Policy Compendium
Paragraph 169
“Reactive Monitoring is the reporting by the Secretariat, other sectors of UNESCO and the Advisory Bodies to the Committee on the state of conservation of specific World Heritage properties that are under threat. To this end, the States Parties shall submit specific reports and impact studies each time exceptional circumstances occur or work is undertaken which may have an impact on the Outstanding Universal Value of the property or its state of conservation. Reactive Monitoring is also foreseen in reference to properties inscribed, or to be inscribed, on the List of World Heritage in Danger (…). Reactive Monitoring is also foreseen in the procedures for the eventual deletion of properties from the World Heritage List (…)”.
Theme: | 3.2.3 - Reactive Monitoring |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 170
“When adopting the process of Reactive Monitoring, the Committee was particularly concerned that all possible measures should be taken to prevent the deletion of any property from the List and was ready to offer technical co-operation as far as possible to States Parties in this connection.”Theme: | 3.2.3 - Reactive Monitoring |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Theme: | 3.2.3 - Reactive Monitoring |
Decision: | 43 COM 7.1 |
Theme: | 3.5.3 - Utilities or service infrastructure |
Decision: | 40 COM 7 |
Threats: | Localised utilities Major linear utilities Non-renewable energy facilities Renewable energy facilities Water infrastructure |
The World Heritage Committee recommends to strengthen the protection of the immediate and wider setting of properties for addressing the impact of wind turbines, and to identify a wind turbine exclusion zone, based on the potential visual impact on the components of the property (based on Case law on decisions on the State of Conservation).
Theme: | 3.5.3 - Utilities or service infrastructure |
See for examples Decisions: | 32 COM 7B.118 34 COM 7B.83 36 COM 7B.74 41 COM 7B.45 41 COM 8B.19 |
Threats: | Localised utilities Major linear utilities Non-renewable energy facilities Renewable energy facilities Water infrastructure |
The World Heritage Committee requests to conduct an adequate environmental impact study for the power transmission lines, before any decision is taken (based on Case law on decisions on the State of Conservation).
Theme: | 3.5.3 - Utilities or service infrastructure |
See for examples Decisions: | 21 BUR IVB.33 25 BUR V.126-127 37 COM 7B.79 38 COM 7B.59 |
Threats: | Localised utilities Major linear utilities Non-renewable energy facilities Renewable energy facilities Water infrastructure |