19741.
Spain,High-rise development in the vicinity of the property.,On 28 January 2010, the State Party submitted a report on the state of conservation of the property. This addressed the requests of the World Heritage Committee at its 33rd session (Seville, 2009) to undertake a comprehensive impact assessment of the proposed development of the Torre Cajasol on the Outstanding ...
19742.
Ukraine,a) New constructions within the historic centre;
b) Lack of valid detailed planning documents;
c) Inadequate infrastructure including the sewage system,On 1 February 2010, a state of conservation report was submitted by the State Party. The report did not address directly the issues outlined in Decision 33 COM 7B.126 adopted by the World Heritage Committee at its ...
19743.
Chile,a) Extremely fragile nature of the industrial buildings that were constructed using local materials such as timber for frames, corrugated iron sheets for roofs and some walls, in addition to stucco and lightweight construction;
b) Lack of maintenance over the past 40 years as well as vandalism at the property;
c) Corrosion of metal cladding and dismantlement of some ...
19744.
Egypt,
Earthquake in 1992 (issue resolved);
Inappropriate reconstruction works (issue resolved);
Rise of the underground water level;
Dilapidated infrastructure;
Neglect and lack of maintenance;
Overcrowded areas and buildings;
Uncontrolled development;
Absence of a comprehensive Urban Conservation Plan;
Absence of an integrated socio-economic revitalization plan linking ...
19745.
Morocco,a) Partial abandonment of the property;
b) Gully erosion;
c) Rock falls due to erosion;
d) Increased offences in old Ksar and degradation;
e) Delays in the establishment of a technical and administrative structure responsible for the property;
f) Uncontrolled tourism and visitor pressure.,During its 31st session (Christchurch, 2007), the World Heritage Committee ...
19746.
China,,The World Heritage Committee, in its Decision 32 COM 7B.68, focussed on two principal conservation issues.
a) Negative Impacts of Urban Development near buffer zones
It noted with concern that that urban development around the property’s buffer zones, especially around the Guia Hill and Lighthouse and the Monte Fortress (Mount Fort), might impact negatively ...
19747.
Pakistan,a) Significant decay of the property caused by local climatic conditions and alluvial erosion;
b) Stability of the foundations (earth mechanics) of the Jam Nizamuddin tomb;
c) Lack of definition of boundaries of the property and buffer zone of the necropolis;
d) Lack of monitoring.,The property was listed on the 100 Most Endangered Sites of the World Monuments ...
19748.
Bosnia and Herzegovina,a) Construction of a hotel in the buffer zone of the World Heritage property, not in conformity with provisions of the Master Plan, which was part of the management plan included in the nomination file
b) Cracks appearing on the surface of the bridge,At is 32nd session (Quebec City, 2008), the World Heritage Committee urged the State Party to ...
19749.
Kenya,a) Lack of management plan;
b) Lack of risk preparedness, especially in the case of fire;
c) Sewerage situation;
d) Lack of resources.,On 27 February 2008, the State Party provided to the World Heritage Centre a progress report on the implementation of the Decision adopted by the World Heritage Committee at its 31st session (Christchurch, 2007).
Management plan
In ...
19750.
Montenegro,a) Earthquake damage;
b) Lack of management planning;
c) Urban development and urban pressure. ,The State Party submitted a progress report to the World Heritage Centre dated 1 February 2008.
The joint World Heritage Centre / ICOMOS reactive monitoring mission was carried out from 18 to 21 February 2008 to review the proposed bridge construction of the ...
19751.
Brazil,a) Proposed development of hydropower dams;
b) Pressure to re-open illegal road;
c) Illegal logging and hunting;
d) Uncoordinated developments;
e) Lack of transboundary cooperation;
f) Lack of sustainable financing.,As requested in decision 30 COM 7B.31, the State Party of Brazil provided on 1 December 2006 an official report on the proposed hydroelectric dam ...
19752.
Democratic Republic of the Congo,a) Armed conflict and political instability;
b) Poaching by military and armed groups;
c) Conflicts with local communities on the boundaries of the Park;
d) Impact of villages included in the Park.,On 30 January 2006, an updated report on the state of conservation of the five DRC World Heritage properties was submitted by the State Party, ...
19753.
India,
Forced evacuation of Park staff
Poaching and logging
Illegal cultivation
Slow release of funds
Invasive species
Uncontrolled infrastructure development by local tourism groups
Attempts by paramilitary group to set up base camps in the property
,On 28 January 2015, the State Party submitted a state of conservation report, which is available at ...
