Search
Take advantage of the search to browse through the World Heritage Convention information.
19962 Results
Search
Highlights Holiday Inn Swindon 17 till 20th july close
Time
7.178s
Categories
Activities 105
Committee 43
Documents 12909
Events 754
FAQ 16
News 1378
Pages 29
Partners 9
Publications 53
State of Conservation 3434
States Parties 6
Tentative Lists 1074
World Heritage Properties 152
19664.
United States of America,a) Quantity and quality of water entering the property;
b) Urban encroachment;
c) Agricultural fertiliser pollution;
d) Mercury contamination of fish and wildlife;
e) Lowered water levels due to flood control measures;
f) Damage from hurricanes. ,On 5 March 2010 a report was submitted by the State Party on the state of conservation of the ...
19665.
Peru,a) Delays in reviewing the Master Plan and developing detailed yearly operational plans, and inadequate budgetary support;
b) No evaluation of transport options, related geological studies, or the impact of bus traffic on increasing the risk of landslides;
c) Lack of impact studies related to the carrying capacity of the Citadel and Inca Trail;
d) Delays in the ...
19666.
Kamabulon ou Case Sacrée de Kangaba : 11° 56’ 31’’ N 8° 24’ 37’’ W
Site de KurukanFuga : 11° 56° 998’’ N 8° 24’ 420’’ W
L’Arche de Kamandjan : 12° 23’ 111’’ N 8° 21’ 598’’ W
Kamablon ou Case Sacrée de Kéniéro : 12° 22’ 934’’ N 8° 31’ 269’’ W
Le bien dénommé « Sites historiques et paysages culturels du Manden » est un bien en série composé du Kamabulon, de la Case ...
19667.
Le bien dont on propose l’inscription dans la liste indicative du patrimoine mondial est le plus grand centre de production de salaisons de poisson de l’Empire Romain, connu comme Ruines Romaines de Tróia, un vaste ensemble de vestiges romains, implantés dans la péninsule de Tróia, qui ont été classifiés comme Monument National en 1910 (décret du 16 Juin). Un nouveau ...
19668.
The site has for centuries been a crossroads of the routes leading from the interior of the continent to the Mediterranean. The entire complex with the fortress, town ramparts and towers lies on the southern slope of a large rocky pyramid, enclosed to the south-west by the bed of the river Pliva and to the southeast and east by the river Vrbas. The perimeter of the ...
19669.
United Republic of Tanzania,a) Deterioration of the architectural heritage fabric;
b) Lack of approved statement of outstanding universal value;
c) Lack of using the management plan as the main vehicle for managing the property;
d) Lack of approved boundaries for the property and its buffer zone linked to the land-use plans and appropriate protection;
e) Need to extend the ...
19670.
Yemen,a) Serious degradation of the city’s heritage (many houses and the ancient souq are in an alarming deterioration state);
b) Large percentage of the city's houses replaced by inappropriate concrete buildings;
c) Large sections of the city’s open spaces have been privatized, either illegally or informally and more than 30% of these built-up;
d) Lack of conservation ...
19671.
Peru,a) Continuous deterioration of earthen architecture structures and decorated surfaces from lack of conservation and maintenance practices;
b) Illegal occupation of the property;
c) Unregulated farming activities;
d) Rising water table levels;
e) Delay in implementing protective measures (legislation and regulations already passed by the National Authorities).,The ...
19672.
Indonesia,
Management systems/management plan
Ground transport infrastructure (Road construction)
Land conversion (Agricultural encroachment)
Illegal activities (Illegal logging; Poaching)
Governance (Institutional and governance weaknesses)
Renewable energy facilities (Geothermal development license adjacent to the property)
,On 31 January 2022, the State Party submitted ...
19673.
Iraq,
Legal Framework
Need to conduct further studies regarding minimum water flows, to confirm the biodiversity within the property and its surrounding landscapes
Incomplete designation of all the components of the property as legally protected areas
Need to regulate oil and gas concessions, and other potentially impacting activities in the buffer zones of the ...
19674.
The four Nabatean towns of Haluza, Mamshit, Avdat and Shivta, along with associated fortresses and agricultural landscapes in the Negev Desert, are spread along routes linking them to the Mediterranean end of the incense and spice route. Together they reflect the hugely profitable trade in frankincense and myrrh from south Arabia to the Mediterranean, which flourished from ...
19675.
WHC-13/19.GA/11
19676.
