Parties: | Poland |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B.Add.2 |
Threats*: | Ground transport infrastructure Management activities |
Other Threats: | impact on the Outstanding Universal Value of the property of the rebuilt Pavilion |
States Parties: | Viet Nam |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7B.Add.3 |
States Parties: | Peru |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7A |
Threats*: | Identity, social cohesion, changes in local population and community Illegal activities Management systems/ management plan Water (rain/water table) |
Other Threats: | Continuous deterioration of earthen architecture structures and decorated surfaces from lack of conservation and maintenance practices |
Danger List: | Yes |
States Parties: | Peru |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7A.Add |
Threats*: | Identity, social cohesion, changes in local population and community Illegal activities Management systems/ management plan Water (rain/water table) |
Other Threats: | Continuous deterioration of earthen architecture structures and decorated surfaces from lack of conservation and maintenance practices |
Danger List: | Yes |
States Parties: | Peru |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7A |
Threats*: | Identity, social cohesion, changes in local population and community Illegal activities Management systems/ management plan Water (rain/water table) |
Other Threats: | Continuous deterioration of earthen architecture structures and decorated surfaces from lack of conservation and maintenance practices |
Danger List: | Yes |
States Parties: | Chile |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7B |
Threats*: | Commercial development Effects arising from use of transportation infrastructure Legal framework Management activities Management systems/ management plan |
Other Threats: | Insufficient delimitation of boundaries |
States Parties: | Chile |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B |
Threats*: | Commercial development Effects arising from use of transportation infrastructure Legal framework Management activities Management systems/ management plan |
Other Threats: | Insufficient delimitation of boundaries |
States Parties: | Chile |
Year: | 2021 |
Document Source: | WHC/21/44.COM/7B |
Threats*: | Commercial development Effects arising from use of transportation infrastructure Legal framework Management activities Management systems/ management plan |
Other Threats: | Insufficient delimitation of boundaries |
States Parties: | Bolivia (Plurinational State of) |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7A |
Threats*: | Legal framework Mining Surface water pollution |
Other Threats: | Instability and risk of collapse of the Cerro Rico; Deficiencies in conservation; Environmental impacts on the hydraulic complex |
Danger List: | Yes |
States Parties: | Bolivia (Plurinational State of) |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7A.Add |
Threats*: | Legal framework Mining Surface water pollution |
Other Threats: | Instability and risk of collapse of the Cerro Rico; Deficiencies in conservation; Environmental impacts on the hydraulic complex |
Danger List: | Yes |
States Parties: | Bolivia (Plurinational State of) |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7A |
Threats*: | Legal framework Mining Surface water pollution |
Other Threats: | Instability and risk of collapse of the Cerro Rico; Deficiencies in conservation; Environmental impacts on the hydraulic complex |
Danger List: | Yes |
States Parties: | Ecuador |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B |
Threats*: | Housing Management systems/ management plan Underground transport infrastructure |
States Parties: | Ecuador |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B |
Threats*: | Housing Management systems/ management plan Underground transport infrastructure |
States Parties: | Malta |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B.Add.2 |
Threats*: | Commercial development Housing Identity, social cohesion, changes in local population and community Impacts of tourism / visitor / recreation Major visitor accommodation and associated infrastructure Management systems/ management plan |
States Parties: | Dominican Republic |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B |
Threats*: | Earthquake Housing Impacts of tourism / visitor / recreation Interpretative and visitation facilities Land conversion Legal framework Management systems/ management plan Society's valuing of heritage Storms Underground transport infrastructure |
States Parties: | Dominican Republic |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B |
Threats*: | Earthquake Housing Impacts of tourism / visitor / recreation Interpretative and visitation facilities Land conversion Legal framework Management systems/ management plan Society's valuing of heritage Storms Underground transport infrastructure |
States Parties: | United Kingdom of Great Britain and Northern Ireland |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B.Add |
Threats*: | Commercial development Management systems/ management plan Mining Society's valuing of heritage |