19754.
Chile,
Insufficient delimitation of boundaries
Construction of a shopping mall in the vicinity of the Castro Church
,On 9 February 2015, the State Party submitted a state of conservation report, a summary of which is available at https://whc.unesco.org/en/list/971/documents/. Implementation of actions is reported as follows:
The legal text establishing the new Ministry ...
19755.
State of Palestine,
Degradation of the architectural complex of the Church of the Nativity
Development pressure
Tourism pressure
Housing
Impacts of tourism / visitor / recreation
Management activities
Management systems/ management plan
Water (rain/water table)
,On 28 January 2016, the State Party submitted a state of conservation report, which is available at ...
19756.
Costa Rica,Panama,
Construction of hydroelectric dams near the property in Panama and associated effects (greater human presence near the property, interruption of aquatic species migratory corridor)
Encroachment (settlements, cattle ranching)
Planned road construction, which would traverse the property on the side of Panama
,On 3 February 2016, a joint report on the state ...
19757.
Sudan,
Deterioration as a result of exposure to difficult environmental conditions such as wind with sand and floods
Urban encroachment
Absence of a management plan with government commitment
Flooding
Ground transport infrastructure
Housing
Major visitor accommodation and associated infrastructure
Management systems / management plan
Wind and Desertification
,On 29 ...
19758.
United States of America,
Water infrastructure (Quantity and quality of water entering the property)
Housing (Urban encroachment)
Surface water pollution and Pollution of marine waters (Agricultural fertilizer pollution, Mercury contamination of fish and wildlife)
Water infrastructure (Lowered water levels due to flood control measures)
Storms (Damage from ...
19759.
Senegal,
Poaching, capture and relocation of wildlife
Drying up of ponds and invasive species
Illegal logging
Livestock grazing
Road construction project
Potential dam construction
Potential mining exploration and exploitation
Loss of chimpanzee habitat
,On 31 January 2019, the State Party submitted a state of conservation report on the property, available at ...
19760.
Peru,
Identity, social cohesion, changes in local population and community
Illegal activities
Management systems/management plan
Water (rain/water table)
Continuous deterioration of earthen architecture structures and decorated surfaces from lack of conservation and maintenance practices
Illegal occupation of the property
Unregulated farming activities
Rising water table ...
19761.
Indonesia,
Mining
Human resources (Security limitations)
Ground transport infrastructure (Development threats)
Fishing/collecting aquatic resources (Exploitation of marine resources)
Management systems/management plans (Absence of a co-ordinating agency, Absence of a finalized strategic management plan, Park boundaries not physically demarcated)
Financial resources ...
19762.
Russian Federation,
Management systems/ management plan (Lack of Management Plan)
Legal framework (Weakening of conservation controls and laws)
Impacts of tourism / visitor / recreation (Impacts of proposed tourism infrastructure development)
Ground transport infrastructure (Road construction)
Illegal activities (Deforestation)
,On 21 September 2018, the State Party sent a ...
19763.
Côte d'Ivoire,
Conflict and political instability (issue resolved)
Lack of management control and of the accesses to the property
Poaching
Encroachment: human occupation and agricultural pressure
Bush fires
Illegal gold panning
,On 26 November 2018, the State Party submitted a state of conservation report on the property, available at ...
19764.
Algeria,
Natural degradation caused by littoral erosion, marine salt and vegetation covering part of the inscribed sectors
Deterioration of the remains due to vandalism, theft and uncontrolled visitation causing accumulation of rubbish
Urbanisation on the outskirts of the property where, in the absence of a defined buffer zone, illegal construction provokes land ...
19765.
Sri Lanka,
Newly (in 1999) constructed temple, alien to the World Heritage complex (issue resolved)
Changes in traditional ways of life and knowledge system
Impacts of tourism / visitors / recreation
Ritual / spiritual / religious and associative uses
Continued deterioration of the paintings
Impact of water ingress, insect activity and other natural forces
Management ...
19766.
Austria,
Water infrastructure (hydroelectric power station Salzburg-Lehen) (issue resolved)
Ground transport infrastructure (train station project outside the buffer zone) (issue resolved)
Housing (urban development pressure, high-rise projects)
Management systems/ management plan (integrated approach towards management; apparent lack of legislative and planning ...
19767.
