Paragraph 96
“Protection and management of World Heritage properties should ensure that their Outstanding Universal Value, including the conditions of integrity and/or authenticity at the time of inscription, are sustained or enhanced over time. A regular review of the general state of conservation of properties, and thus also their Outstanding Universal Value, shall be done within a framework of monitoring processes for World Heritage properties, as specified within the Operational Guidelines.”Theme: | 2.2.5.1 - General |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 97
“All properties inscribed on the World Heritage List must have adequate long-term legislative, regulatory, institutional and/or traditional protection and management to ensure their safeguarding. This protection should include adequately delineated boundaries. Similarly States Parties should demonstrate adequate protection at the national, regional, municipal, and/or traditional level for the nominated property. They should append appropriate texts to the nomination with a clear explanation of the way this protection operates to protect the property.”Theme: | 2.2.5.1 - General |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 163
“A minor modification is one which has not a significant impact on the extent of the property nor affects its Outstanding Universal Value.”
Theme: | 2.2.6.3 - Minor modifications to the boundaries |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 164
“If a State Party wishes to request a minor modification to the boundaries of a property already on the World Heritage List, it must be prepared in compliance with the format of Annex 11 and must be received by 1 February by the Committee through the Secretariat, which will seek the evaluation of the relevant Advisory Bodies on whether this can be considered a minor modification or not. The Secretariat shall then submit the Advisory Bodies’ evaluation to the World Heritage Committee. The Committee may approve such a modification, or it may consider that the modification to the boundary is sufficiently significant as to constitute a significant boundary modification of the property, in which case the procedure for new nominations will apply.”
Theme: | 2.2.6.3 - Minor modifications to the boundaries |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 165
“If a State Party wishes to significantly modify the boundary of a property already on the World Heritage List, the State Party shall submit this proposal as if it were a new nomination (including the requirement to be previously included on the Tentative List – see paragraph 63 and 65). This re-nomination shall be presented by 1 February and will be evaluated in the full year and a half cycle of evaluation according to the procedures and timetable outlined in paragraph 168. This provision applies to extensions, as well as reductions.”Theme: | 2.2.6.4 - Significant modifications to the boundaries |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 137
“Serial properties will include two or more component parts related by clearly defined links:
a) Component parts should reflect cultural, social or functional links over time that provide, where relevant, landscape, ecological, evolutionary or habitat connectivity.
b) Each component part should contribute to the Outstanding Universal Value of the property as a whole in a substantial, scientific, readily defined and discernible way, and may include, inter alia, intangible attributes. The resulting Outstanding Universal Value should be easily understood and communicated.
c) Consistently, and in order to avoid an excessive fragmentation of component parts, the process of nomination of the property, including the selection of the component parts, should take fully into account the overall manageability and coherence of the property (see paragraph 114).
and provided it is the series as a whole – and not necessarily the individual parts of it – which are of Outstanding Universal Value.”
Theme: | 2.7.3 - Serial properties |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 138
“A serial nominated property may occur:
a) on the territory of a single State Party (serial national property); or
b) within the territory of different States Parties, which need not be contiguous and is nominated with the consent of all States Parties concerned (serial transnational property).”
Theme: | 2.7.3 - Serial properties |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |
Paragraph 139
“Serial nominations, whether from one State Party or multiple States, may be submitted for evaluation over several nomination cycles, provided that the first property nominated is of Outstanding Universal Value in its own right. States Parties planning serial nominations phased over several nomination cycles are encouraged to inform the Committee of their intention in order to ensure better planning.”
Theme: | 2.7.3 - Serial properties |
Source: | OG Operational Guidelines for the Implementation of the World Heritage Convention (WHC.19/01 - 10 July 2019) |