States Parties: | United Kingdom of Great Britain and Northern Ireland |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B |
Threats*: | Commercial development Management systems/ management plan Mining Society's valuing of heritage |
States Parties: | Venezuela (Bolivarian Republic of) |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7A |
Threats*: | Flooding Management systems/ management plan Water (rain/water table) |
Other Threats: | Serious deterioration of materials and structure |
Danger List: | Yes |
States Parties: | Venezuela (Bolivarian Republic of) |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7A.Add |
Threats*: | Flooding Management systems/ management plan Water (rain/water table) |
Other Threats: | Serious deterioration of materials and structure |
Danger List: | Yes |
States Parties: | Venezuela (Bolivarian Republic of) |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7A |
Threats*: | Flooding Management systems/ management plan Water (rain/water table) |
Other Threats: | Serious deterioration of materials and structure |
Danger List: | Yes |
States Parties: | Syrian Arab Republic |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7A |
Threats*: | Earthquake Housing Management activities Management systems/ management plan Quarrying War |
Danger List: | Yes |
States Parties: | Syrian Arab Republic |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7A.Add |
Threats*: | Housing Impacts of tourism / visitor / recreation Management activities Management systems/ management plan Quarrying War |
Danger List: | Yes |
States Parties: | Syrian Arab Republic |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7A |
Threats*: | Housing Impacts of tourism / visitor / recreation Management activities Management systems/ management plan Quarrying War |
Danger List: | Yes |
States Parties: | Russian Federation |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B.Add |
Threats*: | Air transport infrastructure Interpretative and visitation facilities Legal framework Management systems/ management plan |
Other Threats: | Poor state of conservation of the monastic irrigation system |
States Parties: | Russian Federation |
Year: | 2021 |
Document Source: | WHC/21/44.COM/7B |
Threats*: | Air transport infrastructure Interpretative and visitation facilities Legal framework Management systems/ management plan |
Other Threats: | Poor state of conservation of the monastic irrigation system |
States Parties: | Afghanistan |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7A.Add |
Threats*: | Commercial development Ground transport infrastructure Housing |
Other Threats: | Risk of collapse of the Giant Buddha niches; Irreversible deterioration of the mural paintings |
Danger List: | Yes |
States Parties: | Afghanistan |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7A.Add.3 |
Threats*: | Commercial development Ground transport infrastructure Housing |
Other Threats: | Risk of collapse of the Giant Buddha niches; Irreversible deterioration of the mural paintings |
Danger List: | Yes |
States Parties: | Afghanistan |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7A |
Threats*: | Commercial development Ground transport infrastructure Housing |
Other Threats: | Risk of collapse of the Giant Buddha niches; Irreversible deterioration of the mural paintings |
Danger List: | Yes |
States Parties: | Indonesia |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B |
Threats*: | Changes in traditional ways of life and knowledge system Governance Housing Identity, social cohesion, changes in local population and community Land conversion Management systems/ management plan Society's valuing of heritage |
States Parties: | Indonesia |
Year: | 2021 |
Document Source: | WHC/21/44.COM/7B |
Threats*: | Changes in traditional ways of life and knowledge system Governance Housing Identity, social cohesion, changes in local population and community Land conversion Management systems/ management plan Society's valuing of heritage |
States Parties: | United Kingdom of Great Britain and Northern Ireland |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7B.Add.3 |
Threats*: | Housing Localised utilities Management systems/ management plan |
Other Threats: | Poor state of conservation of the large Belper Mills complex |
States Parties: | United Kingdom of Great Britain and Northern Ireland |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7B |
States Parties: | Türkiye |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7B.Add.2 |
Threats*: | Ground transport infrastructure Housing Impacts of tourism / visitor / recreation Land conversion Management systems/ management plan Water infrastructure |
Other Threats: | Rehabilitation and reconstruction works and development, urban design and landscape projects |
States Parties: | Türkiye |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7B.Add.2 |
Threats*: | Civil unrest Ground transport infrastructure Housing Impacts of tourism / visitor / recreation Management systems/ management plan Water infrastructure |
States Parties: | Türkiye |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B.Add |