United Kingdom of Great Britain and Northern Ireland,
Resumption of mining activities
Inappropriate developments (particularly a new supermarket built at Hayle Harbour)
Potential impact of new development projects
Management and institutional factors / Improvements to the planning tools and approval processes not yet completed and implemented
Social/cultural uses of ...
19768.
Chile,
Emergency situation due to the massive fire of April 2014 (issue resolved)
Interventions planned at the port, such as the Barón Port and the Prat Dock, as well as for touristic facilities and real estate projects
Fragmentation of competencies and mandates by sectors and by different levels of government, as well as by the different types of specific protection and ...
19769.
South Africa,
Ground water pollution
Mining
Surface water pollution
Water (rain/water table)
Climate change and severe weather events
Acid mine drainage
,On 30 November 2018, the State Party submitted a report on the state of conservation, which is available at http://whc.unesco.org/en/list/915/documents/, and reports specifically on the state of conservation of the ...
19770.
Ghana,
Erosion (issue resolved in 1998 but significant again in 2019)
Housing (issue resolved in 1998 but significant again in 2019)
Management systems/ management plan (issue resolved in 1998 but significant again in 2019)
Heavy rain (issue resolved in 1998 but significant again in 2019)
Wind (issue resolved in 1998 but significant again in 2019)
Salt-laden atmosphere ...
19771.
Libya,
Vandalism
Deliberate destruction of heritage
Human Resources
Conflict situation prevailing in the country
Illegal activities
,On 6 February 2020, the State Party submitted a state of conservation report; an updated version of which was submitted on 11 February 2021. Executive summaries of both reports are available at http://whc.unesco.org/en/list/287/documents/. ...
19772.
Nigeria,
Damage to the Hidi Palace, the Palace Square, the Black Smith Homestead, paved walkways and ritual structures by insurgents
Civil unrest
Illegal activities
,On 7 September 2019, the State Party submitted a state of conservation report, and additional updated information was provided on 16 March 2020, which is available at ...
19773.
China,
Legal framework (Need to put all 38 rock art sites under the highest protection level)
Management activities (Lack of a conservation/consolidation programme for all the rock art sites; lack of monitoring systems, including a risk preparedness strategy addressing the risk of forest fire)
Forestry / Wood production (Firewood collection)
Surface water pollution (Use of ...
19774.
Costa Rica,
Governance
Interpretative and visitation facilities (provide visitor interpretation and future accessibility to components not yet open to the public)
Human resources (guardians and managers)
Housing (future urban development)
Water infrastructure (discussion on the construction of a hydropower dam)
Air transport infrastructure
Financial resources
Management ...
19775.
Bulgaria,
Commercial development (developments in the Bansko ski zone)
Management systems/ management plan (lack of effective management mechanisms)
Management and institutional factors (boundary issues)
Illegal activities (illegal logging)
,On 26 November 2019, the State Party submitted a report on the state of conservation of the property, available at ...
19776.
Russian Federation,Factors identified at the time of the significant boundary modification:
Incomplete process of configuration and designation of the property’s buffer zone
Need to finalize the Integrated Management Plan for the extension
,On 10 February 2020, the State Party submitted a report on the state of conservation of the property, available at ...
19777.
Panama,
Livestock farming / grazing of domesticated animals
Management systems/ management plan (delayed implementation of the Management Plan)
Marine transport infrastructure (planned construction of a naval base)
Legal framework (absence of clear regulations)
Fishing/collecting aquatic resources
Human resources (insufficient management capacity)
Impacts of tourism / ...
19778.
Australia,
Ground transport infrastructure (proposed cableway) (issue resolved)
,Following significant bushfires that affected the property, the World Heritage Centre sent a letter to the State Party on 23 November 2019, requesting information on this matter. The State Party responded on 6 December 2019, noting that bushfires were still burning in several components of the ...
19779.
Japan,
Water infrastructure (River engineering, in particular dams, impeding or restricting fish migration, including major runs of salmonids)
Aquaculture (Management of commercial fisheries, including coordination and cooperation with neighbouring States Parties)
Hyper-abundant species (Excessive population density of Sika Deer affecting forest regeneration and vegetation ...
19780.
Algeria,
Deliberate destruction of heritage: Deterioration of the remains due to vandalism, theft and uncontrolled visitation causing accumulation of rubbish
Erosion and siltation/ deposition: Natural degradation caused by littoral erosion, marine salt, rainwater runoff and vegetation covering part of the inscribed sectors
Housing
Human resources: Lack of capacities for ...
