Take advantage of the search to browse through the World Heritage Centre information.

Policy Compendium

Themes2.7.4.1 - Generalclose2.2.6.2 - Buffer Zonesclose2.2.6.1 - Boundariesclose2.2.5.2 - Legislative, regulatory and contractual measures for protectionclose2.2.2.2 - Specific considerations related to criterion (vi)close2.4 - Upstream Processclose2 - Policies Regarding CREDIBILITY of the World Heritage Listclose
Select source(s): 0
2 - Policies Regarding CREDIBILITY of the World Heritage List
2.2 - Outstanding Universal Value
2.2.2 - World Heritage criteria

Paragraph 77

"Criterion vi [To] be directly or tangibly associated with events or living traditions, with ideas, or with beliefs, with artistic and literary works of outstanding universal significance. (The Committee considers that this criterion should preferably be used in conjunction with other criteria)."

Theme: 2.2.2.2 - Specific considerations related to criterion (vi)
Source: OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019)
2 - Policies Regarding CREDIBILITY of the World Heritage List
2.2 - Outstanding Universal Value
2.2.2 - World Heritage criteria
J. Note 11 (iii) “In order to preserve its symbolic status as a monument to all the victims, Auschwitz should, it seems, remain in isolation. In other words, we recommend that it should stand alone among cultural properties as bearing witness to the depth of horror and of suffering, and the height of heroism, and that all other sites of the same nature be symbolized through it”.

Conclusions. “Sites representing the positive and negative sides of human history will only be invested with real force if we make the most remarkable into unique symbols, each one standing for the whole series of similar events”.

Theme: 2.2.2.2 - Specific considerations related to criterion (vi)
Source: CC-79/CONF.003/11 Principles and criteria for inclusion of properties on World Heritage List
2 - Policies Regarding CREDIBILITY of the World Heritage List
2.2 - Outstanding Universal Value
2.2.2 - World Heritage criteria
31. “The Committee decided to enter Auschwitz concentration camp on the List as a unique site and to restrict the inscription of other sites of a similar nature.”
Theme: 2.2.2.2 - Specific considerations related to criterion (vi)
Decision: 3 COM XII.46
2 - Policies Regarding CREDIBILITY of the World Heritage List
2.2 - Outstanding Universal Value
2.2.5 - Protection and management

Paragraph 98

“Legislative and regulatory measures at national and local levels should assure the protection of the property from social, economic and other pressures or changes that might negatively impact the Outstanding Universal Value, including the integrity and/or authenticity of the property. States Parties should also assure the full and effective implementation of such measures.”
Theme: 2.2.5.2 - Legislative, regulatory and contractual measures for protection
Source: OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019)
2 - Policies Regarding CREDIBILITY of the World Heritage List
2.2 - Outstanding Universal Value
2.2.6 - Boundaries and buffer zones

Paragraph 99

“The delineation of boundaries is an essential requirement in the establishment of effective protection of nominated properties. Boundaries should be drawn to incorporate all the attributes that convey the Outstanding Universal Value and to ensure the integrity and/or authenticity of the property.”

Theme: 2.2.6.1 - Boundaries
Source: OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019)
2 - Policies Regarding CREDIBILITY of the World Heritage List
2.2 - Outstanding Universal Value
2.2.6 - Boundaries and buffer zones

Paragraph 100

“For properties nominated under criteria (i) - (vi), boundaries should be drawn to include all those areas and attributes which are a direct tangible expression of the Outstanding Universal Value of the property, as well as those areas which in the light of future research possibilities offer potential to contribute to and enhance such understanding.”

Theme: 2.2.6.1 - Boundaries
Source: OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019)
2 - Policies Regarding CREDIBILITY of the World Heritage List
2.2 - Outstanding Universal Value
2.2.6 - Boundaries and buffer zones

Paragraph 101

“For properties nominated under criteria (vii) - (x), boundaries should reflect the spatial requirements of habitats, species, processes or phenomena that provide the basis for their inscription on the World Heritage List. The boundaries should include sufficient areas immediately adjacent to the area of Outstanding Universal Value in order to protect the property's heritage values from direct effect of human encroachments and impacts of resource use outside of the nominated area.”

