Take advantage of the search to browse through the World Heritage Centre information.

Administration
Budget
Capacity Building
Communication
Community
Conservation
Credibility of the World Heritage ...
Inscriptions on the World Heritage ...
International Assistance
List of World Heritage in Danger
Operational Guidelines
Outstanding Universal Value
Partnerships
Periodic Reporting
Reinforced Monitoring
Reports
Tentative Lists
Working methods and tools
World Heritage Convention








2029 27 GA
2027 26 GA
2025 25 GA
2025 47 COM
2024 46 COM
2023 19 EXT.COM
2023 24 GA
2023 45 COM
2023 18 EXT.COM
2022 17 EXT.COM
2021 16 EXT.COM
2021 23 GA
2021 44 COM
2021 15 EXT.COM
2020 14 EXT.COM
2019 13 EXT.COM
2019 22 GA
2019 43 COM
2018 42 COM
2017 12 EXT.COM
2017 21 GA
2017 41 COM
2016 40 COM
2015 11 EXT.COM
2015 20 GA
2015 39 COM
2014 1 EXT.GA
2014 38 COM
2013 19 GA
2013 37 COM
2012 36 COM
2011 10 EXT.COM
2011 18 GA
2011 35 COM
2010 34 COM
2010 9 EXT.COM
2009 17 GA
2009 33 COM
2008 32 COM
2007 16 GA
2007 8 EXT.COM
2007 31 COM
2006 30 COM
2005 15 GA
2005 29 COM
2005 29 BUR
2004 7 EXT.COM
2004 7 EXT.BUR
2004 28 COM
2004 28 BUR
2003 14 GA
2003 27 COM
2003 27 BUR
2003 6 EXT.COM
2002 26 COM
2002 26 BUR
2001 25 COM
2001 25 EXT.BUR
2001 5 EXT.COM
2001 13 GA
2001 25 BUR
2000 24 COM
2000 24 EXT.BUR
2000 24 BUR(SPE)
2000 24 BUR
1999 23 COM
1999 23 EXT.BUR
1999 4 EXT.COM
1999 12 GA
1999 3 EXT.COM
1999 23 BUR
1998 22 COM
1998 22 EXT.BUR
1998 22 BUR
1997 21 COM
1997 21 EXT.BUR
1997 2 EXT.COM
1997 11 GA
1997 21 BUR
1996 20 COM
1996 20 EXT.BUR
1996 20 BUR
1995 19 COM
1995 19 EXT.BUR
1995 10 GA
1995 19 BUR
1994 18 COM
1994 18 EXT.BUR
1994 18 BUR
1993 17 COM
1993 17 EXT.BUR
1993 9 GA
1993 17 BUR
1992 16 COM
1992 16 BUR
1991 15 COM
1991 8 GA
1991 15 BUR
1990 14 COM
1990 14 BUR
1989 13 COM
1989 7 GA
1989 13 BUR
1988 12 COM
1988 12 BUR
1987 11 COM
1987 6 GA
1987 11 BUR
1986 10 COM
1986 10 BUR
1985 9 COM
1985 5 GA
1985 9 BUR
1984 8 COM
1984 8 BUR
1983 7 COM
1983 4 GA
1983 7 BUR
1982 6 COM
1982 6 BUR
1981 5 COM
1981 1 EXT.COM
1981 5 BUR
1980 3 GA
1980 4 COM
1980 4 BUR
1979 3 COM
1979 3 BUR
1979 2 BUR
1978 2 GA
1978 2 COM
1978 1 BUR
1977 1 COM
1976 1 GA

Decision 34 COM 7B.88
Bagrati Cathedral and Gelati Monastery (Georgia) (C 710)

The World Heritage Committee,

1. Having examined Document WHC-10/34.COM/7B.Add,

2. Recalling Decision 33 COM 7B.103, adopted at its 33rd session (Seville, 2009),

3. Acknowledges the information provided by the State Party on the "Bagrati Cathedral preliminary rehabilitation project", the general report on the studies conducted within the framework of this project and the "report on Bagrati Cathedral rehabilitation works";

4. Notes the recommendations of the joint World Heritage Centre/ICOMOS/ICCROM advisory mission to the property;

5. Expresses its serious concern about irreversible interventions carried out by the State Party as part of the preparations for the Bagrati Cathedral reconstruction project prior to any review or approval of the project and its impact on the Outstanding Universal Value, integrity and authenticity of the property;

6. Urges the State Party to halt immediately all interventions at Bagrati Cathedral, which threaten the Outstanding Universal Value, integrity and authenticity of the property;

7. Also urges the State Party to immediately adopt all necessary measures aiming to ensure the safeguarding of the Outstanding Universal Value, integrity and authenticity of the property, monitoring and survey of the state of conservation of the property, preparation, adoption and implementation of a Management Plan (including a tourism strategy and guidelines for the use of historic buildings and monuments, an Urban Master Plan and a Conservation Master Plan for the monuments);

8. Invites the State Party to organize a consultation with international conservation engineers and architectural conservators in order to consider how the interventions already carried out might be reversed entirely or in part and to consider the overall consolidation of the Bagrati Cathedral ruins;

9. Requests the State Party, in consultation with the World Heritage Centre and the Advisory Bodies, to develop a draft Statement of Outstanding Universal Value of the property, for examination by the World Heritage Committee at its 35th session in 2011.

