Rock Carvings in Tanum

Sweden
Factors affecting the property in 1998*
  • Ground transport infrastructure
International Assistance: requests for the property until 1998
Requests approved: 0
Total amount approved : 0 USD
Missions to the property until 1998**

September 1998: joint World Heritage Centre / ICOMOS mission

Conservation issues presented to the World Heritage Committee in 1998

At the invitation of the Director of Monuments and Sites of the County Administration of ICOMOS and the World Heritage Centre, undertook a mission to Tanum in September 1998 to discuss the E6 road upgrading project, funded by the European Union.

The current E6 passes through the central-eastern part of the World Heritage site. The Swedish Road Administration presented various options for the location of the E6. Three of the possible road corridors would to a large extent pass through the World Heritage site. These suggestions were considered unacceptable by the mission team. However, it was felt that one alternative solution, developed during the mission, although passing into the World Heritage site, would have a minimum impact on the continuity of the landscape of the World Heritage site and would not affect the rock carving sites as such.

As to options that would not touch the World Heritage site, it was recognized that the impact of the so-called Green Route on the natural and scenic values of the area to the east of the World Heritage site would be such as to render it unacceptable. However, requested that further in-depth studies be carried out on the so-called Blue Route (to the west of the World Heritage site, near the coast), which would be the optimum solution since it would avoid any incursion into the World Heritage site.

Decisions adopted by the Committee in 1998
22 COM VII.41
SOC: The Rock Carvings in Tanum (Sweden)

VII.41 The Rock Carvings in Tanum (Sweden)

At the invitation of the Director of Monuments and Sites of the County Administration of Västra Götaland, ICOMOS and the World Heritage Centre undertook a mission to Tanum in September 1998 to discuss the E6 road upgrading project, funded by the European Union.

The mission examined various options for the road and expressed preference for alternatives that would avoid the World Heritage site. However, it was felt that one alternative solution, developed during the mission, although passing into the World Heritage site, would have a minimum impact on the continuity of the landscape of the World Heritage site and would not affect the rock carving sites as such.

The Committee expressed its appreciation of the fact that it was consulted on this project at such an early stage of its implementation. It recommended this consultation as a desirable precedent to other States Parties. Furthermore, it requested the State Party to study further the possibility of utilizing the Blue Route, passing to the west of the World Heritage site. In the event that this had to be precluded for engineering, social, and/or financial reasons, the Committee requested the State Party to carry out further study on the alternative route through the World Heritage site as developed during the mission.

The Committee requested the State Party to present a progress report on the E6 project, by 15 April 1999, to be examined by the Bureau at its twenty-third session.

The Bureau recommended the Committee to adopt the following:

“The Committee expresses its appreciation of the fact that it was consulted on this project at such an early stage of its implementation. It recommends this consultation as a desirable precedent to other States Parties. Furthermore, it requests the State Party to study further the possibility of utilizing the Blue Route, passing to the west of the World Heritage site. In the event that this had to be precluded for engineering, social, and/or financial reasons, the Committee requests the State Party to carry out further study on the alternative route through the World Heritage site as developed during the mission.

The Committee requests the State Party to present a progress report on the E6 project, by 15 April 1999, to be examined by the Bureau at its twenty-third session.”

Report year: 1998
Sweden
Date of Inscription: 1994
Category: Cultural
Criteria: (i)(iii)(iv)
Documents examined by the Committee
arrow_circle_right 22COM (1998)
Exports

* : The threats indicated are listed in alphabetical order; their order does not constitute a classification according to the importance of their impact on the property.
Furthermore, they are presented irrespective of the type of threat faced by the property, i.e. with specific and proven imminent danger (“ascertained danger”) or with threats which could have deleterious effects on the property’s Outstanding Universal Value (“potential danger”).

** : All mission reports are not always available electronically.