Theme: 2.2.6.1 - Boundaries
Source: OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019)
2 - Policies Regarding CREDIBILITY of the World Heritage List
2.2 - Outstanding Universal Value
2.2.6 - Boundaries and buffer zones

Paragraph 102

“The boundaries of the nominated property may coincide with one or more existing or proposed protected areas, such as national parks or nature reserves, biosphere reserves or protected cultural or historic districts or other areas and territories. While such established areas for protection may contain several management zones, only some of those zones may satisfy requirements for inscription.”

Theme: 2.2.6.1 - Boundaries
Source: OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019)
2 - Policies Regarding CREDIBILITY of the World Heritage List
2.2 - Outstanding Universal Value
2.2.6 - Boundaries and buffer zones
7. "[The World Heritage Committee] considers that modifications to boundaries of World Heritage properties that are related to mining activities should be considered through the procedure for significant modifications of boundaries, in accordance with paragraph 165 of the Operational Guidelines, given the potential impact of such projects on Outstanding Universal Value."
Theme: 2.2.6.1 - Boundaries
Decision: 35 COM 8B.46
2 - Policies Regarding CREDIBILITY of the World Heritage List
2.2 - Outstanding Universal Value
2.2.6 - Boundaries and buffer zones
"21. [The World Heritage Committee] (u)rges States Parties, with the support of the World Heritage Centre and the Advisory Bodies, to:
a) Incorporate well-designed buffer zones based on a holistic understanding of natural as well as human induced factors affecting the property, supported by reinforcing relevant legal, policy, awareness and incentive mechanisms, into new nominations and where appropriate into existing properties to ensure enhanced protection of World Heritage properties,
b) Place particular emphasis on strategic environmental assessment and impact assessments for potential projects within buffer zones to avoid, negative impacts on OUV from developments and activities in these zones,
c) Develop buffer zone protection and management regimes that optimize the capture and sharing of benefits to communities to support the aspirations of the 2015 Policy for the integration of a Sustainable Development Perspective into the processes of the World Heritage Convention,
d) Ensure buffer zones are supported by appropriate protection and management regimes in line with the property’s OUV, that build connectivity with the wider setting in cultural, environmental and landscape terms."
Theme: 2.2.6.2 - Buffer Zones
Decision: 44 COM 7.2
2 - Policies Regarding CREDIBILITY of the World Heritage List
2.2 - Outstanding Universal Value
2.2.6 - Boundaries and buffer zones

Paragraph 103

“Wherever necessary for the proper protection of the property, an adequate buffer zone should be provided.”

Theme: 2.2.6.2 - Buffer Zones
Source: OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019)
2 - Policies Regarding CREDIBILITY of the World Heritage List
2.2 - Outstanding Universal Value
2.2.6 - Boundaries and buffer zones

Paragraph 104

“For the purposes of effective protection of the nominated property, a buffer zone is an area surrounding the nominated property which has complementary legal and/or customary restrictions placed on its use and development to give an added layer of protection to the property. This should include the immediate setting of the nominated property, important views and other areas or attributes that are functionally important as a support to the property and its protection. The area constituting the buffer zone should be determined in each case through appropriate mechanisms. Details on the size, characteristics and authorized uses of a buffer zone, as well as a map indicating the precise boundaries of the property and its buffer zone, should be provided in the nomination.”

Theme: 2.2.6.2 - Buffer Zones
Source: OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019)
2 - Policies Regarding CREDIBILITY of the World Heritage List
2.2 - Outstanding Universal Value
2.2.6 - Boundaries and buffer zones

Paragraph 105

“A clear explanation of how the buffer zone protects the property should also be provided.”