19781.
Morocco,
Housing
Major urban projects for the city and for the Bouregreg Valley and the lack of impact assessments in order to guarantee the visual integrity of the property and its surrounding areas
,On 2 June 2020, the State Party submitted a state of conservation report and other documents in response to the Committee Decision adopted at its 43rd session (Baku, 2019). ...
19782.
Portugal,Factors identified at the time of inscription of the property:
Legal framework (classify the whole site as a National Monument)
Management System/Management Plan (improve the documentation, update and supplement the Management Plan, improve the Action Plan, visitor management, improve institutional links between stakeholders)
Low impact research/monitoring ...
19783.
Brazil,
Housing (urban pressure that may affect the original city plan (Plano Piloto) that warranted inscription on the World Heritage List)
Management systems/ management plan (lack of a Master Plan)
,On 30 November 2020, the State Party presented a state of conservation report, which is available at http://whc.unesco.org/en/list/445/documents/, and responds in part to ...
19784.
Cambodia,
Uncontrolled urban expansion;
Lack of an appropriate management system;
Lack of clarity regarding property rights, ownership and building codes;
Poor law enforcement;
Lack of capacity of management agency.
,Since November 2020, the World Heritage Centre received communications through media and civil society groups concerning the proposed construction of a ...
19785.
Saudi Arabia,
Detailed Conservation Strategy not finalized
High rate of decay of the historic houses
Housing
Management systems/ management plan: Management system not in place
Need for a risk management and prevention plan
Projects and development work with the potential to impact the authenticity of the property
,On 16 November 2022, the State Party submitted a report on ...
19786.
Germany,a) Noise pollution and traffic increase;
b) Potential impacts by Rhine crossing project.,The State Party submitted on 19 January 2010 an English version of the Environmental Impact Assessment (EIA), and on 8 February 2010 a report that included a draft Statement of Outstanding Universal Value, a Visual Impact Assessment undertaken by the Technical University of ...
19787.
Russian Federation,a) Lack of management plan ;
b) Weakening of conservation controls and laws;
c) Impacts of proposed tourism infrastructure development for Olympic Games;
d) Road construction;
e) Deforestation. ,The state of conservation report was requested by the Committee at its 32nd session (Quebec City, 2008) in relation to the above threats and in particular ...
19788.
Viet Nam,a) Development of the road infrastructure and modern constructions in and around the Citadel;
b) Urban infrastructure of Hué and its surroundings. ,A joint World Heritage Centre/ICOMOS mission visited the property in October 2006. With respect to the four issues raised by the Committee in its Decision 30 COM 7B.71, the mission observed the ...
19789.
Côte d'Ivoire,Guinea,a) Mining;
b) Influx of refugees;
c) Agricultural encroachment;
d) Deforestation;
e) Poaching;
f) Weak management capacity;
g) Lack of resources;
h) Lack of trans-boundary cooperation.,On 13 November 2012 and 28 January 2013, state of conservation reports of the property were submitted by the States Parties of Guinea and Côte d’Ivoire ...
19790.
The two Prehistoric Rock Art Sites in the Coa Valley (Portugal) and Siega Verde (Spain) are located on the banks of the rivers Agueda and Coa, tributaries of the river Douro, documenting continuous human occupation from the end of the Paleolithic Age. Hundreds of panels with thousands of animal figures (5,000 in Foz Coa and around 440 in Siega Verde) were carved over ...
19791.
Les forêts humides sont principalement localisées dans la partie orientale de Madagascar, à l'Est de la ligne de partage des eaux. Cependant des blocs forestiers relativement grands sont éparpillés sur le Haut Plateau central et dans la partie septentrionale de l'île. Le climat est de type tropical humide, caractérisé par des précipitations abondantes. Du nord vers ...
19792.
Hin Nam No National Protected Area (HNN NPA) is situated in central Lao PDR, where the Central Indochina Limestone meets the Annamite Mountain Chain. It is one of the original National Biodiversity Conservation Areas (now called NPAs) of Lao PDR established in 1993 by Decree 164 of the Prime Minister. It encompasses 82,000 ha of a large, dissected karst plateau, which ...
19793.
Gdynia is a port city located on the Baltic Sea, with its Modernist Centre which is a uniform urban complex developed as a result of a unique and dynamic process of city construction. The area covers ca. 88 ha and encompasses several hundred buildings and building complexes.
