State of Conservation (SOC)

Port, Fortresses and Group of Monuments, Cartagena (2012)

UNESCO Extra-Budgetary Funds
International Assistance granted to the property

Requests Approved: 0 (from1988-1999)
Total Amount Ap proved: 108,800USD

1999   Technical Co-operation request for the Integral Conservation of ...   60,000  USD
1993   Provision of experts for the preparation of a master plan for the ...   19,000  USD
1991   Contribution to a monitoring exercise of the following sites: ...   3,300  USD
1990   Preparation of legislation for the preservation of the historical ...   5,000  USD
1989   Additional contribution to a seminar on the conservation of ...   7,500  USD
1988   Specialists to advise on the protection and restoration of ...   14,000  USD
Missions**

2003: ICOMOS reactive monitoring mission; 2006: joint World Heritage Centre/ICOMOS reactive monitoring mission.

Factors* affecting the property identified in previous reports

a) Construction of TRANSCARIBE, a new public transportation system and its impact on the wall;

b) Lack of a regulatory conservation management system for the property;

c) Impact of the harbour public works on the fortifications of Cartagena;

d) Need for urban regulations for the protected area;

e) Lack of a Management Plan.

Corrective Measures
Current conservation issues

The State Party submitted a state of conservation report on 30 March 2012 which succinctly responds to the Decisions made by the World Heritage Committee at its 34th session (Brasilia, 2010).

a) Delimitation of the property

The State Party submitted the demarcation of the group of monuments located within the Historic Centre which follows, as previously reported, the delimitation proposed by the Special Protection and Management Plan (PEMP). This will be reviewed within the framework of the Retrospective Inventory process of the Periodic Reporting Exercise for Latin America and the Caribbean. As for the forts located outside this area, their delimitation continues to be pending, although efforts have been made in the development of management and protection plans.

b) Conservation study and conservation action plan for the ensemble of walls and the fortified city

This report was submitted to the World Heritage Centre in December 2010. The report considers actions to be implemented at part of the property, which include strengthening of residential and touristic activities, including restoration of historic areas for housing, changing inappropriate use of buildings and implementing strategic projects in different areas. Among these, the restoration of several buildings is foreseen as well as the recovery and adaptation of public spaces. There are plans also to improve educational facilities and services, as well as enhancement of touristic infrastructure and services, particularly through the recovery of public spaces. Special actions are foreseen to improve the connection between the Historic Centre and its surroundings.

c) Special Plan for Management and Protection (PEMP)

The State Party reports that the document is under final review by the Ministry of Culture. The financial tools to secure resources for implementation have yet to be finalized but it is expected that the document would be submitted by the end of April 2012 to the World Heritage Centre. The legal approval of the Plan is pending, however the State Party reports that upon obtaining it, the implementation of projects and provisions made will start. No timeframe has been provided on when this is expected to occur.

Conclusion

The World Heritage Centre and the Advisory Bodies note that until the delimitation of all component parts of the property is complete, the process cannot be fully considered.

The World Heritage Centre and the Advisory Bodies also note that the development of the Special Protection and Management Plan has been finalized, but however express their concerns that a lengthy approval process will preclude the possibility to systematically implement the provisions made. They finally note that it is critical that the boundaries of all component parts of the property are clearly identified so that the integrity of the property is maintained. 

Decision
  • Adopted

  • Draft Decision

36COM7B.98
Link to the decision

The World Heritage Committee,

1.   Having examined Document WHC-12/36.COM/7B.Add,

2.   Recalling Decision 34 COM 7B.107, adopted at its 34th session (Brasilia, 2010),

3.   Notes the finalization of the Special Protection and Management Plan for the property, and urges the State Party to finalize its approval process as soon as possible, and to secure the required resources to guarantee the sustained implementation of the provisions made; and requests the State Party to provide copies of this Plan to the World Heritage Centre and the Advisory Bodies for review;

4.   Acknowledges the development of the conservation action plan for the ensemble of walls and the fortified city, and also requests the State Party to begin the implementation of identified priority measures;

5.   Reiterates its request to the State Party finalize the delimitation of the property, including all elements of the fortified system according to the required formats, and to submit it to the World Heritage Centre and the Advisory Bodies for their consideration and review;

6.   Further requests the State Party to submit to the World Heritage Centre, by 1 February 2014, an updated report on the state of conservation of the property and the implementation of the above, for examination by the World Heritage Committee at its 38th session in 2014. 

Draft Decision: 36 COM 7B.98

The World Heritage Committee,

1. Having examined Document WHC-12/36.COM/7B.Add,

2. Recalling Decision 34 COM 7B.107, adopted at its 34th session (Brasilia, 2010),

3. Notes the finalization of the Special Protection and Management Plan for the property, and urges the State Party to finalize its approval process as soon as possible, and to secure the required resources to guarantee the sustained implementation of the provisions made; and requests the State Party to provide copies of this Plan to the World Heritage Centre and the Advisory Bodies for review;

4. Acknowledges the development of the conservation action plan for the ensemble of walls and the fortified city, and also requests the State Party to begin the implementation of identified priority measures;

5. Reiterates its request to the State Party finalize the delimitation of the property, including all elements of the fortified system according to the required formats, and to submit it to the World Heritage Centre and the Advisory Bodies for their consideration and review;

6. Further requests the State Party to submit to the World Heritage Centre, by 1 February 2014, an updated report on the state of conservation of the property and the implementation of the above, for examination by the World Heritage Committee at its 38th session in 2014. 

Port, Fortresses and Group of Monuments, Cartagena
State Party:
Colombia
Date of Inscription: 1984
Nomination records (Year): 1983
Category: Cultural
Criteria: (iv)(vi)
Exports
Word File
SOC Reports (year)
2012
2010
2008
2004
1993
Threats*
  • Ground transport infrastructure
  • Marine transport infrastructure
  • Effects arising from use of transportation infrastructure
  • Legal framework
  • Management systems/ management plan
  • Other Threats:


* : The threats indicated are listed in alphabetical order; their order does not constitute a classification according to the importance of their impact on the property.
Furthermore, they are presented irrespective of the type of threat faced by the property, i.e. with specific and proven imminent danger (“ascertained danger”) or with threats which could have deleterious effects on the property’s Outstanding Universal Value (“potential danger”).

** : All mission reports are not always available electronically.