Theme: 2.2.6.2 - Buffer Zones
Source: OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019)
2 - Policies Regarding CREDIBILITY of the World Heritage List
2.2 - Outstanding Universal Value
2.2.6 - Boundaries and buffer zones

Paragraph 106

“Where no buffer zone is proposed, the nomination should include a statement as to why a buffer zone is not required.”

Theme: 2.2.6.2 - Buffer Zones
Source: OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019)
2 - Policies Regarding CREDIBILITY of the World Heritage List
2.2 - Outstanding Universal Value
2.2.6 - Boundaries and buffer zones

Paragraph 107

“Although buffer zones are not part of the nominated property, any modifications to or creation of buffer zones subsequent to inscription of a property on the World Heritage List should be approved by the World Heritage Committee using the procedure for a minor boundary modification (see paragraph 164 and Annex 11). The creation of buffer zones subsequent to inscription is normally considered to be a minor boundary modification.”

Theme: 2.2.6.2 - Buffer Zones
Source: OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019)
2 - Policies Regarding CREDIBILITY of the World Heritage List

Paragraph 122

"122. The Preliminary Assessment is a mandatory desk-based process for all sites that may be nominated to the World Heritage List and is undertaken following a request by the relevant State(s) Party(ies). Information included in the Preliminary Assessment request should build on the information provided in the Tentative List and also on any Upstream Process advice and/or Preparatory Assistance and its outcome must be provided at least one year before a full nomination dossier can be submitted by the State(s) Party(ies).

In particular:

a) The Preliminary Assessment provides States Parties with an opportunity for enhanced dialogue with the Advisory Bodies, and it will help to establish the feasibility of a potential nomination and avoid the use of resources in the preparation of nominations that may be unlikely to succeed. 

b) The Preliminary Assessment provides guidance on the potential of a site to justify Outstanding Universal Value, including integrity and/or authenticity, and, if information is provided, on the requirements for protection and management. The decision to prepare a full nomination dossier, regardless of the outcome of the Preliminary Assessment, will rest with the concerned State(s) Party(ies).

c) States Parties shall submit their Preliminary Assessment request to the World Heritage Centre according to the timetable set in paragraph 168, and using the standard format provided in Annex 3. The request shall be submitted in English or French, in paper and electronic formats (Word and/or PDF format) and in the required number of printed copies (same as for nomination dossiers): 2 identical copies for cultural and natural sites, and 3 identical copies for mixed sites and cultural landscapes.

d) On receipt of Preliminary Assessment requests from States Parties, the Secretariat will acknowledge receipt, check for completeness (in compliance with Annex 3) and register them. The Secretariat will forward, according to the timetable set in paragraph 168, complete Preliminary Assessment requests to the relevant Advisory Body(ies) for desk review. If necessary, the Advisory Body(ies) will request any additional information from the State(s) Party(ies), which should be submitted to the Secretariat. From the commencement of the Preliminary Assessment, the Advisory Body(ies) will initiate a dialogue with the concerned State(s) Party(ies) to establish a point of contact and agree on the process of exchange. States Parties are encouraged to appoint a technical focal point to ensure that dialogue is effective throughout the process, and to ensure that the conclusions of the Preliminary Assessment are communicated to the relevant stakeholders.

e) The Preliminary Assessment will be undertaken by ICOMOS and IUCN on a joint basis whenever relevant, and will be an independent desk review, which will include consultation with expert reviewers.  No mission to the site will be undertaken (see Annex 6). Based on available information, the conclusions of the assessment will include an indication of whether the site may have potential to justify Outstanding Universal Value. If so, specific guidance and advice, in the form of recommendations, will be provided to assist the State(s) Party(ies) in the development of the nomination dossier. The Preliminary Assessment Report by the Advisory Bodies shall be provided to the State(s) Party(ies) via the Secretariat in one of the two working languages of the Convention. 

f) The Preliminary Assessment Report by the Advisory Bodies is relevant for up to 5 years. A new Preliminary Assessment is required if a nomination is not submitted by 1 February on the fifth year following the transmission of the Report to the concerned State(s) Party(ies). 

