State of Conservation
6
Reports
1
Properties concerned
1
States Parties with SOC reports
Property:
Serengeti National Parkclose
Date Start:
2014close
States Parties: | United Republic of Tanzania |
Year: | 2024 |
Document Source: | WHC/24/46.COM/7B.Add.3 |
Threats*: | Air transport infrastructure Ground transport infrastructure Illegal activities Major linear utilities Major visitor accommodation and associated infrastructure Surface water pollution Water infrastructure |
States Parties: | United Republic of Tanzania |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B.Add |
Threats*: | Air transport infrastructure Drought Ground transport infrastructure Illegal activities Major linear utilities Water (extraction) Water infrastructure |
States Parties: | United Republic of Tanzania |
Year: |
2021
Initialy proposed for examination in 2020
|
Document Source: | WHC/21/44.COM/7B |
Threats*: | Air transport infrastructure Drought Ground transport infrastructure Illegal activities Major linear utilities Water (extraction) Water infrastructure |
States Parties: | United Republic of Tanzania |
Year: | 2018 |
Document Source: | WHC/18/42.COM/7B |
Threats*: | Air transport infrastructure Drought Ground transport infrastructure Illegal activities Major linear utilities Water (extraction) Water infrastructure |
States Parties: | United Republic of Tanzania |
Year: | 2016 |
Document Source: | WHC/16/40.COM/7B |
Threats*: | Air transport infrastructure Drought Ground transport infrastructure Illegal activities Major linear utilities Water (extraction) Water infrastructure |
States Parties: | United Republic of Tanzania |
Year: | 2014 |
Document Source: | WHC-14/38.COM/7B |
Threats*: | Air transport infrastructure Drought Ground transport infrastructure Illegal activities Major linear utilities Water (extraction) Water infrastructure |
States Parties
United Republic of Tanzania
* :
The threats indicated are listed in alphabetical order; their order does not constitute a classification according to the importance of their impact on the property.
Furthermore, they are presented irrespective of the type of threat faced by the property, i.e. with specific and proven imminent danger (“ascertained danger”) or with threats which could have deleterious effects on the property’s Outstanding Universal Value (“potential danger”).
** : All mission reports are not always available electronically.