Policy Compendium
Paragraph 98
“Legislative and regulatory measures at national and local levels should assure the protection of the property from social, economic and other pressures or changes that might negatively impact the Outstanding Universal Value, including the integrity and/or authenticity of the property. States Parties should also assure the full and effective implementation of such measures.”Theme: | 2.2.5.2 - Legislative, regulatory and contractual measures for protection |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 163
“A minor modification is one which has not a significant impact on the extent of the property nor affects its Outstanding Universal Value.”
Theme: | 2.2.6.3 - Minor modifications to the boundaries |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 164
“If a State Party wishes to request a minor modification to the boundaries of a property already on the World Heritage List, it must be prepared in compliance with the format of Annex 11 and must be received by 1 February by the Committee through the Secretariat, which will seek the evaluation of the relevant Advisory Bodies on whether this can be considered a minor modification or not. The Secretariat shall then submit the Advisory Bodies’ evaluation to the World Heritage Committee. The Committee may approve such a modification, or it may consider that the modification to the boundary is sufficiently significant as to constitute a significant boundary modification of the property, in which case the procedure for new nominations will apply.”
Theme: | 2.2.6.3 - Minor modifications to the boundaries |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 165
“If a State Party wishes to significantly modify the boundary of a property already on the World Heritage List, the State Party shall submit this proposal as if it were a new nomination (including the requirement to be previously included on the Tentative List – see paragraph 63 and 65). This re-nomination shall be presented by 1 February and will be evaluated in the full year and a half cycle of evaluation according to the procedures and timetable outlined in paragraph 168. This provision applies to extensions, as well as reductions.”Theme: | 2.2.6.4 - Significant modifications to the boundaries |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 132
3. Justification for Inscription
“[For a nomination to be considered as “complete”, the following requirements (see format in Annex 5) are to be met:] (…) In section 3.2, a comparative analysis of the nominated property in relation to similar properties, whether or not on the World Heritage List, both at the national and international levels, shall be provided. The comparative analysis shall explain the importance of the nominated property in its national and international context."
Theme: | 2.6 - Comparative studies |
Source: | WHC.21/01 Operational Guidelines for the Implementation of the World Heritage Convention (WHC.21/01 2021) |
The World Heritage Policy Compendium was elaborated thanks to the generous contribution of the Government of Australia.
The World Heritage Policy Compendium On-line tool was developed thanks to the generous contribution of the Government of Korea.