Threats*: | Civil unrest Ground transport infrastructure Housing Impacts of tourism / visitor / recreation Management systems/ management plan Water infrastructure |
States Parties: | Netherlands (Kingdom of the) |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B.Add.2 |
Threats*: | Ground transport infrastructure Housing Management systems/ management plan |
States Parties: | Iraq |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B |
Threats*: | Legal framework |
Other Threats: | Slopes of the archaeological mound non stabilized |
States Parties: | Austria Hungary |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7B |
Threats*: | Housing Major visitor accommodation and associated infrastructure Other climate change impacts Renewable energy facilities |
States Parties: | Austria Hungary |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7B.Add |
Threats*: | Housing Major visitor accommodation and associated infrastructure |
States Parties: | Pakistan |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7B |
Threats*: | Financial resources Ground transport infrastructure Housing Legal framework Management systems/ management plan Underground transport infrastructure |
States Parties: | Pakistan |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B |
Threats*: | Financial resources Ground transport infrastructure Housing Legal framework Management systems/ management plan Underground transport infrastructure |
States Parties: | Panama |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7A |
Threats*: | Erosion and siltation/ deposition Housing Impacts of tourism / visitor / recreation Land conversion Legal framework Management systems/ management plan |
Other Threats: | Lack of established boundaries and buffer zones |
Danger List: | Yes |
States Parties: | Panama |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7A |
Threats*: | Erosion and siltation/ deposition Housing Impacts of tourism / visitor / recreation Land conversion Legal framework Management systems/ management plan |
Other Threats: | Lack of established boundaries and buffer zones |
Danger List: | Yes |
States Parties: | Panama |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7A |
Threats*: | Erosion and siltation/ deposition Housing Impacts of tourism / visitor / recreation Land conversion Legal framework Management systems/ management plan |
Other Threats: | Lack of established boundaries and buffer zones |
Danger List: | Yes |
States Parties: | Ghana |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7B |
Threats*: | Changes to oceanic waters Commercial development Financial resources Ground transport infrastructure Ground water pollution Illegal activities Interpretative and visitation facilities Legal framework Major visitor accommodation and associated infrastructure Management systems/ management plan Solid waste Water (rain/water table) Wind |
Other Threats: | Salt-laden atmosphere |
States Parties: | Ghana |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B |
Threats*: | Changes to oceanic waters Commercial development Financial resources Ground transport infrastructure Ground water pollution Illegal activities Interpretative and visitation facilities Legal framework Major visitor accommodation and associated infrastructure Management systems/ management plan Solid waste Water (rain/water table) Wind |
Other Threats: | Salt-laden atmosphere |
States Parties: | Ghana |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B |
Threats*: | Changes to oceanic waters Commercial development Financial resources Ground transport infrastructure Ground water pollution Illegal activities Interpretative and visitation facilities Legal framework Major visitor accommodation and associated infrastructure Management systems/ management plan Solid waste Water (rain/water table) Wind |
Other Threats: | Salt-laden atmosphere |
States Parties: | South Africa |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B |
Threats*: | Ground water pollution Interpretative and visitation facilities Management systems/ management plan Mining Other climate change impacts Surface water pollution Water (rain/water table) |
Other Threats: | Acid mine drainage |
States Parties: | South Africa |
Year: | 2021 |
Document Source: | WHC/21/44.COM/7B |
Threats*: | Ground water pollution Interpretative and visitation facilities Management systems/ management plan Mining Other climate change impacts Surface water pollution Water (rain/water table) |
Other Threats: | Acid mine drainage |
States Parties: | Austria Germany Slovakia |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7B |
Threats*: | Flooding Governance Renewable energy facilities |
States Parties: | Sudan |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7B |
Threats*: | Civil unrest Desertification Erosion and siltation/ deposition Flooding Ground transport infrastructure Housing Land conversion Major visitor accommodation and associated infrastructure Management systems/ management plan Wind |
States Parties: | Sudan |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7B.Add |