Modernist Centre of Gdynia was built as the core of the newly designed city. It followed the ...
19794.
The Hittite spring sanctuary of Eflatun Pınar lies about 100 kilometres west of Konya close to the lake of Beyşehir in a hilly, quite arid landscape. At the top of a little river valley, that flows in the further progress into the lake, the “lilac coloured spring” (translation of Eflatun Pınar) produces an astonishing quantity of ice cold, clear water. Directly ...
19795.
Indonesia,Earthquake,Since the 2006 earthquake in Yogyakarta, the Indonesian government has carried out rehabilitation work for the structural stability of the Prambanan Temples. A team from Tsukuba University, Japan has also conducted research surveys for the restoration of Prambanan Temples. In addition, the World Heritage Centre sent an expert in historic building ...
19796.
China,a) Dams;
b) Boundary modifications;
c) Mining;
d) Signage.,On 31 January 2011, the State Party submitted a report on the state of conservation of the property. This report provides an overview of the status of dam related projects and the removal of mining threats from the property, as requested in Committee Decision 32 COM 7B.11.
a) Issues related to planned dam ...
19797.
China,a) Progressive loss of integrity and authenticity due to major tourism and commercial developments in and around the property
b) No clearly defined boundary or buffer zones
c) Lack of a comprehensive Conservation Master Plan for the property and its sourroundings,On 21 January 2011, the State Party submitted a state of conservation report to the World Heritage ...
19798.
Pakistan,a) Demolition of two of the tanks and partial demolition of a third tank of the hydraulic works of the ShalamarGardens;
b) Encroachments and urban pressure;
c) Inadequate management mechanisms (including incomplete legislation, lack of financial resources);
d) Lack of definition of boundaries of the Lahore Fort and ShalamarGardens.,The State Party submitted a ...
19799.
Zimbabwe,
Poaching (issue resolved)
Oil exploration programme (issue resolved)
,The World Heritage Centre and IUCN received reports of mining threats and threats from Hotel Development to the Mana Pools National Park, Sapi and Chewore Safari Areas World Heritage property before and following the 33rd session of the World Heritage Committee (Sevilla, 2009) and have ...
19800.
Benin,a) Absence of a national legislative mechanism for the protection of cultural heritage;
b) Major deterioration of almost 50% of the earthen structural components;
c) Lack of presentation and interpretation at the site.,The State Party submitted its state of conservation report on 28 March 2010. The report provides information on the major rehabilitation, capacity ...
19801.
Jordan,
impact of new hotels under construction in the vicinity of the World Heritage site of Petra
insufficiency or non-existence of sewage disposal facilities
uncontrolled development of villages in the vicinity of the site
proliferation of shops
insufficient conservation of antiquities
construction or road widening projects leading to the site
other encroachments ...
19802.
Morocco,,On 19 February 2010, during Friday prayers, the minaret of the Khnata Bent Bekkar Mosque (formerly known under the name of Berdieyinne Mosque) at Meknes collapsed, crushing some adjacent buildings and causing a large number of victims. At the request of the Moroccan authorities, a World Heritage Centre expert mission visited the site on 19 April 2010 to assist ...
19803.
Bangladesh,a) Lack of an effective management system;
b) Lack of adequate human and financial resources;
c) Property and buffer zone boundaries not clearly defined;
d) Drainage and internal moisture contents problem.,The World Heritage Committee in Decision 32 COM 7B.64 noted the lack of progress in the implementation of the activity concerning drainage problems at the ...
19804.
Sri Lanka,a) Need for development and management plan;
b) Intrusive and illegal constructions within the Galle cricket ground impacting on the integrity of the property;
c) Potential impacts of a proposed port construction on the integrity of the property.,A UNESCO mission conducted in May 2008 considered the property to be threatened, due to the strong impact on the ...
19805.
Colombia,a) State of conservation of the fabric of monolithic sculpture;
b) Lack of management plan;
c) Lack of buffer zone;
d) Road construction through the archaeological park.,In 2006, a joint UNESCO/ICOMOSreactive monitoring mission was carried out to evaluate the impacts of the construction of a road through the archaeological park by the Yanacona indigenous ...
19806.
Peru,a) Frequent seismic activity in the region and flooding during the rainy season;
b) Demolition of houses in the Historical Centre and the restoration of the San Agustin Church;
c) Material decay and abandonment of buildings, as well as the effect of heavy traffic on historic buildings.,At its 32nd session (Quebec City, 2008), the World Heritage Committee requested the ...
