Policy Compendium
Article 11
5. "The Committee shall define the criteria on the basis of which a property belonging to the cultural or natural heritage may be included in either of the lists mentioned in paragraphs 2 and 4 of this article."
Theme: | 2.2.2.1 - General |
Source: | Convention Concerning the Protection of the World Cultural and Natural Heritage |
Paragraph 166
“Where a State Party wishes to have the property inscribed under additional, fewer or different criteria other than those used for the original inscription, it shall submit this request as if it were a new nomination (including the requirement to be previously included on the Tentative List – see paragraph 63 and 65). This re-nomination must be received by 1 February and will be evaluated in the full year and a half cycle of evaluation according to the procedures and timetable outlined in paragraph 168. Properties recommended will only be evaluated under the new criteria and will remain on the World Heritage List even if unsuccessful in having additional criteria recognized.”Theme: | 2.2.2.1 - General |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Code: | 1660 |
Theme: | 2.2.2.1 - General |
Decision: | 3 COM XI.35 |
19. "(...)
(a) Because of the educational and public information purposes of the World Heritage List, the criteria for the inclusion of properties in the List have been elaborated with a view to enabling the Committee to act with full independence in evaluating the intrinsic merit of a property without regard to any other consideration (including the need for technical co-operation support).
(f) The criteria for the inclusion of cultural properties in the World Heritage List should always be seen in relation to one another and should be considered in the context of the definitions set out in· Article 1 of the Convention."
Theme: | 2.2.2.1 - General |
Decision: | 4 COM VI.18-20 |
15.c) "[The World Heritage Committee encourages States Parties to] (…) be proactive in relation to development and conservation of World Heritage properties by conducting a Strategic Environmental Assessment (SEA) at the time of nomination to anticipate the impact of any potential development on the Outstanding Universal Value."
Theme: | 2.2.5.5 - Impact assessment |
Decision: | 35 COM 12E |
Paragraph 163
“A minor modification is one which has not a significant impact on the extent of the property nor affects its Outstanding Universal Value.”
Theme: | 2.2.6.3 - Minor modifications to the boundaries |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 164
“If a State Party wishes to request a minor modification to the boundaries of a property already on the World Heritage List, it must be prepared in compliance with the format of Annex 11 and must be received by 1 February by the Committee through the Secretariat, which will seek the evaluation of the relevant Advisory Bodies on whether this can be considered a minor modification or not. The Secretariat shall then submit the Advisory Bodies’ evaluation to the World Heritage Committee. The Committee may approve such a modification, or it may consider that the modification to the boundary is sufficiently significant as to constitute a significant boundary modification of the property, in which case the procedure for new nominations will apply.”
Theme: | 2.2.6.3 - Minor modifications to the boundaries |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 165
“If a State Party wishes to significantly modify the boundary of a property already on the World Heritage List, the State Party shall submit this proposal as if it were a new nomination (including the requirement to be previously included on the Tentative List – see paragraph 63 and 65). This re-nomination shall be presented by 1 February and will be evaluated in the full year and a half cycle of evaluation according to the procedures and timetable outlined in paragraph 168. This provision applies to extensions, as well as reductions.”Theme: | 2.2.6.4 - Significant modifications to the boundaries |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
The World Heritage Policy Compendium was elaborated thanks to the generous contribution of the Government of Australia.
The World Heritage Policy Compendium On-line tool was developed thanks to the generous contribution of the Government of Korea.