Policy Compendium
Paragraph 79
“Properties nominated under criteria (i) to (vi) must meet the conditions of authenticity. Annex 4 which includes the Nara Document on Authenticity, provides a practical basis for examining the authenticity of such properties and is summarized below.”
Theme: | 2.2.3 - Authenticity |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 80
“The ability to understand the value attributed to the heritage depends on the degree to which information sources about this value may be understood as credible or truthful. Knowledge and understanding of these sources of information, in relation to original and subsequent characteristics of the cultural heritage, and their meaning as accumulated over time, are the requisite bases for assessing all aspects of authenticity.”
Theme: | 2.2.3 - Authenticity |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 81
“Judgments about value attributed to cultural heritage, as well as the credibility of related information sources, may differ from culture to culture, and even within the same culture. The respect due to all cultures requires that cultural heritage must be considered and judged primarily within the cultural contexts to which it belongs.”Theme: | 2.2.3 - Authenticity |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 84
“The use of all these sources permits elaboration of the specific artistic, historic, social, and scientific dimensions of the cultural heritage being examined. "Information sources" are defined as all physical, written, oral, and figurative sources, which make it possible to know the nature, specificities, meaning, and history of the cultural heritage.”
Theme: | 2.2.3 - Authenticity |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 85
“When the conditions of authenticity are considered in preparing a nomination for a property, the State Party should first identify all of the applicable significant attributes of authenticity. The statement of authenticity should assess the degree to which authenticity is present in, or expressed by, each of these significant attributes.”Theme: | 2.2.3 - Authenticity |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 86
“In relation to authenticity, the reconstruction of archaeological remains or historic buildings or districts is justifiable only in exceptional circumstances. Reconstruction is acceptable only on the basis of complete and detailed documentation and to no extent on conjecture.”Theme: | 2.2.3 - Authenticity |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Theme: | 2.2.3 - Authenticity |
Decision: | 3 COM XI.35 |
The World Heritage Committee recommends paying particular attention to the conservation of authenticity and to inaccurate reconstructions and the risk of over-interpretation, with regard to restoration and development works, including architectural restorations and of technical historical reconstructions (based on Case law on decisions on Nominations).
Theme: | 2.2.3 - Authenticity |
See for examples Decisions: | 37 COM 8B.41 38 COM 8B.34 |
The World Heritage Committee encourages the use of traditional materials and skills in restoration works and interventions (based on Case law on decisions on the State of Conservation).
Theme: | 2.2.3 - Authenticity |
See for examples Decisions: | 34 COM 7B.53 38 COM 7B.52 40 COM 7B.41 41 COM 7B.46 43 COM 7A.33 43 COM 7B.76 |
Synthesis based on relevant Committee decisions
The World Heritage Committee requests to ensure the management of a serial property as a unified whole, with an effective and explicit operational coordination between management plans existing for individual component parts of the site and the overall management plan for the property (based on case law on decisions on Nomination).
Theme: | 2.2.5.3 - Management systems |
See for examples Decisions: | 40 COM 8B.16 43 COM 8B.38 44 COM 8B.25 44 COM 8B.15 |
Paragraph 108
“Each nominated property should have an appropriate management plan or other documented management system which must specify how the Outstanding Universal Value of a property should be preserved, preferably through participatory means.”
Theme: | 2.2.5.3 - Management systems |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 109
“The purpose of a management system is to ensure the effective protection of the nominated property for present and future generations.”
Theme: | 2.2.5.3 - Management systems |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 110
“An effective management system depends on the type, characteristics and needs of the nominated property and its cultural and natural context. Management systems may vary according to different cultural perspectives, the resources available and other factors. They may incorporate traditional practices, existing urban or regional planning instruments, and other planning control mechanisms, both formal and informal. Impact assessments for proposed interventions are essential for all World Heritage properties.”