19807.
Austria,a) Urban development pressure, high-rise projects with alteration of the visual integrity of the property;
b) Train station project outside the buffer zone with potential visual impacts on the property.,On 29 January 2007, the State Party submitted a comprehensive updated report about the urban planning projects inside and outside the World Heritage property. ...
19808.
Mexico,Urban development pressures in areas surrounding the property.,The State Party did not submit the design, adoption and implementation of the integrated Archaeological Site Management Plan as requested by the World Heritage Committee in 2005. Over the last two years, the State Party has undertaken several initiatives to update the existing Management Plan that was ...
19809.
Albania,Lack of management mechanisms and tourism pressure; state of conservation of the property and implementation of the recommendations of the joint missions ,The inclusion of Butrint on the List of World Heritage in Danger in 1997 was motivated by the fact that the property had been faced with serious deterioration of materials resulting in an important loss of ...
19810.
Venezuela (Bolivarian Republic of),Lack of management mechanism (including legislation); Lack of institution coordination; Floods.
Additional Details:
Heavy rains ,The Secretariat received a progress report from the State Party, drafted by the Instituto del Patrimonio Cultural (IPC), the national agency responsible for cultural heritage in Venezuela, on 19 February ...
19811.
Albania,Austria,Belgium,Bosnia and Herzegovina,Bulgaria,Croatia,Czechia,France,Germany,Italy,North Macedonia,Poland,Romania,Slovakia,Slovenia,Spain,Switzerland,Ukraine,
Lack of integrated Management Plan (in progress)
Lack of transnational research and monitoring plans (in progress)
Need for capacity building (in progress)
Inadequate regulation and management of uses and ...
19812.
Ethiopia,
Ground transport infrastructure
Identity, social cohesion, changes in local population and community
Land conversion
Livestock farming / grazing of domesticated animals
Other Threats: Declining populations of Walia ibex, Ethiopian wolf and other large mammal species
,On 3 February 2016, the State Party submitted a state of conservation report, which is ...
19813.
Kenya,
Impacts of the Gibe III dam
Other planned hydro-electric developments and associated large-scale irrigation projects in the Omo region
Oil exploration
Wildlife populations and pressure from poaching and livestock grazing
Impacts of the larger development vision for Northern Kenya
Management capacity of the Kenya Wildlife Service (KWS) and National Museums of Kenya ...
19814.
Albania,Austria,Belgium,Bosnia and Herzegovina,Bulgaria,Croatia,Czechia,France,Germany,Italy,North Macedonia,Poland,Romania,Slovakia,Slovenia,Spain,Switzerland,Ukraine,
Management systems/ management plan (lack of integrated Management Plan, lack of legal protection from logging, and inadequate management of logging in the Slovak part of the property)
Inappropriate ...
19815.
Democratic Republic of the Congo,
Armed conflict and political instability
Poaching by nationals and trans-border armed groups
Unadapted management capabilities to address the poaching crisis
,On 15 March 2019, the State Party submitted a report on the state of conservation of the property, available at http://whc.unesco.org/en/list/136/documents/, providing the following ...
19816.
Niger,
Political instability and civil strife
Poverty
Management constraints (lack of human and logistical means)
Ostrich poaching and other species
Soil erosion
Demographic pressure
Livestock pressure
Pressure on forestry resources
Gold panning
Illegal activities (increase in poaching threats and timber harvesting)
Proliferation of the invasive exotic species Prosopis ...
19817.
Mali,
Occupation of the property by armed groups
Lack of management structure at the site
Armed conflict
,On 31 January 2019, in response to Decision 42 COM 7A.14, the State Party submitted a state of conservation of the property, available at the address http://whc.unesco.org/en/list/119/documents/, which contained the following information:
In the framework of the State ...
19818.
Russian Federation,
Major linear utilities (gas pipeline construction plans)
Ground transport infrastructure (impacts of a road project across the property)
Impacts of tourism / visitor / recreation
,In 2018 and 2019, the World Heritage Centre sent three letters to the State Party regarding third party information: on 10 January 2018, regarding a gold mining license ...
19819.
Zambia,Zimbabwe,
Air pollution
Drought
Housing (uncontrolled urban development driven by population increase)
Impacts of tourism / visitor / recreation
Invasive/alien species
Major visitor accommodation and associated infrastructure
Management systems/ management plan
Solid waste
Surface water pollution
Water extraction (related to existing hydropower production)
Water ...
