11. The Bureau granted preparatory assistance to:
(b) Senegal: consultant services for 4m/m (at an estimated cost of $20,000) to plan technical measures for adequate protection of the site including regulation of the water level. The equipment requested requires some clarification and could be considered by the Committee at a later date.