Take advantage of the search to browse through the World Heritage Centre information.

Policy Compendium

Themes2.2.6.3 - Minor modifications to the boundariesclose2.2.5.3 - Management systemsclose2.7.4 - Cultural Landscapesclose2.2.3 - Authenticityclose2.2.2 - World Heritage criteriaclose2.4 - Upstream Processclose2.2 - Outstanding Universal Valueclose
Select source(s): 0
2 - Policies Regarding CREDIBILITY of the World Heritage List
2.2 - Outstanding Universal Value

Paragraph 79

“Properties nominated under criteria (i) to (vi) must meet the conditions of authenticity. Annex 4 which includes the Nara Document on Authenticity, provides a practical basis for examining the authenticity of such properties and is summarized below.”

Theme: 2.2.3 - Authenticity
Source: OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019)
2 - Policies Regarding CREDIBILITY of the World Heritage List
2.2 - Outstanding Universal Value

Paragraph 80

“The ability to understand the value attributed to the heritage depends on the degree to which information sources about this value may be understood as credible or truthful. Knowledge and understanding of these sources of information, in relation to original and subsequent characteristics of the cultural heritage, and their meaning as accumulated over time, are the requisite bases for assessing all aspects of authenticity.”

Theme: 2.2.3 - Authenticity
Source: OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019)
2 - Policies Regarding CREDIBILITY of the World Heritage List
2.2 - Outstanding Universal Value

Paragraph 81

“Judgments about value attributed to cultural heritage, as well as the credibility of related information sources, may differ from culture to culture, and even within the same culture. The respect due to all cultures requires that cultural heritage must be considered and judged primarily within the cultural contexts to which it belongs.”
Theme: 2.2.3 - Authenticity
Source: OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019)
2 - Policies Regarding CREDIBILITY of the World Heritage List
2.2 - Outstanding Universal Value

Paragraph 84

“The use of all these sources permits elaboration of the specific artistic, historic, social, and scientific dimensions of the cultural heritage being examined. "Information sources" are defined as all physical, written, oral, and figurative sources, which make it possible to know the nature, specificities, meaning, and history of the cultural heritage.”

Theme: 2.2.3 - Authenticity
Source: OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019)
2 - Policies Regarding CREDIBILITY of the World Heritage List
2.2 - Outstanding Universal Value

Paragraph 85

“When the conditions of authenticity are considered in preparing a nomination for a property, the State Party should first identify all of the applicable significant attributes of authenticity. The statement of authenticity should assess the degree to which authenticity is present in, or expressed by, each of these significant attributes.”
Theme: 2.2.3 - Authenticity
Source: OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019)
2 - Policies Regarding CREDIBILITY of the World Heritage List
2.2 - Outstanding Universal Value

Paragraph 86

“In relation to authenticity, the reconstruction of archaeological remains or historic buildings or districts is justifiable only in exceptional circumstances. Reconstruction is acceptable only on the basis of complete and detailed documentation and to no extent on conjecture.”
Theme: 2.2.3 - Authenticity
Source: OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019)
2 - Policies Regarding CREDIBILITY of the World Heritage List
2.2 - Outstanding Universal Value
(iv) "The authenticity of a cultural property remains an essential criterion."
Theme: 2.2.3 - Authenticity
Decision: 3 COM XI.35
2 - Policies Regarding CREDIBILITY of the World Heritage List
2.2 - Outstanding Universal Value
Synthesis based on relevant Committee decisions

The World Heritage Committee recommends paying particular attention to the conservation of authenticity and to inaccurate reconstructions and the risk of over-interpretation, with regard to restoration and development works, including architectural restorations and of technical historical reconstructions (based on Case law on decisions on Nominations).
Theme: 2.2.3 - Authenticity
See for examples Decisions:  37 COM 8B.41 38 COM 8B.34
2 - Policies Regarding CREDIBILITY of the World Heritage List
2.2 - Outstanding Universal Value
Synthesis based on relevant Committee decisions

The World Heritage Committee encourages the use of traditional materials and skills in restoration works and interventions (based on Case law on decisions on the State of Conservation).
Theme: 2.2.3 - Authenticity
See for examples Decisions:  34 COM 7B.53 38 COM 7B.52 40 COM 7B.41 41 COM 7B.46 43 COM 7A.33 43 COM 7B.76
2 - Policies Regarding CREDIBILITY of the World Heritage List
2.2 - Outstanding Universal Value
2.2.5 - Protection and management
Synthesis based on relevant Committee decisions

Synthesis based on relevant Committee decisions

The World Heritage Committee requests to ensure the management of a serial property as a unified whole, with an effective and explicit operational coordination between management plans existing for individual component parts of the site and the overall management plan for the property (based on case law on decisions on Nomination).
Theme: 2.2.5.3 - Management systems
See for examples Decisions:  40 COM 8B.16 43 COM 8B.38 44 COM 8B.25 44 COM 8B.15
2 - Policies Regarding CREDIBILITY of the World Heritage List
2.2 - Outstanding Universal Value
2.2.5 - Protection and management

Paragraph 108

“Each nominated property should have an appropriate management plan or other documented management system which must specify how the Outstanding Universal Value of a property should be preserved, preferably through participatory means.”