Créé le 12 décembre 1933 par l'ordonnance du Ruanda-Urundi n°83/bis/Agri, le parc national de la Kibira était établi comme une réserve forestière de la Crête Congo-Nil. Comme pour toutes les aires protégées, le parc national de la Kibira a été institutionnalisé par le décret-loi n°1/6 du 03 mars 1980. Il s'étend de Bugarama au sud jusqu'à la frontière avec le ...
19677.
The National Theater of Guatemala is located in the Miguel Ángel Asturias Cultural Center, named in honor of the Guatemalan writer winner of the 1967 Nobel Prize in Literature. This cultural complex is located on the top of the San José Buena Vista Hill and provides spaces to carry out cultural activities, ranging from the fine arts to the performing arts. All this in ...
19678.
Algeria,a) Natural erosion
b) Lack of maintenance of dwelling places
c) Loss of traditional conservation techniques
d) Uncontrolled land use
e) Non-operational safeguarding plan
f) Lack of coordination of activities ,On 25 February 2011, the State Party submitted a report on the implementation of Decision 33 COM 7B.52 concerning the conservation status of the Kasbah ...
19679.
Lebanon,
Need for an international safeguarding campaign (issue resolved)
Construction of a tourist complex (land fill) (issue resolved)
Construction project of a large fish market (issue resolved)
Construction project of a coastal motorway (issue resolved)
Uncontrolled construction (issue resolved)
Project to build a new tourist marina (issue resolved)
Road construction ...
19680.
Italy,,At the invitation of the Italian authorities, a joint World Heritage Centre/ICOMOS advisory mission was carried out from 9 to 13 December 2008. The mission team had meetings with stakeholders, reviewed existing documents, several projects and plans and visited a number of selected sites in the Historic Centre of Naples.
The mission concluded that the values for ...
19681.
Ethiopia,a) No boundaries for the property nor for the buffer zone ;
b) Impact of the four recently constructed temporary shelters ;
c) Absence of a management plan for the property;
d) Insufficient urban and architectural regulations;
e) Urban development around the property;
f) Impact of rainwater and humidity ;
g) Impact of earthquakes ;
h) Geological ...
19682.
Serbia,a) Lack of legal status of the property;
b) Lack of legislative protection of buffer zones;
c) Lack of implementation of the management plan and of active management;
d) Difficulties to monitor the property due to political instability, post-conflict situation (visits under the Kosovo Stabilisation Force / United Nations Interim Administration Mission in Kosovo ...
19683.
Senegal,a) Lack of implementation of the Action Plan, including the Safeguarding and Enhancement Plan (SEP), and establishment of a heritage bureau;
b) The lack of a management and conservation plan;
c) New construction and Architectural modification and urban projects affecting authenticity and integrity;
d) Inappropriate housing restoration;
e) Environmental disorder ...
19684.
Austria,a) Urban development pressure, high-rise projects with alteration of the visual integrity of the property
b) Train station project outside the buffer zone with potential visual impacts on the property,At the time of the drafting of this document, the State Party had not transmitted a report on the state of conservation of the World Heritage property. A letter was ...
19685.
Peru,a) Agricultural encroachment;
b) Cattle ranching;
c) Deforestation/ Illegal logging;
d) Hydrocarbon concesssions. ,The State Party submitted its report with maps on 30 April 2008 (in Spanish). The report argues that pressures within the park are minor, as are those emanating from human activities located near the south western and south eastern park ...
19686.
Côte d'Ivoire,a) Poaching
b) Agricultural encroachment
c) Mining for gold,In June 2006, UNESCO and IUCN conducted a mission to the property, in conjunction with the mission to Comoé National Park. The mission found that the recent national political crisis had not impacted the site as seriously as it had affected Comoé National Park. The number of park ...
19687.
Morocco,a) Near total abandonment of the property;
b) Gully erosion;
c) Rock falls due to erosion;
d) Increased offences in old Ksar and degradation;
e) Delays in the establishment of a technical and administrative structure responsible for the site;
f) Lack of a management plan for the property;
g) Uncontrolled tourism and visitor pressure.,As requested by the ...
19688.
Ukraine,a) New constructions within the historic centre;
b) Lack of valid detailed planning documents;
c) Inadequate infrastructure including the sewage system.,The state of conservation report submitted by the State Party on 12 March 2007 provides the following information:
a) The boundaries of the historical area of centre of L’viv, which define the buffer zone ...
19689.