g) A State Party may withdraw a Preliminary Assessment request it has submitted, at any time.  In such circumstances, any further consideration of a possible nomination will need to be subject to a new request for a Preliminary Assessment.

h) At each session of the World Heritage Committee, the Secretariat will provide a list of Preliminary Assessments requests received and those undertaken, but will not indicate the guidance given by the Advisory Bodies to the concerned State(s) Party(ies) in a completed Preliminary Assessment. However, once a nomination is submitted, the related Preliminary Assessment Report shall be annexed to it.

i) Both Upstream Process and Preliminary Assessment imply guidance at an early stage, prior to the preparation of a nomination, however they are different mechanisms. The Upstream Process is not mandatory. The Preliminary Assessment is a mandatory phase possibly allowing access to the preparation of a nomination dossier. Within an Upstream Process a visit to the site may be possible, while the Preliminary Assessment is carried out exclusively on the basis of a desk review.  The Upstream Process may provide general advice, in relation to revision of a Tentative List, while the Preliminary Assessment is undertaken on a single site (whether serial or not) already included on a State Party’s Tentative List. While in general the costs of Upstream Process requests are borne by the requesting State(s) Party(ies), the costs of Preliminary Assessments, being part of the nomination process, are included in the related evaluation process (see also Paragraph 168bis). In terms of sequence, Upstream Process advice should precede the Preliminary Assessment."
Theme: 2.4 - Upstream Process
Source: WHC.21/01 Operational Guidelines for the Implementation of the World Heritage Convention (WHC.21/01 2021)
2 - Policies Regarding CREDIBILITY of the World Heritage List
4. "[The World Heritage Committee] (…) recalls that, in order to be effective, the upstream support should ideally take place at an early stage, preferably at the moment of the preparation or revision of the States Parties’ Tentative Lists."
Theme: 2.4 - Upstream Process
Decision: 41 COM 9A
2 - Policies Regarding CREDIBILITY of the World Heritage List
2.7 - Types of World Heritage properties
2.7.4 - Cultural Landscapes

Paragraph 47

"47. Cultural landscapes inscribed on the World Heritage List are cultural properties and represent the “combined works of nature and of man” designated in Article 1 of the Convention. They are illustrative of the evolution of human society and settlement over time, under the influence of the physical constraints and/or opportunities presented by their natural environment and of successive social, economic and cultural forces, both external and internal.

They should be selected on the basis both of their Outstanding Universal Value and of their representativity in terms of a clearly defined geo-cultural region. They should be selected also for their capacity to illustrate the essential and distinct cultural elements of such regions.

The term “cultural landscape” embraces a diversity of manifestations of the interaction between humankind and the natural environment.

Cultural landscapes often reflect specific techniques of sustainable land use, considering the characteristics and limits of the natural environment they are established in, and may reflect a specific spiritual relationship to nature. Protection of cultural landscapes can contribute to current techniques of sustainable land use and can maintain or enhance natural values in the landscape. The continued existence of traditional forms of land use supports biological diversity in many regions of the world. The protection of traditional cultural landscapes is therefore helpful in maintaining biological diversity".
Theme: 2.7.4.1 - General
Source: WHC.21/01 Operational Guidelines for the Implementation of the World Heritage Convention (WHC.21/01 2021)
2 - Policies Regarding CREDIBILITY of the World Heritage List
2.7 - Types of World Heritage properties
2.7.4 - Cultural Landscapes
Synthesis based on relevant Committee decisions

The World Heritage committee recommends addressing landscape surveys and the historic evolution of the landscape, as a holistic reflection of history and cultural traditions and of the interaction between culture and nature, including the way the landscape has been shaped by human practices and natural resources (based on Case law on decisions on Nominations).
Theme: 2.7.4.1 - General
See for examples Decisions:  31 COM 8B.33 31 COM 8B.28

The World Heritage Policy Compendium was elaborated thanks to the generous contribution of the Government of Australia.

The World Heritage Policy Compendium On-line tool was developed thanks to the generous contribution of the Government of Korea.


With the Support of

top