Threats*: | Desertification Flooding Ground transport infrastructure Housing Land conversion Major visitor accommodation and associated infrastructure Management systems/ management plan Wind |
States Parties: | Sudan |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B |
Threats*: | Desertification Flooding Ground transport infrastructure Housing Land conversion Major visitor accommodation and associated infrastructure Management systems/ management plan Wind |
States Parties: | Georgia |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7B.Add.2 |
Threats*: | Interpretative and visitation facilities Water (rain/water table) |
Other Threats: | General need for interior and exterior conservation work on the monuments |
States Parties: | Georgia |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B |
Threats*: | Interpretative and visitation facilities Water (rain/water table) |
Other Threats: | General need for interior and exterior conservation work on the monuments |
States Parties: | Türkiye |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B.Add |
Threats*: | Ground transport infrastructure Housing Management systems/ management plan Quarrying |
States Parties: | Türkiye |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B |
Threats*: | Ground transport infrastructure Housing Management systems/ management plan Quarrying |
States Parties: | Mongolia |
Year: | 2021 |
Document Source: | WHC/21/44.COM/7B |
Threats*: | Management systems/ management plan |
States Parties: | India |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B.Add |
Threats*: | Commercial development Effects arising from use of transportation infrastructure Ground transport infrastructure Housing Water (extraction) |
States Parties: | Japan |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7B |
Other Threats: | Fire |
States Parties: | Japan |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B |
Other Threats: | Fire |
States Parties: | Japan |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B |
Other Threats: | Fire |
States Parties: | Iraq |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7A |
Threats*: | Deliberate destruction of heritage Illegal activities War |
Other Threats: | Major looting of Iraqi archaeological sites |
Danger List: | Yes |
States Parties: | Iraq |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7A.Add.2 |
Threats*: | Deliberate destruction of heritage Illegal activities War |
Other Threats: | Major looting of Iraqi archaeological sites |
Danger List: | Yes |
States Parties: | Iraq |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7A |
Threats*: | Deliberate destruction of heritage Illegal activities War |
Other Threats: | Major looting of Iraqi archaeological sites |
Danger List: | Yes |
States Parties: | State of Palestine |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7A.Add.4 |
Threats*: | Management systems/ management plan |
Other Threats: | Absence of Statement of Outstanding Universal Value at the time of inscription; Restricted access |
Danger List: | Yes |
States Parties: | State of Palestine |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7A.Add.4 |
Threats*: | Management systems/ management plan |
Other Threats: | Absence of Statement of Outstanding Universal Value at the time of inscription |
Danger List: | Yes |
States Parties: | State of Palestine |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7A.Add.2 |
Threats*: | Management systems/ management plan |
Other Threats: | Absence of Statement of Outstanding Universal Value at the time of inscription |
Danger List: | Yes |
States Parties: | India |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B.Add |
Threats*: | Effects arising from use of transportation infrastructure Housing Illegal activities Impacts of tourism / visitor / recreation Industrial areas Management activities Management systems/ management plan Mining |
Other Threats: | Vulnerabilities of certain individual structures within the forts requiring short-term conservation actions |
States Parties: | India |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B |
Threats*: | Effects arising from use of transportation infrastructure Housing Illegal activities Impacts of tourism / visitor / recreation Industrial areas Management activities Management systems/ management plan Mining |
Other Threats: | Vulnerabilities of certain individual structures within the forts requiring short-term conservation actions |
States Parties: | Saudi Arabia |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B |
Threats*: | Major visitor accommodation and associated infrastructure Management activities |
States Parties: | Türkiye |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7B.Add.4 |
Threats*: | Commercial development Ground transport infrastructure Low impact research / monitoring activities Management systems/ management plan Underground transport infrastructure |
Other Threats: | Decay and loss of Ottoman/vernacular architecture; Impact of change of status of the Hagia Sophia and the Chora Museum |
States Parties: | Türkiye |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B.Add |