Theme: | 2.2.5.3 - Management systems |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 111
“In recognizing the diversity mentioned above, common elements of an effective management system could include:
a) a thorough shared understanding of the property, its universal, national and local values and its socio-ecological context by all stakeholders, including local communities and indigenous peoples;
b) a respect for diversity, equity, gender equality and human rights and the use of inclusive and participatory planning and stakeholder consultation processes;
c) a cycle of planning, implementation, monitoring, evaluation and feedback;
d) an assessment of the vulnerabilities of the property to social, economic, environmental and other pressures and changes, including disasters and climate change, as well as the monitoring of the impacts of trends and proposed interventions;
e) the development of mechanisms for the involvement and coordination of the various activities between different partners and stakeholders;
f) the allocation of necessary resources;
g) capacity building;
h) an accountable, transparent description of how the management system functions."
Theme: | 2.2.5.3 - Management systems |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 112
“Effective management involves a cycle of short, medium and long-term actions to protect, conserve and present the nominated property. An integrated approach to planning and management is essential to guide the evolution of properties over time and to ensure maintenance of all aspects of their Outstanding Universal Value. This approach goes beyond the property to include any buffer zone(s), as well as the broader setting. The broader setting may relate to the property’s topography, natural and built environment, and other elements such as infrastructure, land use patterns, spatial organization, and visual relationships. It may also include related social and cultural practices, economic processes and other intangible dimensions of heritage such as perceptions and associations. Management of the broader setting is related to its role in supporting the Outstanding Universal Value. Its effective management may also contribute to sustainable development, through harnessing the reciprocal benefits for heritage and society.”
Theme: | 2.2.5.3 - Management systems |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 117
“States Parties are responsible for implementing effective management activities for a World Heritage property. States Parties should do so in close collaboration with property managers, the agency with management authority and other partners, local communities and indigenous peoples, rights-holders and stakeholders in property management, by developing, when appropriate, equitable governance arrangements, collaborative management systems and redress mechanisms.”Theme: | 2.2.5.3 - Management systems |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 118
“The Committee recommends that States Parties include disaster, climate change and other risk preparedness as an element in their World Heritage site management plans and training strategies.”
Theme: | 2.2.5.3 - Management systems |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
15.c) "[The World Heritage Committee encourages States Parties to] (…) be proactive in relation to development and conservation of World Heritage properties by conducting a Strategic Environmental Assessment (SEA) at the time of nomination to anticipate the impact of any potential development on the Outstanding Universal Value."
Theme: | 2.2.5.5 - Impact assessment |
Decision: | 35 COM 12E |
Article 11
1. "Every State Party to this Convention shall, in so far as possible, submit to the World Heritage Committee an inventory of property forming part of the cultural and natural heritage, situated in its territory and suitable for inclusion in the list provided for in paragraph 2 of this Article. This inventory, which shall not be considered exhaustive, shall include documentation about the location of the property in question and its significance."
Theme: | 2.5 - Tentative Lists |
Source: | Convention Concerning the Protection of the World Cultural and Natural Heritage |
Paragraph 62
“A Tentative List is an inventory of those properties situated on its territory which each State Party considers suitable for nomination to the World Heritage List. States Parties should therefore include, in their Tentative Lists, details of those properties which they consider to be of potential Outstanding Universal Value and which they intend to nominate during the following years.”
Theme: | 2.5 - Tentative Lists |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 63
“Nominations to the World Heritage List are not considered unless the nominated property has already been included on the State Party's Tentative List.”
Theme: | 2.5 - Tentative Lists |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 64
“States Parties are encouraged to prepare their Tentative Lists with the full, effective and gender-balanced participation of a wide variety of stakeholders and rights-holders, including site managers, local and regional governments, local communities, indigenous peoples, NGOs and other interested parties and partners. In the case of sites affecting the lands, territories or resources of indigenous peoples, States Parties shall consult and cooperate in good faith with the indigenous peoples concerned through their own representative institutions in order to obtain their free, prior and informed consent before including the sites on their Tentative List.”