Mexico,a) Pressure from Urban Development;
b) Natural disasters (seismic instability and continued sinking of the city caused by the depletion of the aquifer);
c) Water and environmental pollution. ,On 1 February 2007, the World Heritage Centre received the state of conservation report on the property of Xochimilco through the Permanent Delegation of Mexico to ...
19690.
United States of America,
Urban Pressure
Agriculture Pressure
,In a letter dated 30 January 2004, the State Party provided an update on the situation of Everglades National Park and requested that the property be retained on the List of World Heritage in Danger.
IUCN noted that the report provides an update on specific accomplishments to address previously identified ...
19691.
Colombia,
Armed conflict
Illegal extraction of natural resources
Threats from major infrastructure projects
Lack of control of management agency
,An IUCN Reactive Monitoring mission visited the property in January 2015. Subsequently, the State Party submitted a State of conservation report on 9 February 2015. Both reports are available at ...
19692.
India,
Lack of an operational site management plan (issue resolved)
Lack of traffic regulations limiting heavy duty vehicular traffic
Construction project for two cable-suspended bridges in the property
Demolition works in the Hampi bazaar near Virupaksha temple
,On 16 February 2015, the State Party submitted a state of conservation report, which is available at ...
19693.
Austria,
Urban development pressure, high-rise projects
Hydroelectric power station Salzburg-Lehen
Train station project outside the buffer zone
Integrated approach towards management
,On 10 February 2015, the State Party submitted a state of conservation report, which is available at https://whc.unesco.org/en/list/784/documents and addresses the recommendations of the ...
19694.
Chile,
Interventions planned at the port, such as the Barón Port and the Prat Dock, as well as for touristic facilities and real estate projects
Fragmentation of competencies and mandates by sectors and by different levels of government, as well as by the different types of specific protection and use of different areas, does not allow for the management of the property ...
19695.
Honduras,
The foreseen construction of an airport in the vicinity of the World Heritage property in a national protected area
Deterioration of construction materials due to natural decay phenomena
Risk of structural failure of archaeological complexes resulting from tunnels excavated for archaeological purposes
Deterioration derived from uncontrolled visitation and ...
19696.
Peru,
Fires in 1998 and 2001 (issue resolved)
Formalization of the procedures to set up a Management Coordination Unit to implement the Strategic Plan
Revision of the Master and Strategic Plans
New development projects within the Historic Centre including urban transportation systems (Corredor Segregado) and interventions in historical buildings
Development of the cable ...
19697.
Benin,
Absence of a national legislative mechanism for the protection of cultural heritage (issue resolved)
Major deterioration of almost 50% of the earthen structural components (issue resolved)
Lack of presentation and interpretation at the site (issue resolved)
Lack and loss of documentation on the site (issue resolved)
Lack of sharing of knowledge between site managers ...
19698.
Suriname,
Legal framework
Management systems
,On 6 January 2016, the State Party submitted a state of conservation report, available at https://whc.unesco.org/en/list/940/documents/ and which addresses the following issues:
Progress on the implementation of the 2014 Emergency Plan that consisted of short-term measures regarding the management, conservation, public ...
19699.
Ethiopia,
Insufficient delimitation of this serial property
Lack of conservation and management plans
Lack of appropriate urban planning and building regulations
Urban encroachment and inappropriate new developments
Rising water level / seepage
Structural instability of Stele III
Housing
Interpretative and visitation facilities
,On 28 January 2016, the State Party ...
19700.
China,Threats identified at the time of inscription of the property:
Need to revise the system of buffer zones and to consider the definition of priority visibility corridors in order to protect them from the potential impact of new constructions
Finalize the creation of the Monitoring and Archive Centre and improve the historical and archaeological knowledge of the ...
19701.
Pakistan,
Demolition of two of the tanks and partial demolition of a third tank of the hydraulic works of the Shalamar Gardens (issue resolved)
Encroachments and urban pressure
Inadequate management mechanisms (including incomplete legislation, lack of financial resources)
Lack of definition of boundaries of the Lahore Fort and Shalamar Gardens
,On 1 April 2016, the State ...
19702.
Botswana,Factors identified at the time of inscription of the property:
Lack of wildlife monitoring programme
Animal sanitation and diseases
Mining
Management and governance
Engagement of local communities and indigenous peoples
Alien invasive species
,On 25 November 2015, the State Party submitted a state of conservation report, which is available at ...
19703.