Threats*: | Commercial development Ground transport infrastructure Management activities Management systems/ management plan Underground transport infrastructure |
Other Threats: | decay and loss of Ottoman/vernacular architecture |
States Parties: | Türkiye |
Year: |
2021
Initialy proposed for examination in 2020
|
Threats*: | Commercial development Ground transport infrastructure Management activities Management systems/ management plan Underground transport infrastructure |
Other Threats: | decay and loss of Ottoman/vernacular architecture |
States Parties: | Egypt |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7B |
Threats*: | Housing Identity, social cohesion, changes in local population and community Management systems/ management plan Water (rain/water table) |
Other Threats: | Dilapidated infrastructure; Neglect and lack of maintenance |
States Parties: | Egypt |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7B.Add |
Threats*: | Housing Identity, social cohesion, changes in local population and community Management systems/ management plan Water (rain/water table) |
Other Threats: | Dilapidated infrastructure; Neglect and lack of maintenance |
States Parties: | Egypt |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B.Add |
Threats*: | Housing Identity, social cohesion, changes in local population and community Management systems/ management plan Water (rain/water table) |
Other Threats: | Dilapidated infrastructure; Neglect and lack of maintenance |
States Parties: | Uzbekistan |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B |
Threats*: | Ground transport infrastructure High impact research / monitoring activities Housing Management activities Management systems/ management plan |
Other Threats: | degradation of traditional houses |
States Parties: | Uzbekistan |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B |
Threats*: | Ground transport infrastructure High impact research / monitoring activities Housing Management activities Management systems/ management plan |
Other Threats: | degradation of traditional houses |
States Parties: | Czechia |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B |
States Parties: | Peru |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B.Add |
Threats*: | Ground transport infrastructure Housing Management activities Management systems/ management plan |
States Parties: | Peru |
Year: | 2021 |
Document Source: | WHC/21/44.COM/7B |
Threats*: | Ground transport infrastructure Housing Management activities Management systems/ management plan |
States Parties: | China |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B |
Threats*: | Housing Land conversion Management systems/ management plan |
States Parties: | China |
Year: | 2021 |
Document Source: | WHC/21/44.COM/7B |
Threats*: | Housing Land conversion Management systems/ management plan |
States Parties: | Czechia |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B |
Threats*: | Housing Management systems/ management plan |
States Parties: | Czechia |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B |
Threats*: | Housing Management systems/ management plan |
States Parties: | Uzbekistan |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7A.Add |
Threats*: | Financial resources Housing Human resources Legal framework Management activities Management systems/ management plan |
Other Threats: | Demolition and re-building of traditional housing areas |
Danger List: | Yes |
States Parties: | Uzbekistan |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7A |
Threats*: | Financial resources Housing Human resources Legal framework Management activities Management systems/ management plan |
Other Threats: | Demolition and re-building of traditional housing areas |
Danger List: | Yes |
States Parties: | Uzbekistan |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7A.Add |
Threats*: | Financial resources Housing Human resources Legal framework Management activities Management systems/ management plan |
Other Threats: | Demolition and re-building of traditional housing areas |
Danger List: | Yes |
States Parties: | Azerbaijan |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B.Add.2 |
Threats*: | Legal framework Management systems/ management plan |
States Parties: | Azerbaijan |
Year: | 2021 |
Document Source: | WHC/21/44.COM/7B |
Threats*: | Legal framework Management systems/ management plan |
States Parties: | Austria |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B.Add.2 |
Threats*: | Housing Legal framework Management systems/ management plan |
States Parties: | Austria |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B |
Threats*: | Housing Legal framework Management systems/ management plan |
States Parties: | Austria |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7A.1,WHC/24/46.COM/7A.Add.3 |
Threats*: | Housing Legal framework Major visitor accommodation and associated infrastructure |
Other Threats: | Desirability of conservation of historic roof constructions within the property |
Danger List: | Yes |
States Parties: | Austria |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7A.Add |
Threats*: | Housing Legal framework Major visitor accommodation and associated infrastructure |
