Policy Compendium
Article 11
5. "The Committee shall define the criteria on the basis of which a property belonging to the cultural or natural heritage may be included in either of the lists mentioned in paragraphs 2 and 4 of this article."
Theme: | 2.2.2.1 - General |
Source: | Convention Concerning the Protection of the World Cultural and Natural Heritage |
Paragraph 166
“Where a State Party wishes to have the property inscribed under additional, fewer or different criteria other than those used for the original inscription, it shall submit this request as if it were a new nomination (including the requirement to be previously included on the Tentative List – see paragraph 63 and 65). This re-nomination must be received by 1 February and will be evaluated in the full year and a half cycle of evaluation according to the procedures and timetable outlined in paragraph 168. Properties recommended will only be evaluated under the new criteria and will remain on the World Heritage List even if unsuccessful in having additional criteria recognized.”Theme: | 2.2.2.1 - General |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Code: | 1660 |
Theme: | 2.2.2.1 - General |
Decision: | 3 COM XI.35 |
19. "(...)
(a) Because of the educational and public information purposes of the World Heritage List, the criteria for the inclusion of properties in the List have been elaborated with a view to enabling the Committee to act with full independence in evaluating the intrinsic merit of a property without regard to any other consideration (including the need for technical co-operation support).
(f) The criteria for the inclusion of cultural properties in the World Heritage List should always be seen in relation to one another and should be considered in the context of the definitions set out in· Article 1 of the Convention."
Theme: | 2.2.2.1 - General |
Decision: | 4 COM VI.18-20 |
Paragraph 87
“All properties nominated for inscription on the World Heritage List shall satisfy the conditions of integrity.”Theme: | 2.2.4 - Integrity |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 88
“Integrity is a measure of the wholeness and intactness of the natural and/or cultural heritage and its attributes. Examining the conditions of integrity, therefore requires assessing the extent to which the property:
a) includes all elements necessary to express its Outstanding Universal Value;
b) is of adequate size to ensure the complete representation of the features and processes which convey the property’s significance;
c) suffers from adverse effects of development and/or neglect.
This should be presented in a statement of integrity.”
Theme: | 2.2.4 - Integrity |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 89
“For properties nominated under criteria (i) to (vi), the physical fabric of the property and/or its significant features should be in good condition, and the impact of deterioration processes controlled. A significant proportion of the elements necessary to convey the totality of the value conveyed by the property should be included. Relationships and dynamic functions present in cultural landscapes, historic towns or other living properties essential to their distinctive character should also be maintained.”Theme: | 2.2.4 - Integrity |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 90
“For all properties nominated under criteria (vii) - (x), bio-physical processes and landform features should be relatively intact. However, it is recognized that no area is totally pristine and that all natural areas are in a dynamic state, and to some extent involve contact with people. Biological diversity and cultural diversity can be closely linked and interdependent and human activities, including those of traditional societies, local communities and indigenous peoples, often occur in natural areas. These activities may be consistent with the Outstanding Universal Value of the area where they are ecologically sustainable.”
Theme: | 2.2.4 - Integrity |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Threats: | Changes in traditional ways of life and knowledge system Identity, social cohesion, changes in local population and community Impacts of tourism / visitor / recreation Indigenous hunting, gathering and collecting Ritual / spiritual / religious and associative uses Society's valuing of heritage |
Paragraph 91
“In addition, for properties nominated under criteria (vii) to (x), a corresponding condition of integrity has been defined for each criterion.”
Theme: | 2.2.4 - Integrity |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
The World Heritage Committee recommends providing a more detailed inventory of the attributes and elements of the property (based on Case law on decisions on Nominations).
Theme: | 2.2.4 - Integrity |
See for examples Decisions: | 32 COM 8B.28 33 COM 8B.32 34 COM 8B.20 34 COM 8B.11 |
15.c) "[The World Heritage Committee encourages States Parties to] (…) be proactive in relation to development and conservation of World Heritage properties by conducting a Strategic Environmental Assessment (SEA) at the time of nomination to anticipate the impact of any potential development on the Outstanding Universal Value."
