Policy Compendium
Paragraph 106
“Where no buffer zone is proposed, the nomination should include a statement as to why a buffer zone is not required.”
Theme: | 2.2.6.2 - Buffer Zones |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 107
“Although buffer zones are not part of the nominated property, any modifications to or creation of buffer zones subsequent to inscription of a property on the World Heritage List should be approved by the World Heritage Committee using the procedure for a minor boundary modification (see paragraph 164 and Annex 11). The creation of buffer zones subsequent to inscription is normally considered to be a minor boundary modification.”
Theme: | 2.2.6.2 - Buffer Zones |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 163
“A minor modification is one which has not a significant impact on the extent of the property nor affects its Outstanding Universal Value.”
Theme: | 2.2.6.3 - Minor modifications to the boundaries |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 164
“If a State Party wishes to request a minor modification to the boundaries of a property already on the World Heritage List, it must be prepared in compliance with the format of Annex 11 and must be received by 1 February by the Committee through the Secretariat, which will seek the evaluation of the relevant Advisory Bodies on whether this can be considered a minor modification or not. The Secretariat shall then submit the Advisory Bodies’ evaluation to the World Heritage Committee. The Committee may approve such a modification, or it may consider that the modification to the boundary is sufficiently significant as to constitute a significant boundary modification of the property, in which case the procedure for new nominations will apply.”
Theme: | 2.2.6.3 - Minor modifications to the boundaries |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 165
“If a State Party wishes to significantly modify the boundary of a property already on the World Heritage List, the State Party shall submit this proposal as if it were a new nomination (including the requirement to be previously included on the Tentative List – see paragraph 63 and 65). This re-nomination shall be presented by 1 February and will be evaluated in the full year and a half cycle of evaluation according to the procedures and timetable outlined in paragraph 168. This provision applies to extensions, as well as reductions.”Theme: | 2.2.6.4 - Significant modifications to the boundaries |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 47
Theme: | 2.7.4.1 - General |
Source: | WHC.21/01 Operational Guidelines for the Implementation of the World Heritage Convention (WHC.21/01 2021) |
2.2.2.2 - Specific considerations related to criterion ...
2.2.3 - Authenticity
2.2.5.3 - Management systems
2.2.6.1 - Boundaries
2.2.6.2 - Buffer Zones
2.2.6.3 - Minor modifications to the boundaries
2.2.6.4 - Significant modifications to the boundaries
2.7.4.1 - General
The World Heritage Policy Compendium was elaborated thanks to the generous contribution of the Government of Australia.
The World Heritage Policy Compendium On-line tool was developed thanks to the generous contribution of the Government of Korea.