Other Threats: | Desirability of conservation of historic roof constructions within the property |
Danger List: | Yes |
States Parties: | Austria |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7A.Add |
Threats*: | Housing Legal framework Major visitor accommodation and associated infrastructure |
Other Threats: | Desirability of conservation of historic roof constructions within the property |
Danger List: | Yes |
States Parties: | Albania |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7B |
Threats*: | Governance Ground transport infrastructure High impact research / monitoring activities Housing Illegal activities Management activities Management systems/ management plan |
Other Threats: | Lack of adequate fire fighting arrangements in the historic urban zone |
States Parties: | Albania |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7B.Add.2 |
Threats*: | Governance Ground transport infrastructure High impact research / monitoring activities Housing Illegal activities Management activities Management systems/ management plan |
Other Threats: | Lack of adequate fire fighting arrangements in the historic urban zone |
States Parties: | Albania |
Year: | 2021 |
Document Source: | WHC/21/44.COM/7B |
Threats*: | Governance Ground transport infrastructure High impact research / monitoring activities Housing Illegal activities Management activities Management systems/ management plan |
Other Threats: | Lack of adequate fire fighting arrangements in the historic urban zone |
States Parties: | India |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B.Add |
Threats*: | Commercial development Housing Human resources Low impact research / monitoring activities Management systems/ management plan |
States Parties: | India |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B |
Threats*: | Commercial development Housing Human resources Low impact research / monitoring activities Management systems/ management plan |
States Parties: | China |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B |
Threats*: | Commercial development Deliberate destruction of heritage Ground transport infrastructure Housing Major visitor accommodation and associated infrastructure Management systems/ management plan |
States Parties: | China |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B.Add |
Threats*: | Commercial development Deliberate destruction of heritage Ground transport infrastructure Housing Major visitor accommodation and associated infrastructure Management systems/ management plan |
States Parties: | Suriname |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B |
Threats*: | Legal framework Management systems/ management plan |
States Parties: | Suriname |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B |
Threats*: | Legal framework Management systems/ management plan |
States Parties: | Saudi Arabia |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B |
Threats*: | Housing Management systems/ management plan |
Other Threats: | High rate of decay of the historic houses |
States Parties: | Saudi Arabia |
Year: | 2021 |
Document Source: | WHC/21/44.COM/7B |
Threats*: | Housing Management systems/ management plan |
Other Threats: | High rate of decay of the historic houses |
States Parties: | Chile |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B |
Threats*: | Commercial development Housing Interpretative and visitation facilities Legal framework Management systems/ management plan Marine transport infrastructure |
States Parties: | Chile |
Year: | 2021 |
Document Source: | WHC/21/44.COM/7B |
Threats*: | Commercial development Housing Interpretative and visitation facilities Legal framework Management systems/ management plan Marine transport infrastructure |
States Parties: | Côte d'Ivoire |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B.Add |
Threats*: | Financial resources Housing Human resources Legal framework Management systems/ management plan |
States Parties: | Côte d'Ivoire |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B |
Threats*: | Financial resources Housing Human resources Legal framework Management systems/ management plan |
States Parties: | Yemen |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7A.Add |
Threats*: | Deliberate destruction of heritage Financial resources Housing Human resources Land conversion Management systems/ management plan War |
Other Threats: | Serious degradation of the city’s heritage (many houses and the ancient souq are in an alarming state of deterioration) |
Danger List: | Yes |
States Parties: | Yemen |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7A.Add |
Threats*: | Deliberate destruction of heritage Financial resources Housing Human resources Land conversion Management systems/ management plan |
Danger List: | Yes |
States Parties: | Yemen |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7A.Add |
Threats*: | Deliberate destruction of heritage Financial resources Housing Human resources Land conversion Management systems/ management plan |
Danger List: | Yes |
States Parties: | Peru |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B |