Theme: | 2.5 - Tentative Lists |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 65
“States Parties shall submit Tentative Lists to the Secretariat, at least one year prior to the submission of any nomination. States Parties are encouraged to re-examine and re-submit their Tentative List at least every ten years.”
Theme: | 2.5 - Tentative Lists |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 68
“(…) The sole responsibility for the content of each Tentative List lies with the State Party concerned. The publication of the Tentative Lists does not imply the expression of any opinion whatsoever of the World Heritage Committee or of the World Heritage Centre or of the Secretariat of UNESCO concerning the legal status of any country, territory, city or area or of its boundaries.”
Theme: | 2.5 - Tentative Lists |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 70
“Tentative Lists are a useful and important planning tool for States Parties, the World Heritage Committee, the Secretariat, and the Advisory Bodies, as they provide an indication of future nominations.”
Theme: | 2.5 - Tentative Lists |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 73
“States Parties are encouraged to harmonize their Tentative Lists at regional and thematic levels. Harmonization of Tentative Lists is the process whereby States Parties, with the assistance of the Advisory Bodies, collectively assess their respective Tentative List to review gaps and identify common themes. The harmonization has considerable potential to generate fruitful dialogue between States Parties and different cultural communities, promoting respect for common heritage and cultural diversity and can result in improved Tentative Lists, new nominations from States Parties and cooperation amongst groups of States Parties in the preparation of nominations.”
Theme: | 2.5 - Tentative Lists |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
2. "Stressing the importance of the process of revision and updating of Tentative Lists, as a tool for regional harmonisation of the World Heritage List and long-term planning of its development,
3. [The World Heritage Committee] encourages States Parties to seek as early as possible upstream advice from the World Heritage Centre and the Advisory Bodies during the development or revision of their Tentative Lists as appropriate."
Theme: | 2.5 - Tentative Lists |
Decision: | 41 COM 8A |
Paragraph 134
“A nominated property may occur:
a) on the territory of a single State Party, or
b) on the territory of all concerned States Parties having adjacent borders (transboundary property).”
Theme: | 2.7.2 - Transboundary and transnational properties |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 135
“Wherever possible, transboundary nominations should be prepared and submitted by States Parties jointly in conformity with Article 11.3 of the Convention. It is highly recommended that the States Parties concerned establish a joint management committee or similar body to oversee the management of the whole of a transboundary property.”
Theme: | 2.7.2 - Transboundary and transnational properties |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 136
“Extensions to an existing World Heritage property located in one State Party may be proposed to become transboundary properties.”
Theme: | 2.7.2 - Transboundary and transnational properties |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
“II. TRANSBOUNDARY AND TRANSNATIONAL NOMINATIONS
6) [The World Heritage Committee] decides to consider as:(a) transboundary nomination, only a property jointly nominated as such, in conformity with Article 11.3 of the Convention, by all concerned States Parties having adjacent borders;
(b) transnational nomination, a serial nomination of properties located in the territory of different States Parties, which need not be contiguous and which are nominated with the consent of all States Parties concerned”.
Theme: | 2.7.2 - Transboundary and transnational properties |
Decision: | 7 EXT.COM 4A |
3. "[The World Heritage Committee] aware of the need to specify the submission modalities for the nomination of transboundary or transnational serial properties on the World Heritage List,
4. (…):
a) The States Parties co-authors of a transboundary or transnational serial nomination can choose, amongst themselves and with a common understanding, the State Party which will be bearing this nomination; and
b) This nomination can be registered exclusively within the ceiling of the bearing State Party."
Theme: | 2.7.2 - Transboundary and transnational properties |
Decision: | 29 COM 18A |
The World Heritage Policy Compendium was elaborated thanks to the generous contribution of the Government of Australia.
The World Heritage Policy Compendium On-line tool was developed thanks to the generous contribution of the Government of Korea.