19820.
China,
Underround transport infrastructure (Proposed high-speed railway between Beijing and Zhangjiakou, with station at Guntiangou)
Impacts of tourism / visitor / recreation
Interpretative and visitation facilities
Materials and techniques used in restoration works undertaken in Suizhong County, Liaoning Province (issue resolved)
Partial collapse of some platforms (issue ...
19821.
Nepal,
Management Systems/Management Plan
Management activities
Legal framework
Ritual / spiritual / religious and associative uses
Commercial Development (Impact of the new structure of the Maya Devi Temple constructed in 2002 on the archaeological remains and the main sight lines of the property)
Interpretative and visitation facilities
Air pollution
Housing
Industrial ...
19822.
Italy,
A series of structural collapses at the property (issue resolved)
Inadequate restoration and maintenance; lack of skills (issue resolved)
Building projects in the vicinity of the property
Management system
Inadequate funding
Ineffective drainage systems
Visitor pressure
,On 30 November 2018, the State Party submitted a report on the state of conservation, which is ...
19823.
Panama,
Erosion and siltation/ deposition
Housing (encroachments and urban pressure)
Impacts of tourism / visitor / recreation (tourism pressure -particularly at Portobelo)
Land conversion
Management systems/ management plan (absence of a conservation and management plan)
Fragile state of the property and accelerated degradation by environmental factors, lack of ...
19824.
Senegal,
Poaching, capture and relocation of wildlife
Drying up of ponds and invasive species
Illegal logging
Livestock grazing
Road construction project
Potential dam construction
Potential mining exploration and exploitation
Loss of chimpanzee habitat
,On 31 January 2020, the State Party submitted a report on the state of conservation of the property, available at ...
19825.
Ethiopia,
Insufficient delimitation of this serial property
Lack of conservation and management plans
Lack of appropriate urban planning and building regulations
Urban encroachment and inappropriate new developments
Rising water level / seepage
Structural instability of Stele III and Mausoleum
Lack of progress on Church Museum construction
Housing
Interpretative and ...
19826.
Nigeria,
Urban development close to the property
Road construction around the property
Pollution of the Osun River
Bush fires within the property
Adverse impact of the commercialisation of the annual festival
Fragility of spiritual, symbolic and ritual qualities of the Grove in the face of a growth in visitor numbers and the lack of a tourism management plan
Road through ...
19827.
Dominican Republic,
Legal framework (undefined and unregulated buffer zone leading to urban development pressure and inadequate control of land use)
Impacts of tourism / visitor / recreation
Interpretative and visitation facilities
Vulnerability to earthquakes and hurricanes
Deterioration of historic structures derived from natural and social factors (including ...
19828.
Jordan,
Housing
Lack of a database on cultural heritage
Lack of proper conservation and maintenance of the archaeological sites
Lack of traffic and visitor management plans
Potential encroachment from development in the village of Rum
Lack of trained staff and financial resources for the management of the property
Financial resources
Governance
Human resources
Impacts of ...
19829.
Uganda,
Mining (Kilembe mine)
Staffing and budgetary deficiencies (issue resolved)
Degradation of buffer zone (issue resolved)
Climate change
Management systems/ management plan
Impacts of tourism (cable car)
Fires
,On 2 October 2019, the State Party submitted the state of conservation report. A joint World Heritage Centre/IUCN Reactive Monitoring mission subsequently ...
19830.
Indonesia,
Mining
Human resources (Security limitations)
Ground transport infrastructure (Development threats)
Fishing/collecting aquatic resources (Exploitation of marine resources)
Management systems/management plans (Absence of a co-ordinating agency, Absence of a finalized strategic management plan, Park boundaries not physically demarcated)
Financial resources ...
19831.
Kazakhstan,Kyrgyzstan,Uzbekistan,
Management systems / Management Plan (Need to finalize the transboundary management framework for the property; Need to further develop collaboration between the States Parties in the framework of a tripartite Memorandum for management of the property; Need to review and rationalize the boundaries of the components of the property and ...
19832.
Brazil,
Impacts of tourism / visitor / recreation
Water infrastructure (construction of a hydropower dam)
Ground transport infrastructure (draft law and pressure to re-open an illegal road)
Illegal logging and hunting (issue resolved)
Governance (lack of transboundary cooperation, uncoordinated development)
Lack of sustainable financing (issue resolved)
Management systems/ ...
