English Français

State of Conservation

  • Results
  • Views
  • Exports
737
Reports
133
Properties
28
States Parties
Previous 1 ...  13 14 15 16 17 18 19 ...  37  See All
Australia
Year: 1991
Document Source: SC.91/CONF.002/04
Threats*:Management systems/ management plan Mining
Australia
Year: 1986
Document Source: CC.86/CONF.003/INF.4,CC.86/CONF.001/11
Threats*:Management systems/ management plan Mining
Nepal
Year: 2016
Document Source: WHC/16/40.COM/7B.Add
Threats*:Air transport infrastructure Earthquake Ground transport infrastructure Housing Management systems/ management plan Underground transport infrastructure
Nepal
Year: 2015
Document Source: WHC-15/39.COM/7B.Add,WHC-15/39.COM/INF.7,WHC-15/39.COM/INF.7Rev
Threats*:Air transport infrastructure Earthquake Ground transport infrastructure Housing Management systems/ management plan
Nepal
Year: 2013
Document Source: WHC-13/37.COM/7B
Threats*:Air transport infrastructure Ground transport infrastructure Housing Management systems/ management plan
Nepal
Year: 2012
Document Source: WHC-12/36.COM/7B.Add
Threats*:Housing Management systems/ management plan
Nepal
Year: 2011
Document Source: WHC-11/35.COM/7B
Threats*:Housing Management systems/ management plan
Nepal
Year: 2008
Document Source: WHC-08/32.COM/7B
Threats*:Housing Management systems/ management plan
Nepal
Year: 2007
Danger List: Yes
Document Source: WHC-07/31.COM/7A.Add
Threats*:Housing Management systems/ management plan
Nepal
Year: 2006
Danger List: Yes
Other Threats: loss of traditional urban fabric
Document Source: WHC-06/30.COM/7A
Threats*:Housing Management systems/ management plan
Nepal
Year: 2005
Danger List: Yes
Document Source: WHC-05/29.COM/7A
Threats*:Housing Management systems/ management plan
Nepal
Year: 2004
Danger List: Yes
Other Threats: Fire
Document Source: WHC-04/28.COM/15A.Rev
Threats*:Deliberate destruction of heritage Housing Illegal activities Legal framework Management systems/ management plan
Nepal
Year: 2003
Other Threats: Need for restoration/consolidation works
Document Source: WHC.03/27.COM/07B,WHC.03/27.COM/INF.07C
Threats*:Effects arising from use of transportation infrastructure Housing Land conversion Management activities Management systems/ management plan
Nepal
Year: 2001
Other Threats: Need for restoration/consolidation works
Document Source: WHC.01/CONF.208/10
Threats*:Effects arising from use of transportation infrastructure Housing Land conversion Management activities Management systems/ management plan
Nepal
Year: 2000
Other Threats: Need for restoration/consolidation works
Document Source: WHC.00/CONF.202/05,WHC-00/CONF.203/INF.4,WHC.00/CONF.204/10,WHC-2000/CONF.204/INF.21,WHC.00/CONF.204/INF.22
Threats*:Effects arising from use of transportation infrastructure Housing Land conversion Management activities Management systems/ management plan
Nepal
Year: 1999
Other Threats: Need for restoration/consolidation works
Document Source: WHC.99/CONF.204/05,WHC-99/CONF.204/INF.19,WHC.99/CONF.209/14,WHC.99/CONF.208/INF.8A,WHC.99/CONF.208/INF.8B,WHC.99/CONF.208/INF.8C,WHC.99/CONF.204/INF.19
Threats*:Effects arising from use of transportation infrastructure Housing Land conversion Management activities Management systems/ management plan
Nepal
Year: 1998
Other Threats: Need for restoration/consolidation works
Document Source: WHC.98/CONF.201/3B,WHC.98/CONF.203/08Rev,WHC-98/CONF.202/INF.6
Threats*:Effects arising from use of transportation infrastructure Housing Land conversion Management activities Management systems/ management plan
Nepal
Year: 1997
Other Threats: Need for restoration/consolidation works
Document Source: WHC.97/CONF.208/04B,WHC.97/CONF.204/02B,WHC.97/CONF.208/08B
Threats*:Effects arising from use of transportation infrastructure Housing Land conversion Management activities Management systems/ management plan
Nepal
Year: 1996
Other Threats: Need for restoration/consolidation works
Document Source: WHC.96/CONF.201/07B
Threats*:Effects arising from use of transportation infrastructure Housing Land conversion Management activities Management systems/ management plan
Nepal
Year: 1995
Other Threats: Need for restoration/consolidation works
Document Source: WHC.95/CONF.203/05,WHC.95/CONF.201/04,WHC.95/CONF.203/05 Add.1
Threats*:Effects arising from use of transportation infrastructure Housing Land conversion Management activities Management systems/ management plan
Previous 1 ...  13 14 15 16 17 18 19 ...  37  See All
Properties
Categories
Regions
Threats
Management systems/ management plan (439) Housing (179) Ground transport infrastructure (149) Illegal activities (148) Impacts of tourism / visitor / recreation (136) Management activities (107) Financial resources (83) Legal framework (78) Land conversion (64) Human resources (64) Mining (63) Civil unrest (61) Major visitor accommodation and associated infrastructure (50) Water infrastructure (47) Identity, social cohesion, changes in local population and community (42) Interpretative and visitation facilities (37) Deliberate destruction of heritage (36) Invasive/alien terrestrial species (36) Commercial development (32) Effects arising from use of transportation infrastructure (32) Water (rain/water table) (31) Fishing/collecting aquatic resources (30) Forestry /wood production (25) Marine transport infrastructure (24) Storms (21) Relative humidity (20) Ritual / spiritual / religious and associative uses (20) Water (extraction) (18) Changes in traditional ways of life and knowledge system (17) Society's valuing of heritage (16) Governance (15) Air pollution (14) Other climate change impacts (14) Earthquake (14) Crop production (13) Flooding (13) Erosion and siltation/ deposition (13) Major linear utilities (12) Air transport infrastructure (11) Surface water pollution (11) Industrial areas (10) Fire (widlfires) (10) Ground water pollution (9) Solid waste (9) Changes to oceanic waters (9) Temperature change (9) Invasive / alien freshwater species (9) Underground transport infrastructure (8) Livestock farming / grazing of domesticated animals (8) Localised utilities (7) Non-renewable energy facilities (7) Commercial hunting (7) Oil and gas (7) High impact research / monitoring activities (7) Quarrying (5) Avalanche/ landslide (5) Volcanic eruption (5) Drought (3) Tsunami/tidal wave (3) Wind (2) Renewable energy facilities (1) Input of excess energy (1) Subsistence wild plant collection (1) Temperature (1) Indigenous hunting, gathering and collecting (1) Terrorism (1) Invasive / alien marine species (1)


* : The threats indicated are listed in alphabetical order; their order does not constitute a classification according to the importance of their impact on the property.
Furthermore, they are presented irrespective of the type of threat faced by the property, i.e. with specific and proven imminent danger (“ascertained danger”) or with threats which could have deleterious effects on the property’s Outstanding Universal Value (“potential danger”).

** : All mission reports are not always available electronically.