Faites une recherche à travers les informations du Centre du patrimoine mondial.

Administration
Assistance internationale
Budget
Communauté
Communication
Conservation
Convention du patrimoine mondial
Credibilité de la Liste du ...
Inscriptions sur la Liste du ...
Liste du patrimoine mondial en péril
Listes indicatives
Mécanisme de suivi renforcé
Méthodes et outils de travail
Orientations
Partenariats
Rapport périodique
Rapports
Renforcement des capacités
Valeur universelle exceptionnelle








4 Décisions
0 Résolutions
Session : 04BUR 1980close
Par année
[Uniquement en anglais] 10.  Bureau authorised the Secretariat to pursue, in co-operation with the Ethiopian authorities, the preparation of a project for a photogrammetric survey of the monuments of Lalibela and to submit a revised technical co-operation request to the Committee. The delegate from the United States of America abstained from this recommendation.
[Uniquement en anglais] 9. The Bureau deferred the following requests either because the properties to which they related were not included or recommended for the World Heritage List or further clarifications were required: Algeria: Dey's Palace Qal'ah of Beni Hammad Citadel Quarter of Setif Ethiopia: Bale Mountain National Park Abijatta Shalla Lakes National Park Further elements of the technical co-opertaion requests for these sites have to be established first by a preparatory assistance mission which has been granted for Simien National Park and will be now extended to ...
[Uniquement en anglais] 11. The Bureau granted preparatory assistance to (a) Guatemala: services of 2 consultants (at an estimated cost of $22,000) (ecologist and specialist in stone, stucco and wood conservation) to prepare a technical co-operation request for Tikal National Park. The request for a jeep included in the preparatory assistance requested could be considered together with the technical co-operation request.
[Uniquement en anglais] 11. The Bureau granted preparatory assistance to: (b) Senegal: consultant services for 4m/m (at an estimated cost of $20,000) to plan technical measures for adequate protection of the site including regulation of the water level. The equipment requested requires some clarification and could be considered by the Committee at a later date.
top