19833.
Italy,
A series of structural collapses at the property (issue resolved)
Inadequate restoration and maintenance; lack of skills (issue resolved)
Building projects in the vicinity of the property (possible impact of the project of visitor centre at Torre Annunziata and storage facility project in Pompei)
Management system
Inadequate funding
Ineffective drainage ...
19834.
Sudan,
Financial resources: Need to continue to increase financial resources and commit to maintain ongoing sustainable financing
Lack of high quality resolution maps that clearly define the boundaries of the property and the buffer zone (resolved)
Management systems/ management plan: Need to update the management plan for Sanganeb Marine National Park and Dungonab Bay to ...
19835.
Nepal,
Management Systems/Management Plan
Management activities
Legal framework
Ritual / spiritual / religious and associative uses
Commercial Development (Impact of the new structure of the Maya Devi Temple constructed in 2002 on the archaeological remains and the main sight lines of the property)
Interpretative and visitation facilities
Air pollution
Housing
Industrial ...
19836.
Argentina,Belgium,France,Germany,India,Japan,Switzerland,
Management systems / management plan (Need to introduce Heritage Impact Assessment procedures for proposed development at all component sites; Lack of monitoring indicators for all component sites and of agreed overall conservation approaches and procedures for the series (issue resolved); Need to complete the ...
19837.
Chile,
Emergency situation due to the massive fire of April 2014 (issue resolved)
Interventions planned at the port, such as the Barón Port and the Prat Dock, as well as for touristic facilities and real estate projects
Fragmentation of competencies and mandates by sectors and by different levels of government, as well as by the different types of specific protection and ...
19838.
Indonesia,
Ineffectual legal and institutional framework for the management and protection of the property (issue resolved);
Impacts on the stone of Borobudur Temple from the use of epoxy resin, steam cleaning and water repellants (issue resolved).
,On 8 April 2020, the World Heritage Centre requested that the State Party of Indonesia clarify information provided by a ...
19839.
Le Portail du monastère de Ripoll, construit au XIIe siècle, est un chef-d'œuvre de l'art roman, un arc de triomphe grandiose et majestueux qui mène à l'église de Santa Maria. Il s'agit d'une pièce unique qui a été surnommée la "Bible en pierre", et elle est considérée comme un point de repère incontesté dans l'art roman catalan et une bannière de la culture monastique ...
19840.
L’Ancien port d’embarquement des esclaves de Loango, surplombé par l’ancienne lagune Tchibete (en voie de disparition), est situé dans la sous-préfecture de Hinda dans le département du Kouilou. Il est limité au Sud-est par la Pointe indienne, au Sud et au Sud-ouest par l'océan Atlantique, au Nord-ouest par le village Matombi et au Nord-est par le village ...
19841.
France,,In February 2012, the World Heritage Centre and IUCN were informed of the granting by the State Party of a prospection permit for liquid or gaseous hydrocarbons adjacent to the property. Following a letter from the World Heritage Centre regarding this issue, the State Party provided the World Heritage Centre with an information note on 30 March 2012 concerning the ...
19842.
Poland,,Following the receipt of information and reportsfrom numerous NGOs and individuals, the World Heritage Centre requested the State Party to submit a state of conservation report, including clarifications regarding the modernisation and enlargement of the original Main Terrace Restaurant pavilion, all works carried out to protect the Szczytnicki Park and the Great ...
19843.
Nepal,a) Lack of a conservation policy and inappropriate management of the property;
b) Impact on the archaeological remains, as well as on the visual integrity of the property by the Maya Devi Temple constructed in 2002.,At its 32nd session (Quebec City, 2008), the World Heritage Committee had requested the State Party to develop, in consultation with the World Heritage ...
19844.
Sri Lanka,a) Post tsunami response;
b) Need for development and management plan;,Following concerns expressed by the National Commission of Sri Lanka with regard to the construction of an international test cricket stadium in the buffer zone of the property, as well as a port development project in the Bay of Galle, two missions have been undertaken to assess the situation ...
19845.
China,a) Urban development pressure;
b) Tourism pressure;
c) Lack of documentary evidence and clearly formulated principles to guide the conservation works. ,On 30 January 2007, the World Heritage Centre received the state of conservation reports of the World Cultural Heritage properties of the Imperial Palace in Beijing, the Temple of Heaven, and the Summer Palace from ...