Threats*: | Deliberate destruction of heritage Ground transport infrastructure Housing Management systems/ management plan |
States Parties: | Peru |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B |
Threats*: | Deliberate destruction of heritage Ground transport infrastructure Housing Management systems/ management plan |
States Parties: | Pakistan |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7B |
Threats*: | Deliberate destruction of heritage Earthquake Erosion and siltation/ deposition Flooding Housing Illegal activities Land conversion Management activities Management systems/ management plan Other climate change impacts Solid waste |
Other Threats: | Stability of the foundations (earth mechanics) of the Jam Nizamuddin tomb |
States Parties: | Pakistan |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B.Add |
Threats*: | Deliberate destruction of heritage Earthquake Erosion and siltation/ deposition Flooding Housing Illegal activities Land conversion Management activities Management systems/ management plan Other climate change impacts Solid waste |
Other Threats: | Stability of the foundations (earth mechanics) of the Jam Nizamuddin tomb |
States Parties: | Pakistan |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B |
Threats*: | Deliberate destruction of heritage Earthquake Erosion and siltation/ deposition Housing Illegal activities Land conversion Management activities Management systems/ management plan Other climate change impacts Solid waste |
Other Threats: | Stability of the foundations (earth mechanics) of the Jam Nizamuddin tomb |
States Parties: | Georgia |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B.Add.2 |
Threats*: | Erosion and siltation/ deposition Land conversion Management activities Management systems/ management plan |
States Parties: | Georgia |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B.Add |
Threats*: | Erosion and siltation/ deposition Land conversion Management activities Management systems/ management plan |
States Parties
Afghanistan Albania Algeria Argentina Austria Azerbaijan Bahrain Belgium Benin Bolivia (Plurinational State of) Brazil Bulgaria Cambodia Chile China Colombia Costa Rica Côte d'Ivoire Croatia Czechia Dominican Republic Ecuador Egypt Eritrea Ethiopia France Georgia Germany Ghana Haiti Hungary India Indonesia Iran (Islamic Republic of) Iraq Italy Japan Jordan Kazakhstan Kenya Kyrgyzstan Lao People's Democratic Republic Lebanon Libya Mali Malta Mauritius Micronesia (Federated States of) Mongolia Montenegro Morocco Mozambique Myanmar Nepal Netherlands (Kingdom of the) Nigeria Pakistan Panama Peru Philippines Poland Portugal Republic of Korea Romania Russian Federation Saudi Arabia Senegal Serbia Slovakia South Africa Spain Sri Lanka State of Palestine Sudan Suriname Switzerland Syrian Arab Republic Togo Tunisia Türkiye Uganda Ukraine United Kingdom of Great Britain and Northern Ireland United Republic of Tanzania Uzbekistan Venezuela (Bolivarian Republic of) Viet Nam YemenThreats
Management systems/ management plan 320 Housing 214 Legal framework 89 Ground transport infrastructure 81 Impacts of tourism / visitor / recreation 79 Management activities 79 War 59 Land conversion 52 Illegal activities 51 Major visitor accommodation and associated infrastructure 49 Human resources 46 Interpretative and visitation facilities 45 Water (rain/water table) 43 Commercial development 42 Deliberate destruction of heritage 41 Financial resources 40 Erosion and siltation/ deposition 32 Governance 32 Identity, social cohesion, changes in local population and community 27 Effects arising from use of transportation infrastructure 25 Flooding 23 Changes in traditional ways of life and knowledge system 22 Civil unrest 22 Underground transport infrastructure 20 Marine transport infrastructure 19 Water infrastructure 19 Solid waste 17 Society's valuing of heritage 16 Earthquake 16 Mining 13 Surface water pollution 12 Other climate change impacts 12 Air transport infrastructure 11 Quarrying 11 Desertification 11 Relative humidity 9 High impact research / monitoring activities 9 Industrial areas 8 Wind 7 Fire (widlfires) 7 Localised utilities 6 Major linear utilities 6 Invasive/alien terrestrial species 6 Ground water pollution 5 Crop production 5 Livestock farming / grazing of domesticated animals 5 Ritual / spiritual / religious and associative uses 5 Low impact research / monitoring activities 5 Non-renewable energy facilities 4 Renewable energy facilities 4 Air pollution 3 Forestry /wood production 3 Changes to oceanic waters 3 Input of excess energy 2 Pests 2 Military training 2 Storms 2 Water (extraction) 1
* :
The threats indicated are listed in alphabetical order; their order does not constitute a classification according to the importance of their impact on the property.
Furthermore, they are presented irrespective of the type of threat faced by the property, i.e. with specific and proven imminent danger (“ascertained danger”) or with threats which could have deleterious effects on the property’s Outstanding Universal Value (“potential danger”).
** : All mission reports are not always available electronically.