Policy Compendium
Article 11
5. "The Committee shall define the criteria on the basis of which a property belonging to the cultural or natural heritage may be included in either of the lists mentioned in paragraphs 2 and 4 of this article."
Theme: | 2.2.2.1 - General |
Source: | Convention Concerning the Protection of the World Cultural and Natural Heritage |
Paragraph 166
“Where a State Party wishes to have the property inscribed under additional, fewer or different criteria other than those used for the original inscription, it shall submit this request as if it were a new nomination (including the requirement to be previously included on the Tentative List – see paragraph 63 and 65). This re-nomination must be received by 1 February and will be evaluated in the full year and a half cycle of evaluation according to the procedures and timetable outlined in paragraph 168. Properties recommended will only be evaluated under the new criteria and will remain on the World Heritage List even if unsuccessful in having additional criteria recognized.”Theme: | 2.2.2.1 - General |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Code: | 1660 |
Theme: | 2.2.2.1 - General |
Decision: | 3 COM XI.35 |
19. "(...)
(a) Because of the educational and public information purposes of the World Heritage List, the criteria for the inclusion of properties in the List have been elaborated with a view to enabling the Committee to act with full independence in evaluating the intrinsic merit of a property without regard to any other consideration (including the need for technical co-operation support).
(f) The criteria for the inclusion of cultural properties in the World Heritage List should always be seen in relation to one another and should be considered in the context of the definitions set out in· Article 1 of the Convention."
Theme: | 2.2.2.1 - General |
Decision: | 4 COM VI.18-20 |
Paragraph 77
"Criterion vi [To] be directly or tangibly associated with events or living traditions, with ideas, or with beliefs, with artistic and literary works of outstanding universal significance. (The Committee considers that this criterion should preferably be used in conjunction with other criteria)."
Theme: | 2.2.2.2 - Specific considerations related to criterion (vi) |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Conclusions. “Sites representing the positive and negative sides of human history will only be invested with real force if we make the most remarkable into unique symbols, each one standing for the whole series of similar events”.
Theme: | 2.2.2.2 - Specific considerations related to criterion (vi) |
Source: | CC-79/CONF.003/11 Principles and criteria for inclusion of properties on World Heritage List |
Theme: | 2.2.2.2 - Specific considerations related to criterion (vi) |
Decision: | 3 COM XII.46 |
Synthesis based on relevant Committee decisions
The World Heritage Committee requests to ensure the management of a serial property as a unified whole, with an effective and explicit operational coordination between management plans existing for individual component parts of the site and the overall management plan for the property (based on case law on decisions on Nomination).
Theme: | 2.2.5.3 - Management systems |
See for examples Decisions: | 40 COM 8B.16 43 COM 8B.38 44 COM 8B.25 44 COM 8B.15 |
Paragraph 108
“Each nominated property should have an appropriate management plan or other documented management system which must specify how the Outstanding Universal Value of a property should be preserved, preferably through participatory means.”
Theme: | 2.2.5.3 - Management systems |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 109
“The purpose of a management system is to ensure the effective protection of the nominated property for present and future generations.”
Theme: | 2.2.5.3 - Management systems |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 110
“An effective management system depends on the type, characteristics and needs of the nominated property and its cultural and natural context. Management systems may vary according to different cultural perspectives, the resources available and other factors. They may incorporate traditional practices, existing urban or regional planning instruments, and other planning control mechanisms, both formal and informal. Impact assessments for proposed interventions are essential for all World Heritage properties.”
Theme: | 2.2.5.3 - Management systems |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 111
“In recognizing the diversity mentioned above, common elements of an effective management system could include:
a) a thorough shared understanding of the property, its universal, national and local values and its socio-ecological context by all stakeholders, including local communities and indigenous peoples;
b) a respect for diversity, equity, gender equality and human rights and the use of inclusive and participatory planning and stakeholder consultation processes;
c) a cycle of planning, implementation, monitoring, evaluation and feedback;
d) an assessment of the vulnerabilities of the property to social, economic, environmental and other pressures and changes, including disasters and climate change, as well as the monitoring of the impacts of trends and proposed interventions;
e) the development of mechanisms for the involvement and coordination of the various activities between different partners and stakeholders;
f) the allocation of necessary resources;
g) capacity building;
h) an accountable, transparent description of how the management system functions."