10. Considers that the State Party has not complied with all the requests expressed by the Committee in Decision 33 COM 7B.103, and that therefore the property is in danger in conformity with Chapter IV.B of the Operational Guidelines and decides to inscribe the Bagrati Cathedral and Gelati Monastery (Georgia) on the List of World Heritage in Danger;

11. Adopts the following Desired State of Conservation for the property based on its Outstanding Universal Value, in view of its future removal from the List of World Heritage in Danger:

a) The reconstruction of the Bagrati Cathedral halted,

b) Interventions already carried out at the Bagrati Cathedral reversed (entirely or in part),

c) The overall consolidation project of the Bagrati Cathedral ruins, elaborated in consultation with international conservation engineers and architectural conservators, implemented,

d) The boundaries and buffer zone of all component parts of the World Heritage property precisely clarified,

e) A comprehensive management system including an integrated management plan with tourism strategy and guidelines for the use of historic buildings and monuments, conservation master plan for all components of the World Heritage property and its buffer zone and urban master plan including land-use regulations approved and implemented,

f) Long-term consolidation and conservation of the historical monuments of the Bagrati Cathedral and Gelati Monastery ensured;

12. Also adopts the following corrective measures and the timeframe for their implementation:

a) Changes to be carried out immediately:

- The reconstruction of the Bagrati Cathedral halted and a consultation organized with international conservation engineers and architectural conservators in order to consider how the interventions already carried out might be reversed (entirely or in part) and how the overall consolidation of the Bagrati Cathedral ruins might be achieved,

b) Changes to be carried out within one to two years:

- Interventions already carried out at the Bagrati Cathedral reversed entirely or in part (taking into consideration the underground reinforced concrete ring around the foundations of the building),

- An overall consolidation project of the Bagrati Cathedral ruins elaborated in consultation with international conservation engineers and architectural conservators,

- Monitoring regimes for the physical conservation of all components of the property to ensure the long-term conservation, consolidation and protection of the property developed,

- A clear institutional coordination mechanism, ensuring that the conservation of the property receives priority consideration within relevant governmental decision-making processes, established,

c) Changes to be carried out within two to three years:

- Legislation adopted that assures the protection and maintenance of all the component parts of the property in order to sustain its Outstanding Universal Value,

- A comprehensive management system adopted that includes an Integrated Management Plan with tourism strategy and guidelines for the use of historic buildings and monuments, Conservation Master Plan for all components of the property and its buffer zone and an Urban Master Plan including land-use regulations,

d) Changes to be carried out within five years (after possible removal from the List of World Heritage in Danger in 2 to 3 years):

- Documentation and recording of all historical monuments as a digitized information database for management, conservation and planning purposes completed,

- A full inventory of paintings including digitalization and reference system for all historical monuments of the property established,

- Agreed upon restoration of all monuments, including paintings carried out,

- A complex programme for the structural conservation and restoration of the churches, in Gelati Monastery to be carried out,

- A complex programme for the systematic cleaning, conservation and restoration of the interior wall-paintings and mosaics in Gelati Monastery churches, with the involvement and collaboration of international specialists in this domain, to be carried out;

13. Also requests the State Party to submit to the World Heritage Centre, by 1 February 2011, a report on the state of conservation of the property and on the steps taken to implement the World Heritage Committee's decision, including three printed and electronic copies of the draft management plan, for examination by the World Heritage Committee at its 35th session in 2011, considering that, if further reconstruction works are carried out on Bagrati Cathedral, the property might be considered, in conformity with Chapter IV.C of the Operational Guidelines, for deletion from the World Heritage List.

Decision Code
34 COM 7B.88
Themes
Conservation, List of World Heritage in Danger
States Parties 1
Properties 1
Year
2010
State of conservation reports
2010 Gelati Monastery
Documents
WHC-10/34.COM/20
Report of the Decisions Adopted By the world heritage committee At its 34th session (Brasilia, 2010)
Context of Decision
WHC-10/34.COM/7B.Add
top