Theme: 2.2.5.3 - Management systems
Source: OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019)
2 - Policies Regarding CREDIBILITY of the World Heritage List
2.2 - Outstanding Universal Value
2.2.5 - Protection and management

Paragraph 109

“The purpose of a management system is to ensure the effective protection of the nominated property for present and future generations.”

Theme: 2.2.5.3 - Management systems
Source: OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019)
2 - Policies Regarding CREDIBILITY of the World Heritage List
2.2 - Outstanding Universal Value
2.2.5 - Protection and management

Paragraph 110

“An effective management system depends on the type, characteristics and needs of the nominated property and its cultural and natural context. Management systems may vary according to different cultural perspectives, the resources available and other factors. They may incorporate traditional practices, existing urban or regional planning instruments, and other planning control mechanisms, both formal and informal. Impact assessments for proposed interventions are essential for all World Heritage properties.”

Theme: 2.2.5.3 - Management systems
Source: OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019)
2 - Policies Regarding CREDIBILITY of the World Heritage List
2.2 - Outstanding Universal Value
2.2.5 - Protection and management

Paragraph 111

“In recognizing the diversity mentioned above, common elements of an effective management system could include:

a) a thorough shared understanding of the property, its universal, national and local values and its socio-ecological context by all stakeholders, including local communities and indigenous peoples;

b) a respect for diversity, equity, gender equality and human rights and the use of inclusive and participatory planning and stakeholder consultation processes;

c) a cycle of planning, implementation, monitoring, evaluation and feedback;

d) an assessment of the vulnerabilities of the property to social, economic, environmental and other pressures and changes, including disasters and climate change, as well as the monitoring of the impacts of trends and proposed interventions;

e) the development of mechanisms for the involvement and coordination of the various activities between different partners and stakeholders;

f) the allocation of necessary resources;

g) capacity building;

h) an accountable, transparent description of how the management system functions."

Theme: 2.2.5.3 - Management systems
Source: OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019)
2 - Policies Regarding CREDIBILITY of the World Heritage List
2.2 - Outstanding Universal Value
2.2.5 - Protection and management

Paragraph 112

“Effective management involves a cycle of short, medium and long-term actions to protect, conserve and present the nominated property. An integrated approach to planning and management is essential to guide the evolution of properties over time and to ensure maintenance of all aspects of their Outstanding Universal Value. This approach goes beyond the property to include any buffer zone(s), as well as the broader setting. The broader setting may relate to the property’s topography, natural and built environment, and other elements such as infrastructure, land use patterns, spatial organization, and visual relationships. It may also include related social and cultural practices, economic processes and other intangible dimensions of heritage such as perceptions and associations. Management of the broader setting is related to its role in supporting the Outstanding Universal Value. Its effective management may also contribute to sustainable development, through harnessing the reciprocal benefits for heritage and society.”

Theme: 2.2.5.3 - Management systems
Source: OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019)
2 - Policies Regarding CREDIBILITY of the World Heritage List
2.2 - Outstanding Universal Value
2.2.5 - Protection and management

Paragraph 117

“States Parties are responsible for implementing effective management activities for a World Heritage property. States Parties should do so in close collaboration with property managers, the agency with management authority and other partners, local communities and indigenous peoples, rights-holders and stakeholders in property management, by developing, when appropriate, equitable governance arrangements, collaborative management systems and redress mechanisms.”
Theme: 2.2.5.3 - Management systems
Source: OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019)
2 - Policies Regarding CREDIBILITY of the World Heritage List
2.2 - Outstanding Universal Value
2.2.5 - Protection and management

Paragraph 118

“The Committee recommends that States Parties include disaster, climate change and other risk preparedness as an element in their World Heritage site management plans and training strategies.”

Theme: 2.2.5.3 - Management systems
Source: OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019)
2 - Policies Regarding CREDIBILITY of the World Heritage List
2.2 - Outstanding Universal Value
2.2.6 - Boundaries and buffer zones

Paragraph 163

“A minor modification is one which has not a significant impact on the extent of the property nor affects its Outstanding Universal Value.”

Theme: 2.2.6.3 - Minor modifications to the boundaries
Source: OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019)
2 - Policies Regarding CREDIBILITY of the World Heritage List
2.2 - Outstanding Universal Value
2.2.6 - Boundaries and buffer zones

Paragraph 164

“If a State Party wishes to request a minor modification to the boundaries of a property already on the World Heritage List, it must be prepared in compliance with the format of Annex 11 and must be received by 1 February by the Committee through the Secretariat, which will seek the evaluation of the relevant Advisory Bodies on whether this can be considered a minor modification or not. The Secretariat shall then submit the Advisory Bodies’ evaluation to the World Heritage Committee. The Committee may approve such a modification, or it may consider that the modification to the boundary is sufficiently significant as to constitute a significant boundary modification of the property, in which case the procedure for new nominations will apply.”