Theme: | 2.2.5.3 - Management systems |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 112
“Effective management involves a cycle of short, medium and long-term actions to protect, conserve and present the nominated property. An integrated approach to planning and management is essential to guide the evolution of properties over time and to ensure maintenance of all aspects of their Outstanding Universal Value. This approach goes beyond the property to include any buffer zone(s), as well as the broader setting. The broader setting may relate to the property’s topography, natural and built environment, and other elements such as infrastructure, land use patterns, spatial organization, and visual relationships. It may also include related social and cultural practices, economic processes and other intangible dimensions of heritage such as perceptions and associations. Management of the broader setting is related to its role in supporting the Outstanding Universal Value. Its effective management may also contribute to sustainable development, through harnessing the reciprocal benefits for heritage and society.”
Theme: | 2.2.5.3 - Management systems |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 117
“States Parties are responsible for implementing effective management activities for a World Heritage property. States Parties should do so in close collaboration with property managers, the agency with management authority and other partners, local communities and indigenous peoples, rights-holders and stakeholders in property management, by developing, when appropriate, equitable governance arrangements, collaborative management systems and redress mechanisms.”Theme: | 2.2.5.3 - Management systems |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 118
“The Committee recommends that States Parties include disaster, climate change and other risk preparedness as an element in their World Heritage site management plans and training strategies.”
Theme: | 2.2.5.3 - Management systems |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 119
“World Heritage properties may sustain biological and cultural diversity and provide ecosystem services and other benefits, which may contribute to environmental and cultural sustainability. Properties may support a variety of ongoing and proposed uses that are ecologically and culturally sustainable and which may enhance the quality of life and well-being of communities concerned. The State Party and its partners must ensure their use is equitable and fully respects the Outstanding Universal Value of the property. For some properties, human use would not be appropriate. Legislation, policies and strategies affecting World Heritage properties should ensure the protection of the Outstanding Universal Value, support the wider conservation of natural and cultural heritage, and promote and encourage the effective, inclusive and equitable participation of the communities, indigenous peoples and other stakeholders concerned with the property as necessary conditions to its sustainable protection, conservation, management and presentation.”
Theme: | 2.2.5.4 - Sustainable use |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Threats: | Changes in traditional ways of life and knowledge system Identity, social cohesion, changes in local population and community Impacts of tourism / visitor / recreation Indigenous hunting, gathering and collecting Ritual / spiritual / religious and associative uses Society's valuing of heritage |
Paragraph 163
“A minor modification is one which has not a significant impact on the extent of the property nor affects its Outstanding Universal Value.”
Theme: | 2.2.6.3 - Minor modifications to the boundaries |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 164
“If a State Party wishes to request a minor modification to the boundaries of a property already on the World Heritage List, it must be prepared in compliance with the format of Annex 11 and must be received by 1 February by the Committee through the Secretariat, which will seek the evaluation of the relevant Advisory Bodies on whether this can be considered a minor modification or not. The Secretariat shall then submit the Advisory Bodies’ evaluation to the World Heritage Committee. The Committee may approve such a modification, or it may consider that the modification to the boundary is sufficiently significant as to constitute a significant boundary modification of the property, in which case the procedure for new nominations will apply.”