Bulgaria,
Developments in the Bansko ski zone
Lack of effective management mechanisms
Boundary issues
Illegal logging
,On 12 December 2015, the State Party submitted a report on the state of conservation of the property which is available at https://whc.unesco.org/en/list/225/documents/.
The State Party confirms that the draft Management Plan for Pirin National Park ...
19704.
Oman,
Use of inappropriate conservation techniques
Urban pressure
Lack of a management plan and appropriate legislation
Housing
Legal framework
Management activities
Management systems/ management plan
Deterioration of the earthen structures of the Fort
,On 31 December 2017, the State Party submitted a report on the state of conservation of the property, available at ...
19705.
Libya,
Flooding (issue resolved)
Conflict situation
,On 30 January 2018, the State Party submitted a state of conservation report, which is available at http://whc.unesco.org/en/list/183/documents/. Progress in a number of conservation issues addressed by the Committee at its previous sessions is presented in this report, as follows:
The Department of Antiquities (DOA) ...
19706.
Libya,
Conflict situation prevailing in the country
,On 30 January 2018, the State Party submitted a state of conservation report, which is available at http://whc.unesco.org/en/list/362/documents/. Progress in a number of conservation issues addressed by the Committee at its previous sessions is presented in this report, as follows:
The Department of Antiquities (DOA) ...
19707.
Democratic Republic of the Congo,
Intensive poaching of large mammals, in particular elephants
Mining activities inside the property
Uncontrolled migration into the villages located within the property
Illegal timber exploitation in the Ituri Forest, which might affect the property in the near future
Planned rehabilitation of the National Road RN4 crossing the property, ...
19708.
State of Palestine,
Potential construction of a separation fence (wall)
Abandonment of terraces and afforestation
Impact of socio-cultural and geo-political transformations
Changes in traditional ways of life and knowledge system
Identity, social cohesion, changes in local population and community
Invasive/alien terrestrial species
New constructions within the property’s ...
19709.
Bolivia (Plurinational State of),
Management systems/management plan
Mining (Potential degradation of the historic site by continued and uncontrolled mining operations in the Cerro Rico Mountain)
Surface water pollution
Instability and risk of collapse of the Cerro Rico
Deficiencies in conservation: special attention required for the restoration and upgrading of structures ...
19710.
Mexico,
Illegal activities - Illegal logging
Land conversion - Agricultural encroachment
Forest fires (issue resolved)
Decline in the overwintering population of Monarch butterflies in the property
Impacts of tourism / visitor / recreation (tourism pressures associated with growth in visitor numbers and heavy concentration in specific areas)
Major visitor accommodation ...
19711.
Lebanon,
Absence of legislative framework and comprehensive management plan
Absence of coordination mechanisms
Illegal constructions and urban encroachments
Degradation of the mural paintings and buildings
Uncontrolled tourist development and absence of visitor management
Lack of resources for the management structure
,On 23 January 2019, the State Party submitted a state ...
19712.
Japan,
Management Systems/Management Plan (Lack of vision and management system for operating the property as an entity and cultural landscape) (issues resolved)
Need to delineate pilgrim routes on the lower slopes of the mountain
Need to develop visitor management strategy
Need for overall conservation approach for the upper access routes and their associated huts and ...
19713.
Türkiye,
Concern over the situation prevailing in Diyarbakir (issue resolved)
Rehabilitation and reconstruction works and development
Ground transport infrastructure (roads)
Water infrastructure
Impacts of tourism/visitor/recreation
Management system/Management and Conservation Plan modified
Land Conversion
,On 1 February 2020, the State Party submitted a state of ...
19714.
United Kingdom of Great Britain and Northern Ireland,
Resumption of mining activities
Inappropriate developments (note that the previously raised issue of the new supermarket built at Hayle Harbour has since been resolved)
Potential impact of new development projects
Management and institutional factors / Improvements to the planning tools and approval processes not yet ...
19715.
Poland,Factors identified at the time of inscription:
Lack of legal protection at the national level of all the structures above ground within the boundaries of the property
Change of ownership of the pumping station at Adolph Shaft whihc may alter in the medium- to long-term the quality and regularity of the extraction of the water necessary to conserve the underground ...
19716.
Portugal,Factors identified at the time of inscription:
Management and institutional factors (need to strengthen the research activities, management activities, the management system/management plan)
,On 31 January 2020, the State Party submitted a state of conservation report, which is available at http://whc.unesco.org/en/list/1573/documents/ and addresses ...