Theme: 2.2.6.3 - Minor modifications to the boundaries
Source: OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019)
2 - Policies Regarding CREDIBILITY of the World Heritage List

Paragraph 122

"122. The Preliminary Assessment is a mandatory desk-based process for all sites that may be nominated to the World Heritage List and is undertaken following a request by the relevant State(s) Party(ies). Information included in the Preliminary Assessment request should build on the information provided in the Tentative List and also on any Upstream Process advice and/or Preparatory Assistance and its outcome must be provided at least one year before a full nomination dossier can be submitted by the State(s) Party(ies).

In particular:

a) The Preliminary Assessment provides States Parties with an opportunity for enhanced dialogue with the Advisory Bodies, and it will help to establish the feasibility of a potential nomination and avoid the use of resources in the preparation of nominations that may be unlikely to succeed. 

b) The Preliminary Assessment provides guidance on the potential of a site to justify Outstanding Universal Value, including integrity and/or authenticity, and, if information is provided, on the requirements for protection and management. The decision to prepare a full nomination dossier, regardless of the outcome of the Preliminary Assessment, will rest with the concerned State(s) Party(ies).

c) States Parties shall submit their Preliminary Assessment request to the World Heritage Centre according to the timetable set in paragraph 168, and using the standard format provided in Annex 3. The request shall be submitted in English or French, in paper and electronic formats (Word and/or PDF format) and in the required number of printed copies (same as for nomination dossiers): 2 identical copies for cultural and natural sites, and 3 identical copies for mixed sites and cultural landscapes.

d) On receipt of Preliminary Assessment requests from States Parties, the Secretariat will acknowledge receipt, check for completeness (in compliance with Annex 3) and register them. The Secretariat will forward, according to the timetable set in paragraph 168, complete Preliminary Assessment requests to the relevant Advisory Body(ies) for desk review. If necessary, the Advisory Body(ies) will request any additional information from the State(s) Party(ies), which should be submitted to the Secretariat. From the commencement of the Preliminary Assessment, the Advisory Body(ies) will initiate a dialogue with the concerned State(s) Party(ies) to establish a point of contact and agree on the process of exchange. States Parties are encouraged to appoint a technical focal point to ensure that dialogue is effective throughout the process, and to ensure that the conclusions of the Preliminary Assessment are communicated to the relevant stakeholders.

e) The Preliminary Assessment will be undertaken by ICOMOS and IUCN on a joint basis whenever relevant, and will be an independent desk review, which will include consultation with expert reviewers.  No mission to the site will be undertaken (see Annex 6). Based on available information, the conclusions of the assessment will include an indication of whether the site may have potential to justify Outstanding Universal Value. If so, specific guidance and advice, in the form of recommendations, will be provided to assist the State(s) Party(ies) in the development of the nomination dossier. The Preliminary Assessment Report by the Advisory Bodies shall be provided to the State(s) Party(ies) via the Secretariat in one of the two working languages of the Convention. 

f) The Preliminary Assessment Report by the Advisory Bodies is relevant for up to 5 years. A new Preliminary Assessment is required if a nomination is not submitted by 1 February on the fifth year following the transmission of the Report to the concerned State(s) Party(ies). 

g) A State Party may withdraw a Preliminary Assessment request it has submitted, at any time.  In such circumstances, any further consideration of a possible nomination will need to be subject to a new request for a Preliminary Assessment.

h) At each session of the World Heritage Committee, the Secretariat will provide a list of Preliminary Assessments requests received and those undertaken, but will not indicate the guidance given by the Advisory Bodies to the concerned State(s) Party(ies) in a completed Preliminary Assessment. However, once a nomination is submitted, the related Preliminary Assessment Report shall be annexed to it.

i) Both Upstream Process and Preliminary Assessment imply guidance at an early stage, prior to the preparation of a nomination, however they are different mechanisms. The Upstream Process is not mandatory. The Preliminary Assessment is a mandatory phase possibly allowing access to the preparation of a nomination dossier. Within an Upstream Process a visit to the site may be possible, while the Preliminary Assessment is carried out exclusively on the basis of a desk review.  The Upstream Process may provide general advice, in relation to revision of a Tentative List, while the Preliminary Assessment is undertaken on a single site (whether serial or not) already included on a State Party’s Tentative List. While in general the costs of Upstream Process requests are borne by the requesting State(s) Party(ies), the costs of Preliminary Assessments, being part of the nomination process, are included in the related evaluation process (see also Paragraph 168bis). In terms of sequence, Upstream Process advice should precede the Preliminary Assessment."
Theme: 2.4 - Upstream Process
Source: WHC.21/01 Operational Guidelines for the Implementation of the World Heritage Convention (WHC.21/01 2021)

The World Heritage Policy Compendium was elaborated thanks to the generous contribution of the Government of Australia.

The World Heritage Policy Compendium On-line tool was developed thanks to the generous contribution of the Government of Korea.


With the Support of

top