Theme: | 2.2.6.3 - Minor modifications to the boundaries |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 122
In particular:
a) The Preliminary Assessment provides States Parties with an opportunity for enhanced dialogue with the Advisory Bodies, and it will help to establish the feasibility of a potential nomination and avoid the use of resources in the preparation of nominations that may be unlikely to succeed.
b) The Preliminary Assessment provides guidance on the potential of a site to justify Outstanding Universal Value, including integrity and/or authenticity, and, if information is provided, on the requirements for protection and management. The decision to prepare a full nomination dossier, regardless of the outcome of the Preliminary Assessment, will rest with the concerned State(s) Party(ies).
c) States Parties shall submit their Preliminary Assessment request to the World Heritage Centre according to the timetable set in paragraph 168, and using the standard format provided in Annex 3. The request shall be submitted in English or French, in paper and electronic formats (Word and/or PDF format) and in the required number of printed copies (same as for nomination dossiers): 2 identical copies for cultural and natural sites, and 3 identical copies for mixed sites and cultural landscapes.
d) On receipt of Preliminary Assessment requests from States Parties, the Secretariat will acknowledge receipt, check for completeness (in compliance with Annex 3) and register them. The Secretariat will forward, according to the timetable set in paragraph 168, complete Preliminary Assessment requests to the relevant Advisory Body(ies) for desk review. If necessary, the Advisory Body(ies) will request any additional information from the State(s) Party(ies), which should be submitted to the Secretariat. From the commencement of the Preliminary Assessment, the Advisory Body(ies) will initiate a dialogue with the concerned State(s) Party(ies) to establish a point of contact and agree on the process of exchange. States Parties are encouraged to appoint a technical focal point to ensure that dialogue is effective throughout the process, and to ensure that the conclusions of the Preliminary Assessment are communicated to the relevant stakeholders.
e) The Preliminary Assessment will be undertaken by ICOMOS and IUCN on a joint basis whenever relevant, and will be an independent desk review, which will include consultation with expert reviewers. No mission to the site will be undertaken (see Annex 6). Based on available information, the conclusions of the assessment will include an indication of whether the site may have potential to justify Outstanding Universal Value. If so, specific guidance and advice, in the form of recommendations, will be provided to assist the State(s) Party(ies) in the development of the nomination dossier. The Preliminary Assessment Report by the Advisory Bodies shall be provided to the State(s) Party(ies) via the Secretariat in one of the two working languages of the Convention.
f) The Preliminary Assessment Report by the Advisory Bodies is relevant for up to 5 years. A new Preliminary Assessment is required if a nomination is not submitted by 1 February on the fifth year following the transmission of the Report to the concerned State(s) Party(ies).
g) A State Party may withdraw a Preliminary Assessment request it has submitted, at any time. In such circumstances, any further consideration of a possible nomination will need to be subject to a new request for a Preliminary Assessment.
h) At each session of the World Heritage Committee, the Secretariat will provide a list of Preliminary Assessments requests received and those undertaken, but will not indicate the guidance given by the Advisory Bodies to the concerned State(s) Party(ies) in a completed Preliminary Assessment. However, once a nomination is submitted, the related Preliminary Assessment Report shall be annexed to it.
i) Both Upstream Process and Preliminary Assessment imply guidance at an early stage, prior to the preparation of a nomination, however they are different mechanisms. The Upstream Process is not mandatory. The Preliminary Assessment is a mandatory phase possibly allowing access to the preparation of a nomination dossier. Within an Upstream Process a visit to the site may be possible, while the Preliminary Assessment is carried out exclusively on the basis of a desk review. The Upstream Process may provide general advice, in relation to revision of a Tentative List, while the Preliminary Assessment is undertaken on a single site (whether serial or not) already included on a State Party’s Tentative List. While in general the costs of Upstream Process requests are borne by the requesting State(s) Party(ies), the costs of Preliminary Assessments, being part of the nomination process, are included in the related evaluation process (see also Paragraph 168bis). In terms of sequence, Upstream Process advice should precede the Preliminary Assessment."
Theme: | 2.4 - Upstream Process |
Source: | WHC.21/01 Operational Guidelines for the Implementation of the World Heritage Convention (WHC.21/01 2021) |
Theme: | 2.4 - Upstream Process |
Decision: | 41 COM 9A |
The World Heritage Policy Compendium was elaborated thanks to the generous contribution of the Government of Australia.
The World Heritage Policy Compendium On-line tool was developed thanks to the generous contribution of the Government of Korea.