State of Conservation
45
Reports
45
Properties concerned
14
States Parties with SOC reports
Date Start:
2023close
Date end:2023close
Region:
Arab Statesclose
States Parties: | Egypt |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7A |
Threats*: | Housing Management activities Management systems/ management plan Water (rain/water table) |
Other Threats: | Encroachments within the property and inappropriate recent constructions; Lack of engagement with local communities and other stakeholders |
Danger List: | Yes |
States Parties: | Syrian Arab Republic |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7A.Add |
Threats*: | Changes in traditional ways of life and knowledge system Housing Legal framework Management systems/ management plan War |
Danger List: | Yes |
States Parties: | Syrian Arab Republic |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7A.Add |
Threats*: | Housing Illegal activities War |
Danger List: | Yes |
States Parties: | Syrian Arab Republic |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7A.Add |
Threats*: | Changes in traditional ways of life and knowledge system Housing Management activities Management systems/ management plan Society's valuing of heritage War |
Other Threats: | fire |
Danger List: | Yes |
States Parties: | Egypt |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B |
Threats*: | Changes in traditional ways of life and knowledge system Deliberate destruction of heritage Flooding Housing Human resources Impacts of tourism / visitor / recreation Management activities Management systems/ management plan Water (rain/water table) |
Other Threats: | Natural decay and structural problems Major infrastructure and development projects Uncontrolled urban development |
States Parties: | Syrian Arab Republic |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7A.Add |
Threats*: | Deliberate destruction of heritage Financial resources Housing Human resources Illegal activities Land conversion Legal framework Management systems/ management plan Military training Quarrying War |
Danger List: | Yes |
States Parties: | Tunisia |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B |
Threats*: | Housing Legal framework Management systems/ management plan |
States Parties: | Libya |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7A.Add |
Threats*: | Crop production Deliberate destruction of heritage Fire (widlfires) Governance Housing Interpretative and visitation facilities Livestock farming / grazing of domesticated animals Management activities Management systems/ management plan Surface water pollution War |
Danger List: | Yes |
States Parties: | Libya |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7A.Add |
Threats*: | Desertification Illegal activities War |
Other Threats: | Deterioration of the stone masonry; Sand covering certain areas of the property; Graffiti and fires |
Danger List: | Yes |
States Parties: | Libya |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7A |
Threats*: | Housing Invasive/alien terrestrial species Land conversion Relative humidity War |
Other Threats: | Excessive vegetation growth; Impact of humidity and seawater salt on stone masonry |
Danger List: | Yes |
States Parties: | Iraq |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7A |
Threats*: | Deliberate destruction of heritage Flooding Management activities Management systems/ management plan War Water infrastructure |
Other Threats: | Fragile mud brick structures |
Danger List: | Yes |
States Parties: | Iraq |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B |
Threats*: | Interpretative and visitation facilities Management systems/ management plan |
States Parties: | Mauritania |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7B |
Threats*: | Effects arising from use of transportation infrastructure Fishing/collecting aquatic resources Ground transport infrastructure Housing Illegal activities Impacts of tourism / visitor / recreation Localised utilities Management systems/ management plan Mining Oil and gas Renewable energy facilities |
States Parties: | Jordan |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B.Add.2 |
Threats*: | Management systems/ management plan |
Other Threats: | Buildings and Development (lack of design and construction guidelines) Preservation of important vistas and sightlines of the property |
States Parties: | Lebanon |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B |
Threats*: | Erosion and siltation/ deposition Housing Management systems/ management plan |
States Parties: | Syrian Arab Republic |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7A.Add |
Threats*: | Housing Impacts of tourism / visitor / recreation Management activities Management systems/ management plan Quarrying War |
Danger List: | Yes |
States Parties: | Sudan |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7B.Add |
Threats*: | Desertification Flooding Ground transport infrastructure Housing Land conversion Major visitor accommodation and associated infrastructure Management systems/ management plan Wind |
States Parties: | Iraq |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7A.Add.2 |
Threats*: | Deliberate destruction of heritage Illegal activities War |
Other Threats: | Major looting of Iraqi archaeological sites |
Danger List: | Yes |
States Parties: | State of Palestine |
Year: |
2023
Initialy proposed for examination in 2022
|
Document Source: | WHC/23/45.COM/7A.Add.4 |
Threats*: | Management systems/ management plan |
Other Threats: | Absence of Statement of Outstanding Universal Value at the time of inscription |
Danger List: | Yes |
States Parties: | Saudi Arabia |
Year: | 2023 |
Document Source: | WHC/23/45.COM/7B |
Threats*: | Major visitor accommodation and associated infrastructure Management activities |
States Parties
Algeria Egypt Iraq Jordan Lebanon Libya Mauritania Morocco Saudi Arabia State of Palestine Sudan Syrian Arab Republic Tunisia YemenThreats
Management systems/ management plan 33 Housing 26 War 16 Management activities 10 Land conversion 8 Impacts of tourism / visitor / recreation 8 Deliberate destruction of heritage 8 Illegal activities 8 Human resources 8 Financial resources 7 Legal framework 7 Major visitor accommodation and associated infrastructure 6 Ground transport infrastructure 6 Water (rain/water table) 6 Changes in traditional ways of life and knowledge system 6 Governance 5 Interpretative and visitation facilities 4 Identity, social cohesion, changes in local population and community 4 Flooding 4 Effects arising from use of transportation infrastructure 3 Solid waste 3 Livestock farming / grazing of domesticated animals 3 Civil unrest 3 Desertification 3 Erosion and siltation/ deposition 3 Commercial development 2 Localised utilities 2 Fishing/collecting aquatic resources 2 Quarrying 2 Relative humidity 2 Invasive/alien terrestrial species 2 Underground transport infrastructure 1 Major linear utilities 1 Renewable energy facilities 1 Water infrastructure 1 Surface water pollution 1 Crop production 1 Mining 1 Oil and gas 1 Wind 1 Society's valuing of heritage 1 Military training 1 Storms 1 Fire (widlfires) 1 Invasive / alien marine species 1 High impact research / monitoring activities 1
* :
The threats indicated are listed in alphabetical order; their order does not constitute a classification according to the importance of their impact on the property.
Furthermore, they are presented irrespective of the type of threat faced by the property, i.e. with specific and proven imminent danger (“ascertained danger”) or with threats which could have deleterious effects on the property’s Outstanding Universal Value (“potential danger”).
** : All mission reports are not always available electronically.