Take advantage of the search to browse through the World Heritage Centre information.

Administration
Budget
Capacity Building
Communication
Community
Conservation
Credibility of the World Heritage ...
Inscriptions on the World Heritage ...
International Assistance
List of World Heritage in Danger
Operational Guidelines
Outstanding Universal Value
Partnerships
Periodic Reporting
Reinforced Monitoring
Reports
Tentative Lists
Working methods and tools
World Heritage Convention








Decision 45 COM 7B.22
Wood Buffalo National Park (Canada) (N 256)

The World Heritage Committee,

  1. Having examined Document WHC/23/45.COM/7B.Add,
  2. Recalling Decisions 39 COM 7B.18, 41 COM 7B.2, 43 COM 7B.1 and 44 COM 7B.190 adopted at its 39th (Bonn, 2015), 41st (Krakow, 2017), 43rd (Baku, 2019) and extended 44th (Fuzhou/online, 2021) sessions respectively,
  3. Notes with concern the conclusion of the 2022 joint World Heritage Centre/IUCN Reactive Monitoring mission that the Outstanding Universal Value (OUV) of the property continues to face significant ascertained and potential threats, in particular as a result of changes in the hydrology of the Peace Athabasca Delta (PAD) exacerbated by the impacts of climate change and of the industrial developments around the property;
  4. Acknowledges that the State Party has developed and is implementing a structured Action Plan with the aim of reversing the current downward trends in some of the desired outcomes linked to the attributes of the OUV, and notes the conclusion of the 2022 mission that it is too early to assess how successful the Action Plan will be in restoring the OUV of the property, including the ecological integrity of the PAD;
  5. Welcomes the progress made in implementing parts of the Action Plan, including efforts to move towards co-management of the property with the indigenous rightsholders, the creation of additional protected areas to the south of the property, the measures taken to improve the conservation of the Roland Lake Bison herd, and the work on developing an Integrated Research and Monitoring Programme;
  6. Appreciates the ongoing work to develop a hydrologic model to understand the flows required to deliver environmental benefits to the PAD, but expresses concern that a functional modelling platform, which can inform decision-making, will not be available before 2024 and that, to date, no operational strategy or protocol for implementing potential water releases or control structures that might be proposed based on the outcomes of the hydrologic model has been agreed;
  7. Reiterates its utmost concern about the lack of progress in addressing the cumulative impacts of industrial developments around the property, the continued expansion of existing oil sands projects without full consideration of the potential impacts on the OUV of the property, the continued absence of an adequate risk assessment for large tailings ponds upstream of the property despite evidence of major risks, including seepage as well as proposals under consideration to allow the release of treated oil sands processed water (OSPW) into the Athabasca River;
  8. Requests the State Party to implement all recommendations of the 2022 mission to further strengthen the Action Plan and its implementation, including to:
    1. Strengthen efforts to transition to a genuine partnership with indigenous rightsholders in the governance and management of the property,
    2. Complete hydrodynamic modelling and environmental flows assessment,
    3. Ensure that no further dam projects on the Peace River are approved, including the proposed Amisk Project, until sufficient evaluation tools are in place to evaluate impacts on the hydrology of the PAD,
    4. Urgently establish a sound decision-making mechanism for ecological flow releases,
    5. Decide, before 2026, on a set of concrete mitigation measures to correct the impacts of the W.A.C. Bennett Dam and other alterations to the hydrology of the PAD and agree on operational strategies and interjurisdictional protocols for the implementation of the adopted mitigation measures, together with a sufficient budget for their implementation,
    6. Conduct an independent systematic risk assessment of the tailings ponds of the Alberta Oil Sands region, with a focus on risks to the PAD, before the end of 2024,
    7. Re-evaluate and adapt collaborative, systematic, science-based monitoring of oil sands impacts on the Athabasca River and PAD to ensure sufficient parameters, sampling design, and protocols are employed to detect impacts,
    8. Develop, before 2026, a clear, consensus-based strategy consistent with precautionary principles for the reclamation of tailing ponds, including the treatment and disposal of OSPW, which guarantees protection of the water quality of the Athabasca River and the PAD and avoids any impact on the OUV of the property,
    9. Ensure that all major development projects in the PAD watershed, including all oil sands mining extension projects, are subject to federal impact assessments and specifically address potential impacts on the OUV of the property, in line with the Guidance and Toolkit for Impacts Assessments in a World Heritage context,
    10. Ensure that all impact assessments of other projects in the larger landscape around the property that are not subject to federal impact assessment and that are under the responsibility of the Government of Alberta fully consider the OUV of the property and the concerns of indigenous rightsholders beyond the direct project footprint,
    11. Further strengthen the monitoring of flagship species, in particular the whooping crane and the wood Bison,
    12. Continue efforts to create a buffer zone under the World Heritage Convention around the property,
    13. Revise the 10-year Management Plan based on an agreed indigenous-led vision for a shared governance model for Wood Buffalo National Park and integrating strategies to address the key conservation concerns of the property,
    14. Further streamline the implementation of the Action Plan, including by improving inter-agency coordination, defining clear impact indicators, ensuring long-term and multiannual support and funding for capacity-building for indigenous rightsholders to enable full and effective participation, and ensuring that appropriate budget allocations are made for its implementation;
  9. Also notes the recommendation of the mission not to inscribe the property on the List of World Heritage in Danger at this stage to allow more time to implement the Action Plan updated with the above recommendations and also notes that a new Reactive Monitoring mission in 2026 would allow to assess whether sufficient progress has been made to reverse the current downward trends and avert further degradation of the OUV of the property, and whether the property meets the conditions for inscription on the List of World Heritage in Danger;
  10. Also requests the State Party to submit to the World Heritage Centre, by 1 February 2024, an updated Action Plan taking into account the recommendations of the 2022 mission;
  11. Finally requests the State Party to submit to the World Heritage Centre by 1 December 2024 an updated report on the state of conservation of the property and the implementation of the recommendations of the 2022 Reactive Monitoring mission, including the systematic risk assessment of the tailing ponds in the Alberta Oil Sands region, for examination by the World Heritage Committee at its 47th session.