Theme: | 2.2.5.5 - Impact assessment |
Decision: | 35 COM 12E |
Paragraph 165
“If a State Party wishes to significantly modify the boundary of a property already on the World Heritage List, the State Party shall submit this proposal as if it were a new nomination (including the requirement to be previously included on the Tentative List – see paragraph 63 and 65). This re-nomination shall be presented by 1 February and will be evaluated in the full year and a half cycle of evaluation according to the procedures and timetable outlined in paragraph 168. This provision applies to extensions, as well as reductions.”Theme: | 2.2.6.4 - Significant modifications to the boundaries |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 132
3. Justification for Inscription
“[For a nomination to be considered as “complete”, the following requirements (see format in Annex 5) are to be met:] (…) In section 3.2, a comparative analysis of the nominated property in relation to similar properties, whether or not on the World Heritage List, both at the national and international levels, shall be provided. The comparative analysis shall explain the importance of the nominated property in its national and international context."
Theme: | 2.6 - Comparative studies |
Source: | WHC.21/01 Operational Guidelines for the Implementation of the World Heritage Convention (WHC.21/01 2021) |
Theme: | 2.6 - Comparative studies |
Decision: | 3 COM XI.35 |
III. COMPARATIVE ANALYSES
7. "[The World Heritage Committee] decides that comparative analyses by States Parties as part of the nomination dossier shall be undertaken in relation to similar properties, whether or not on the World Heritage List, both at the national and international levels."
Theme: | 2.6 - Comparative studies |
Decision: | 7 EXT.COM 4A |
The World Heritage Committee recommends undertaking a deep comparative analysis in order to demonstrate the Outstanding Universal Value of the property by fully assessing the relative values of the nominated property against other sites (based on Case law on decisions on Nominations).
Theme: | 2.6 - Comparative studies |
See for examples Decisions: | 34 COM 8B.7 34 COM 8B.3 35 COM 8B.16 36 COM 8B.35 37 COM 8B.21 37 COM 8B.17 37 COM 8B.11 38 COM 8B.22 38 COM 8B.18 38 COM 8B.17 |
Synthesis based on relevant Committee decisions
The World Heritage Committee requests to ensure the management of a serial property as a unified whole, with an effective and explicit operational coordination between management plans existing for individual component parts of the site and the overall management plan for the property (based on case law on decisions on Nomination).
Theme: | 2.7.3 - Serial properties |
See for examples Decisions: | 40 COM 8B.16 43 COM 8B.38 44 COM 8B.25 44 COM 8B.15 |
Paragraph 137
“Serial properties will include two or more component parts related by clearly defined links:
a) Component parts should reflect cultural, social or functional links over time that provide, where relevant, landscape, ecological, evolutionary or habitat connectivity.
b) Each component part should contribute to the Outstanding Universal Value of the property as a whole in a substantial, scientific, readily defined and discernible way, and may include, inter alia, intangible attributes. The resulting Outstanding Universal Value should be easily understood and communicated.
c) Consistently, and in order to avoid an excessive fragmentation of component parts, the process of nomination of the property, including the selection of the component parts, should take fully into account the overall manageability and coherence of the property (see paragraph 114).
and provided it is the series as a whole – and not necessarily the individual parts of it – which are of Outstanding Universal Value.”
Theme: | 2.7.3 - Serial properties |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 138
“A serial nominated property may occur:
a) on the territory of a single State Party (serial national property); or
b) within the territory of different States Parties, which need not be contiguous and is nominated with the consent of all States Parties concerned (serial transnational property).”
Theme: | 2.7.3 - Serial properties |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 139
“Serial nominations, whether from one State Party or multiple States, may be submitted for evaluation over several nomination cycles, provided that the first property nominated is of Outstanding Universal Value in its own right. States Parties planning serial nominations phased over several nomination cycles are encouraged to inform the Committee of their intention in order to ensure better planning.”
Theme: | 2.7.3 - Serial properties |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
The World Heritage Policy Compendium was elaborated thanks to the generous contribution of the Government of Australia.
The World Heritage Policy Compendium On-line tool was developed thanks to the generous contribution of the Government of Korea.